Professional Documents
Culture Documents
WIN
Sr. No. Description L H No. Qty Unit Rate Amount
NO.
1 REMOVING EXSITING GLASS & COVER WITH PLY.
Removing existing GLASS with cutting existing silicone & safly
place at nearby & cover openable area with 8/6mm water - 1.5 2.00 1 1.00 No 12,500.00 12,500.00
proof ply & with top cover with for drain water.
2 DESING & ENGINEERING.
Design & engineering work. - 1.5 2.00 1 1.00 No 20,000.00 20,000.00
3 RE-FIXING NEW OPENABLE PANLE
Design, supply, fabricaiton & installlation of exising glass with
new openable alum. outer / sash with anodizing to match
with existing colour & hardware make of GIESSE, KINLONG,
LAVAAL, COTSWOLD, LGF OR EQUIVALENT. Microwave cured
- 1.5 2.00 1 1.00 No 35,000.00 35,000.00
EPDM gaskets to acomodate glass thickness as per structural
requirement, structre sealants, SS 316 grade screws of
approved make, all in complete required to perform as per
specification.
4 SCAFFOLDING ON RENT BASIS
M.S. "H" type frame scaffolding with all including hardware,
eraction & dismantling as per requirement, labour, loading, - 0 - 1 1.00 No 18,000.00 18,000.00
unloading, transportation all include in given rate.
5 FINISHING ITEM
Clean & clear ACP area & remove wastage ACP from building
- 1.5 2.00 1 1.00 No 2,000.00 2,000.00
premises.
Total Amount 87,500.00
Payment Terms
1 50% against material delivery at Site. (Pro rata basis)
2 50% against completion of work.
Thanking You
For
ULTIMATE ALUMINIUM