You are on page 1of 4

For Budgets Under $500,000

ENTER BUDGET BELOW Aspect of the Project


$350,000.00 Site Prep
Foundation
Log Package
Framing
Utilities (septic, driveway, power)
Plumbing
Electrical
Roofing
Windows
Exterior Stain
Siding
Wall Covering & Ceiling
Kitchen
Floors
Fixtures
Heating / Cooling
Trim & Doors
Permits / Contracting

TOTAL

Potential Extras
Architect
Landscaping
Extra long driveway
% of Total $ Amount
Budget
1.40% Available
$4,900.00
5.50% $19,250.00
29.00% $101,500.00
9.50% $33,250.00
4.00% $14,000.00
3.25% $11,375.00
3.25% $11,375.00
2.50% $8,750.00
2.50% $8,750.00
2.25% $7,875.00
3.75% $13,125.00
2.75% $9,625.00
3.25% $11,375.00
3.00% $10,500.00
1.75% $6,125.00
3.50% $12,250.00
2.25% $7,875.00
16.60% $58,100.00

$350,000.00
For Budgets Over $500,000

ENTER BUDGET BELOW Aspect of the Project


$550,000.00 Site Prep
Foundation
Log Package
Framing
Utilities (septic, driveway, power)
Plumbing
Electrical
Roofing
Windows
Exterior Stain
Siding
Wall Covering & Ceiling
Kitchen
Floors
Fixtures
Heating / Cooling
Trim & Doors
Permits / Contracting

TOTAL

Potential Extras
Architect
Landscaping
Extra long driveway
% of Total $ Amount
Budget
1.70% Available
$9,350.00
5.90% $32,450.00
25.00% $137,500.00
11.00% $60,500.00
3.00% $16,500.00
3.50% $19,250.00
3.50% $19,250.00
2.90% $15,950.00
3.75% $20,625.00
2.65% $14,575.00
2.50% $13,750.00
2.50% $13,750.00
2.80% $15,400.00
3.90% $21,450.00
2.00% $11,000.00
4.50% $24,750.00
3.00% $16,500.00
15.90% $87,450.00

$550,000.00