HYDRAULIC TEST OF UNIT 2

Pressure
16
15
14

Check leaks
13
12
11
10
9
Check leaks

8
7 Safety valve test of Drum & main steam pipe
Heating for deaerator

6
Water supply to drum

5
4
(80-90 degC)

3
2
1
0
7 6 5 4 3 2 1 30 80 200 210 220 230 240 Time (min)
Time (hrs) < 0.3Mpa < 0.2Mpa < 0.3Mpa

Startup the auxiliary boiler to supply steam