Home(/)Construction

Cost Calculator
English 

Building Estimation Calculator

Reset (/tools/cost-calculator)

Total Estimated Cost (INR)

Total Estimated Cost of Construction

₹4234080

Cost per sqfeet of House Construction

₹1411

Phase : Percentage of construction costs INR in %

Home Design and Approval

Excavation

Footing and Foundation

RCC Work - Pillars, Columns, Slabs

Roof Slab

Brickwork and Plastering

Flooring and Tiling

Electric Wiring

Water Supply and Plumbing

Doors and Windows

Painting

Furnishing

Get In Touch
(/) English

5.5% 2.5%3.0%
6.0%
12.0%
8.0%

5.0% 10.0%

8.0%
13.0%
10.0%
17.0%

UBS Stores
Locator

Contractors
Locator

Dealers
Locator

Timeline : Phase : Cost (INR%)

Get In Touch
20% 400
(/) English

15% 300

10% 200

5% 100

0% 0

Electric Wiring
Brickwork and Plastering
Flooring and Tiling

Doors and Windows


Furnishing
RCC Work - Pillars, Columns, Slabs
Roof Slab
Home Design and Approval

Painting
Excavation

Water Supply and Plumbing


Footing and Foundation

Resource Unit Quantity Quality Amount

Cement Bag 1350 - + ₹487350


UltraTech Super

Steel KG 10500 - + ₹535500


Premium Grade

Bricks Per Piece 57000 - + ₹456000


Premium Grade

Aggregate Per Cubic feet 5700 - + ₹205200


Premium Grade

Sand Per Cubic feet 6000 - + ₹240000


Premium Grade

Flooring Per Sq feet 3000 - + ₹390000


Premium Grade

Windows Per Sq feet 510 - + ₹124440


Premium Grade

Total Amount Get In Touch INR 4234080


Resource Unit Quantity Quality Amount
(/) English

Doors Per Sq feet 540 - + ₹189540
Premium Grade

Electrical fittings Per Sq feet 450 - + ₹46350


Premium Grade

painting Per Sq feet 18000 - + ₹504000


Premium Grade

Sanitary Fittings Per Sq feet 3000 - + ₹225000


Premium Grade

Kitchen Work Per Sq feet 165 - + ₹200700


Fully Modular

Contractor(RCC,BrickWork,plasterwork) Per Sq feet 3000 - + ₹630000


Premium Grade

Total Amount INR 4234080

 Print
Final Estimate

 Share
Final Estimate

Disclaimer: The costs indicated are approximate costs for each resource. Actual
cost estimates may vary for your city. Please check with your contractor or visit
our nearest UBS store for a custom cost estimate as per your requirement. This
amount is an approximate amount for construction area & it does not include
compound wall area.

*Available at UltraTech Building Solutions outlets

**The default quality is set to medium. You can change this by clicking the arrow
buttons.

Get In Touch

You might also like