This document is a quotation for renovation work at Samosil Mena's property in DIP. It provides pricing for various renovation tasks including installing mesh window coverings, relocating an electrical control panel and lights, painting walls, reconfiguring doors, and replacing a bathroom toilet. The total cost is 11,025 AED plus 5% VAT. Payment will be made in two installments with 40% as an advance and the remaining 60% on completion.
This document is a quotation for renovation work at Samosil Mena's property in DIP. It provides pricing for various renovation tasks including installing mesh window coverings, relocating an electrical control panel and lights, painting walls, reconfiguring doors, and replacing a bathroom toilet. The total cost is 11,025 AED plus 5% VAT. Payment will be made in two installments with 40% as an advance and the remaining 60% on completion.
This document is a quotation for renovation work at Samosil Mena's property in DIP. It provides pricing for various renovation tasks including installing mesh window coverings, relocating an electrical control panel and lights, painting walls, reconfiguring doors, and replacing a bathroom toilet. The total cost is 11,025 AED plus 5% VAT. Payment will be made in two installments with 40% as an advance and the remaining 60% on completion.
SL.NO DESCRIPTION UNIT QTY RATE AMOUNT #REF! QTY 1 920 1 SS MES COVRING FOR WINDOW Supply and installation of DIOMOND MESH with Galvanized Steel 1.01 QTY 1 1750 1750 Metal frame Supply and installation of DIOMOND MESH with Galvanized Steel 1.02 Metal frame to windows in the bathroom with the addition of an exhaust QTY 1 675 675 fan and applying a layer of clear acrylic. 2 Electrical works Transferring the fingerprint entry control panel from the exterior wall of 2.01 the building to the interior, along with the necessary electrical work and ls 1 1150 1150 connections. Supplying and installing ceiling lights in the office room and entirance 2.02 QTY 6 250 1500 with dimensions of 60x60, including electrical wiring and connections. 3 Painting work 3.01 Painting the walls of the office room and the corridor (white colo). SQM 40 35 1400 4 Civil work Disassembling and relocating the aluminum external door measuring 90 4.01 cm by 200 cm, along with other civil work such as plastering, applying ls 1 1550 1550 silicone, and painting. Closing the upper openings of the main door, measuring 40 cm by 6 meters, with metal sheets, in addition to closing the transom opening 4.02 ls 1 2650 2650 with a fire-resistant material. Also, sealing the gaps resulting from installation with fire-resistant foam. 5 Plumbing work Removing the bathroom Toilet, installing a special conversion pice, 5.01 ls 1 350 350 reassembling it, and applying silicone. Total in Dirhams : Eleven Thousand Twenty Five Only 11,025.00 Special Notes 1 5 % vat will be additional 2 If there any additional in Qty or work consider as variations PAYMENT TERMS 1 40% Advance &60% on completion