You are on page 1of 2

QUOTATION

Ref # FS-REP-20201311
To, November 10, 2020

M.S. NOVA Building Apartments


Dubai, U.A.E.

Kind Attn: Mr. Mahmoud

SUBJECT: - Quotation for Dismantling & Rework Works.


PROJECT: - Nova Building Apartments Office 3601, 3602, 3603

Dear Sir,
We are grateful for the opportunity you given; our best price for the above-mentioned subject
work that matches to your requirements is as follows:

Commercial Terms: -

Sr.
No Description Unit Price AED
Demolition of the existing gypsum walls to make space as per new
1 layout. LSM 40,000
2 Dismantling Ceiling LSM 20,000
3 Dismantling Floor Tiles etc. LSM 20,000
4 Safely removing of the existing AC thermostats and light switches. LSM 5,000
5 Safely disconnecting existing socket in the walls. LSM 3,000
6 Carting away all the debris to municipal yard. LSM 30,000
7 Floor Grouting LSM 4,000
8 DP work, DP Fixing, Containment work, DP Dressing etc. LSM 1,000
9 Plumbing Work LSM 2,000
10 Chiller Piping, Valve Package etc. LSM 1,500
11 Firefighting Work LSM 1,500
12 FCU works LSM 3,000
TOTAL 131,000

Amount in Words: Dhs: One Hundred Thirty One Thousand Only.

Scope of Work:
a) Dismantle, removal and dispose offsite the Masonry Walls, Partition walls, including
doors, frames etc.,
b) Dismantle, removal and dispose offsite the existing floor
c) Dismantle removal and dispose offsite the existing Ceiling.
d) Disconnect, isolate, and dismantle removal and disposal off electrical installation
systems, including CCTV system and telephone data system.
e) Removal & Making good the site as per sample office 3701.
f) Block Work for 3 separate partitions, without plaster and paint.
g) Install existing HVAC equipment's using old/ existing equipment’s ,
supports, accessories, mountings, acoustic insulation and electrical connection from
isolator to the unit, complete to match with the existing HVAC equipment's, all as
per sample office no 34701.
h) Ductwork repairing only by using existing duct and insulation.
i) Firefighting pipelines repairing only by using existing pipes and sprinklers.
j) Draining work; repairing only by using existing material.

Note:
 Minimum 8 Hours work will be allowed by the client to work on the site.
 Separate lift excess will be provided by the client.

Excluded Items: - Electricity, Generators, Boom Loader, Cranes, Government approvals,


scaffolding, water etc.

Payment Terms: - 25% Advance, 75% on Progressive basis.


We look forward to work with you as your valued partner for your engineering services.
Please confirm by return LPO.

Best Regards,

Ulfat Rasool :050 2777599


For Bab Al Khazna Technical Services LLC

Page 2 of 2