Preliminaries Cost Estimation
Drafting Plans and specifications 25000
Surveyor Identification survey, footings/slab, etc. 15000
Soil Engineer Soil investigation 27000
Town Planning Building permit 550000
Council & Water Board DA and BA 195000
Engineer Design of slab and structural steel beams 26000
Additional Costs Certificate of Compliance NA
Construction insurance NA
Finance application NA
Solicitor fees NA
Design costs NA
Flood report NA
Quality control inspection fees NA

Hire Equipment Cost


Estimation
Equipment Breakdown Site toilet and temporary power NA
Scaffolding, roof safety rail, crane NA
Stump hole digger NA

Excavation Cost Estimation


Excavator Breakdown Dig foundations 80000
Excavate site (if required) 60000
Rock blasting NA
Final clean-up on completion 25000

Concrete Cost Estimation Slab including all materials and reinforcing 1800000
Concrete paving/drive/crossing 125000
Concrete piles 85000
Concrete foundations and reinforcing 900000
Labour 300000

Brickwork Cost Estimation


Brickwork Breakdown Cement & limil (line) and sand & mortar colour 200000
Face bricks 1st quality 800000
Labour 750000
Scaffold hire 125000

Carpentry Cost Estimation


Carpenter Breakdown Materials only and to include floor
Base frame, wall frame, roof frame and trusses
Flooring, wet area floors and nails/glue,
External linings/cladding/eaves/metal fascia and
weatherboards
450000
Labour to erect all structural timbers
Wet area flashing system/water proofing (supply
and install)
Windows (supply and install)
Metal post supports

Fix Out Cost Estimation


Fix Out Breakdown
(All Items to include all
Fixings
e.g. Nails/Hinges) Labour 112500
Door furniture/sliding door units etc. (supply and
install)
Doors
Kitchen cupboards/laundry cupboards and
benchtops
50000
Manhole frame and cover
Insulation, sarking etc.
Skirting/architraves/jambs
Stairs, handrailing and balastrading
Strip flooring
External Finish Cost
Estimation
External Finish Breakdown Rendering and colour finish 250000

Internal Linings Cost


Estimation
Internal Linings Breakdown Ceilings
Cornices
250000
Walls
Wet area linings
Labour 200000

Structural Steelwork Cost


Estimation
Structural Steelwork Beams/columns/lintels etc. 1200000

Electrical Cost Estimation


Electrical Breakdown Light fittings 75000
Supply and installation of electrical services 250000
Temporary power supply/underground power 25000

Plumber/Drainer Cost
Estimation

Carry out all necessary plumbing & drainage


Plumber/DrainerBreakdown including guttering, valleysand downpipes 250000

Roofer Cost Estimation


Supply & install roofing complete including all
Roofer Breakdown necessary sarkings /fittings 400000

Tiler Cost Estimation


Tiler Breakdown Floors - m
Walls - m
Fitting and sheeting 650000
Special items - glue, grout etc.
Labour
Total Cost Involved Rs.10250500/-