No. DESCRIPTION QTY. UNIT AMOUNT


RATE

02. Fixing a window, door and a gypsum board partition at - - 30,000.00


the present office reception.

03. Installation of Glass Removed From The Present 72.00 290.00 20,880.00
Office Meeting Room At The New Office sq. ft.

(price may vary depending on the quantity of the


existing glass utilized) Glass to be measured and
Finalize the Cost

04. Supply and installation of 9mm double sided gypsum 720.00 405.00 250,000.00
drywall partition on GI frame structure for specified sq. ft.
areas, including application of putty, filler and class 01
emulsion paint finish.

05. Supply and installation of 6mm glass partition (non- 250.00 865.00 216.,250.00
tempered) with bronze aluminium shop front section sq. ft.
frame for specified areas.

06. DOORS
Supply and installation of plywood door with paint 01 Nos. 24,000.00 24,000.00
finish. Admin Room required , kitchen not required
Supply and installation of bronze aluminium framed
glass door with 6mm glass panel (non-tempered) 2 03 Nos. 35,500.00 106,500.00
Executive rooms and Boad Room- Pictures Required

07. Supply and Installation of Aluminium Pantry with - - 50,000.00


storage cupboards finished with white cladding sheets

Page 1 of
3
SRI LANKA'S FIRST EVER VIRTUAL CONSTRUCTION
CONSULTANCY EXPERIENCE
44/18, 19th Lane, Stace Road,
Colombo. 14

No. DESCRIPTION QTY. UNIT AMOUNT


RATE

08. Sink & pull out kitchen faucet – (Brand – Rocell or - - 45,000.00
similar - Installation Charges Included) – Price may
differ for a different brand and based on market
conditions

09. Electrical Work – 1 (Supply and installation of power


sockets with adequate wiring through PVC casings 61 points 3900.00 237,900.00
from existing DB board - All Inclusive)
(Brand – ACL/ Orange)

10. Electrical Work – 2 (Reinstatement of existing


distribution board, rewiring and dressing as per the - 14,500.00
wiring done at site, installation of new breakers where
necessary and amend as required)

11. Electrical Work – 3 (removing 4 light shades, fixing 2 - - 3000.00


available ceiling fans and 4 wall lamps)

TOTAL 742,630.00

Discount 50,000.00

GRAND TOTAL 692,630.00

Page 2 of
3
SRI LANKA'S FIRST EVER VIRTUAL CONSTRUCTION
CONSULTANCY EXPERIENCE
44/18, 19th Lane, Stace Road,
Colombo. 14

PAYMENT TERMS
30% upon mobilization for work commencement.
30% at the halfway stage of project completion.
10% upon project completion.
Balance 30% two weeks after completion of project.

Note: The above quote is on measure and pay basis. Water, Electricity and any storage
facilities to be provided by the client.

Project Consultant : Eng. Firnaz Najimudeen

Project Manager : Eng. Sahad Razik

If you have any further queries, please fell free to contact us.

Thank You.

Eng. Sahad Razik


MSc, BSc, A.M.ASCE, GMICE, GMIstructE
Virtual Construction Consultants

Page 3 of
3

You might also like