You are on page 1of 2

21/11/2023

TO: MR, GLASS WINGS

PORUR

CHENNAI

SITE; THARAMANI

QUOTATION FOR ALUMINIUM PARTITION WORK

S,NO DESCRIPTION AREA RATE AMOUNT


ALUMINIUM PARTITION WORK:

1, Providing & fixing of aluminium partition work consisting of frame work


made out of BLOCK color anodized JINDAL box sections of size 62 x38 2108sft 380/- 8,01,040.00
x2mm thick vertically and horizontally using for outer frame the frame (apprx)
work fabricated to through structure with screws and using 4mm
adhesive tape fixing for glass to frame and boss 389 weather proof
sealant and using between two glass joints , door section 85 X 45x2mm
for door vertical and horizontal and glass fixing holding with clips and
concealed door lock SS,handles , hinges ,gaskets necessary hardware’s
and this rate inclusive of existing partition removing and new partition
fixing labour charges and all complete.

Except glass and door closer

2 8th floor door alteration removing and Refixing 2 nos 2500/- 5,000.00
Total amount 8,06040.00

You might also like