Sylvan Construction Services, LLC Subcontract

3495 Piedmont Rd NE
Building 11, Suite 300
Atlanta GA 30305 Subcontract#: 11581
404-831-4990
Subcontract Date: 12/14/2021
License:

To: White Oaks Aligned, LLC Project: 154094


4 14th Street 105 Border Rock Rd
Suite 601 105 Border Rock Rd
Hoboken NJ 07030 Levittown PA 19057-3005

You are hereby directed to perform the following work per


the plans and specifications provided. Plans Attached

Retention Rate: 0 % Specifications Attached

Description of Work Cost Code Description Amount

Exterior 10.000 Exterior 500.00


pressure wash house and all concrete surfaces
Drywall 16.000 Drywall 250.00
Additional drywall repairs due to existing condition.
Electrical 12.000 Electrical 700.00
Install new white TR receptacles, switches, GFCIs, cover plates. Install GFCIs in all wet areas including Laundry washer.
Miscellaneous 24.000 Miscellaneous 150.00
Install new mailbox with house numbers and 4x4 wooden post. Set post in Quikrete.
Paint 17.000 Paint 2,050.00
Remove all nails, screws, shelves, brackets, cut loose cable and low voltage wiring flush to wall or box. Repair all holes.
Skim coat rough walls, sand and smooth to paint condition. Paint all walls SW #7029 Agreeable Gray Eggshell finish. Paint
all ceilings white. Paint all doors & trim SW #7005 Pure White Satin finish.(1000 sq ft.)
Windows/Doors 8.000 Windows / Doors
Install(1) new window sash in(Bathroom).
Miscellaneous 24.000 Miscellaneous 1,800.00
Close up area under window , add framing , insulation , drywall , OSB ,siding felt paper , and siding(match color to existing
close as possible )
Plumbing 13.000 Plumbing 35.00
Install pop up in bath tub
Plumbing 13.000 Plumbing 200.00
Insulate water heater and pipes in attic
Miscellaneous 24.000 Miscellaneous 50.00
Repair dryer vent exhaust cap

Amount of Subcontract 25,685.00

Contractor Date

Subcontractor Date
Subcontract Subcontract#:11581
Continued... Date: 01/21/2022

Description of Work Cost Code Description Amount

Exterior 10.000 Exterior 50.00


Add and install(2) splash blocks
Insulation 15.000 Insulation 1,400.00
Install(1000) sq ft blown insulation to bring to R30 level(10-12”).
HVAC 14.000 HVAC 700.00
Install HVAC cage with 4-digit padlock.
Flooring 20.000 Flooring 650.00
clean grout
Appliances 21.000 Appliances 150.00
Install(3) appliance(s). Leave paperwork in kitchen drawer. Includes anti tip device. Includes high loop at dishwasher drain.
Miscellaneous 24.000 Miscellaneous
Install new electrical and plumbing for new dishwasher install.
Appliances 21.000 Appliances
Install dishwasher kit
Cabinets 18.000 Cabinets
Remove existing cabinets, install(7) lin ft new builder grade base cabinets. move sink to the left to make room for
dishwasher on the right
Cabinets 18.000 Cabinets
Remove existing countertops, install(11) lin ft Laminate Countertop - Typhoon Ice color.
Cabinets 18.000 Cabinets
Remove existing cabinet above washer. install to the right of washer above new location of fridge
Windows/Doors 8.000 Windows / Doors 300.00
Install(2) hollow core raised panel closet sliders doors
Plumbing 13.000 Plumbing
replumb sink plumbing and drains to the left where new location of sink will be
Windows/Doors 8.000 Windows / Doors 540.00
Install(3) raised panel, hollow core, pre-hung interior door and matching hardware.
Interior Finish 22.000 Interior Finish 125.00
Install 3-Piece Accessory Kit(paper holder, towel ring(next to sink), towel hook - Glacier Bay Mandouri - Brushed Nickel.
Management 25.000 Management
Plumbing Details: Water supply from meter to house is _copper__. Water supply under house to fixtures is _copper__.
Drain pipes are __copper_.
Cleaning 23.000 Cleaning 350.00
Post Construction Professional Clean - includes floors, appliances, light fixtures, vent fan grills in all bathrooms, plumbing
fixtures, cabinets, counters, appliances, dusting, vacuuming.
Interior Finish 22.000 Interior Finish 250.00
Install door stops on all doors, cut interior cable wires, and provide cover plates. Caulk and seal all wet areas, install
batteries, light bulbs, 3 air fresheners. Install one new HVAC filter and leave one on site, spray window tracks with Orange
Pledge.
Plumbing 13.000 Plumbing 500.00
Remove cleanout cap, camera, and video main drain line to street or septic tank and provide video.
HVAC 14.000 HVAC 6,800.00
Install 14 SEER, R-410A,(1.5) Ton Complete System. System replacement includes condenser and furnace,
non-programmable digital thermostat, duct work, new line set, whip connected to existing outside 220V disconnect.
Landscaping 3.000 Landscape 500.00
Mow yard and edge beds at end of project. Trim bushes & hedges, to have no contact with home. Trim bushes and hedges

Page 2
Subcontract Subcontract#:11581
Continued... Date: 01/21/2022

Description of Work Cost Code Description Amount

below windows to not block the view. Trim tree limbs that are hazardous, are contacting the roof or side of home, or are
blocking egress. Install pine straw against the foundation wall on 4 sides. Includes seed and straw bare areas, install black
mulch in all beds if on front or sides of home.
Interior Finish 22.000 Interior Finish 640.00
Install(16) 1” white vinyl mini blinds.
Cabinets 18.000 Cabinets
Install missing cabinet above fridge. Match existing as close as possible.
Miscellaneous 24.000 Miscellaneous 250.00
Clean out fireplace box and paint black. Install cover front of box and make inoperable. Install sign which reads "Caution:
Fireplace is sealed DO NOT USE."
Plumbing 13.000 Plumbing 50.00
Repair bathroom sink drain pipe
Cleaning 23.000 Cleaning 150.00
Clean debris from gutters. Blow leaves to edge of yard.
Electrical 12.000 Electrical 305.00
Install(3) smoke alarms in bedrooms and(1) smoke/CO combo alarm on every level.
Electrical 12.000 Electrical 75.00
Install(1) timer switch to operate bathroom exhaust fan.
Trash 2.000 Trash 550.00
Remove and haul away all debris from interior and exterior.
Trash 2.000 Trash 750.00
30 yd - Dumpster, Fees, and Haul Off.
Plumbing 13.000 Plumbing 1,200.00
Install new(40) gallon(electric) water heater w/expansion tank.
Appliances 21.000 Appliances
Purchase dishwasher install kit.
Miscellaneous 24.000 Miscellaneous
Install new electrical and plumbing for new dishwasher install.
Electrical 12.000 Electrical 150.00
Secure loose wires to ceiling joists and install junction boxes on all wire splices and terminations.
Windows/Doors 8.000 Windows / Doors 150.00
Install(1) raised panel bifold doors - includes hardware.
Management 25.000 Management
washer and dryer will have to be a stackable unit in kitchen
Electrical 12.000 Electrical 75.00
Install(1) timer switch to operate bathroom exhaust fan.
Miscellaneous 24.000 Miscellaneous 300.00
remove and repir exhaust fan
Electrical 12.000 Electrical 150.00
Replace diningroom chandlier
Electrical 12.000 Electrical 150.00
Replace livingroom fan
Drywall 16.000 Drywall 500.00
remove backsplash and fix drywall for paint
Windows/Doors 8.000 Windows / Doors 1,050.00
install(2) new exterior doors no storm doors

Page 3
Subcontract Subcontract#:11581
Continued... Date: 01/21/2022

Description of Work Cost Code Description Amount

Electrical 12.000 Electrical 140.00


7) led recessed trims
Windows/Doors 8.000 Windows / Doors 550.00
replace kitchen window
Foundations 5.000 Foundations 300.00
seal holes in foundation
Windows/Doors 8.000 Windows / Doors 150.00
repair bathroom window

Notes