ATTENTION Mr,SAMOSIL MENA

CLIENT SAMOSIL MENA


LOCATION DIP

DATE 04 October 2023

REF ZZ-YOBM-1023-13

QUOTATION FOR SANOSIL MENA DIP


SL.NO DESCRIPTION UNIT QTY RATE AMOUNT
#REF! QTY 1 920
1 SS MES COVRING FOR WINDOW
Supply and installation of DIOMOND MESH with Galvanized Steel
1.01 QTY 1 1750 1750
Metal frame
Supply and installation of DIOMOND MESH with Galvanized Steel
1.02 Metal frame to windows in the bathroom with the addition of an exhaust QTY 1 675 675
fan and applying a layer of clear acrylic.
2 Electrical works
Transferring the fingerprint entry control panel from the exterior wall of
2.01 the building to the interior, along with the necessary electrical work and ls 1 1150 1150
connections.
Supplying and installing ceiling lights in the office room and entirance
2.02 QTY 6 250 1500
with dimensions of 60x60, including electrical wiring and connections.
3 Painting work
3.01 Painting the walls of the office room and the corridor (white colo). SQM 40 35 1400
4 Civil work
Disassembling and relocating the aluminum external door measuring 90
4.01 cm by 200 cm, along with other civil work such as plastering, applying ls 1 1550 1550
silicone, and painting.
Closing the upper openings of the main door, measuring 40 cm by 6
meters, with metal sheets, in addition to closing the transom opening
4.02 ls 1 2650 2650
with a fire-resistant material. Also, sealing the gaps resulting from
installation with fire-resistant foam.
5 Plumbing work
Removing the bathroom Toilet, installing a special conversion pice,
5.01 ls 1 350 350
reassembling it, and applying silicone.
Total in Dirhams : Eleven Thousand Twenty Five Only 11,025.00
Special Notes
1 5 % vat will be additional
2 If there any additional in Qty or work consider as variations
PAYMENT TERMS
1 40% Advance &60% on completion