1) The document outlines a schedule for inspection work on Turbine Unit #3 from March 20 to April 9, 2019 across multiple systems including the condenser, steam system, oil system, drain system, heater, deaerator, cooling tower, and boiler.
2) The schedule details the tasks to be completed each day organized by work area or system, required manpower, and shift assignments.
3) A total of 18 workers will be needed daily with teams assigned to specific areas like the turbine generator, cooling tower, and boiler systems to complete cleaning, inspection, maintenance and trial tasks over the 19 day period.
1) The document outlines a schedule for inspection work on Turbine Unit #3 from March 20 to April 9, 2019 across multiple systems including the condenser, steam system, oil system, drain system, heater, deaerator, cooling tower, and boiler.
2) The schedule details the tasks to be completed each day organized by work area or system, required manpower, and shift assignments.
3) A total of 18 workers will be needed daily with teams assigned to specific areas like the turbine generator, cooling tower, and boiler systems to complete cleaning, inspection, maintenance and trial tasks over the 19 day period.
1) The document outlines a schedule for inspection work on Turbine Unit #3 from March 20 to April 9, 2019 across multiple systems including the condenser, steam system, oil system, drain system, heater, deaerator, cooling tower, and boiler.
2) The schedule details the tasks to be completed each day organized by work area or system, required manpower, and shift assignments.
3) A total of 18 workers will be needed daily with teams assigned to specific areas like the turbine generator, cooling tower, and boiler systems to complete cleaning, inspection, maintenance and trial tasks over the 19 day period.
SCHEDULE PEKERJAAN TURBIN SERIOUS INSPEKSI UNIT #3
PERIODE : 20 Maret - 09 April 2019
Tanggal Man Power No. Unit Uraian Pekerjaan SHIFT TOTAL Day 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 Keterangan CFK TK COHA WTP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 1 Persiapan alat kerja dan APD 4 2 Cleaning Tubing condenser 8 8 8 8 8 8 8 8 8 8 3 Kuras dan cleaning bak water jet 0 4 4 Cleaning straine CWPP A dan B 2 5 Cleaning Tubing Pendingin Generator 2 4 CONDENSER 6 Cleaning Sisi dalam Condenser 4 4 A SYSTEM Cleaning Strainer Inlet Condensat pump A/B & Bongkar 7 4 pasang strainer 8 Greasing - Trial open/close MOV & Manual Valve 2 2 9 Cleaning sekitaran 2 2 2 Trial motor pompa condensate pump A,B, CWPP A,B, Water 10 18 jet pump A,B dan Gland Exhaust Fan A,B 1 Persiapan alat kerja dan APD 4 2 Kuras/drain oli tank ke temporary Oil Tank 0 STEAM 3 Cleaning sisi dalam oil tank 0 4 4 SYSTEM, OIL 4 Cleaning oil filter 4 C SYSTEM & 5 Cleaning tube oil cooler A dan B 0 4 DRAIN 6 Masukkan kembali Oil Lube ke Oil tank 4 SYSTEM Inspeksi MOV & Manual Valve / Greasing ( elev 0; 4,5 & Auxiliary Steam ) 7 2 2 dan trial open-closed MOV dan MV 8 Cleaning sekitaran 2 2 2 9 Trial Running HP, AC, DC, JOP & Extractor 1 Persiapan alat kerja dan APD 6 2 Cleaning Dearator atas bagian dalam dan cek nozzle 0 6 3 Cleaning Dearator bawah bagian dalam 6 6 6 HEATER DAN 4 Cleaning Strainer Inlet BFWP & Cooler A/B, tutup kembali 0 D DEAERATOR Inspeksi valve, greasing MOV & Manual Valve BFWP dan SYSTEM 6 Deaerator, Trial open/closed 6 7 Cleaning sekitaran 6 6 8 Trial running BFWP A dan B 1 Persiapan alat kerja dan APD 0 2 Drain Dan Cleaning Hidrocyclone 2 3 Cleaning Filler-filler & Nozzle Spray Cooling tower 4 6 6 6 6 6 Pengecekan fan dan pengecekan/penggantian nozzle spray 4 0 6 cooling tower COOLING 5 Cleaning Lumut di dinding,Tiang, filler dari sisi bawah 0 6 6 B TOWER Cleaning Lumpur di bak cooling tower, dan tambal SYSTEM 6 6 8 8 8 8 8 8 8 dinding,sekat,lantai yang bocor 7 Cleaning sekitaran 0 8 Pengisian Air Bak Cooling Tower 0 8 0 9 Greasing MOV & Manual Valve 0 10 Trial Running motor pompa & fan 0 TOTAL MANPOWER 12 2 0 4 PM 18 19 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 START UP
NOTE TEAM TURBINE GENERATOR & COOLING TOWER :
1 Team Merah sebanyak 4 (Empat) orang 2 Team Biru sebanyak 8 (Delapan) orang 3 Team Hijau sebanyak 6 (Enam) orang SCHEDULE PEKERJAAN BOILER SERIOUS INSPEKSI UNIT #3 PERIODE : 20 Maret s.d 09 April 2019 Tanggal Man Power No. Unit Uraian Pekerjaan SHIFT Total Day 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 Keterangan CFK TK COHA WTP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Persiapan alat kerja dan APD 1 8 Cleaning/Flushing Coalmill A,B & C 2 0 kuras coal bunker ABC 3 0 8 8 8 8 Cleaning Chute Coal Feeder ABC 4 4 A MILL SYSTEM Greasing - Trial Open/Cloe Valve MOV & Manual 5 8 8 6 Cleaning sekitaran 8 8 Trial Running Motor Coalmill ABC 7 17 Trial interlock sell work pump 8 0 Persiapan alat kerja dan APD 1 0 Drain dan geser bak bottom sludge 2 0 Pasang andang di dalam furnace sd sofa layer 3 9 9 9 9 9 9 Cleaning/inspeksi pipa Super Heater (platen, 4 Secondary,Primari) 9 9 5 Cleaning dinding ruang bakar 9 3 3 6 Cleaning upper Air Heater 6 GAS & FLUE B 7 Cleaning Upper Economizer front & Back 0 6 GAS SYSTEM 8 Cleaning Midle air heater Front & Back 9 9 Cleaning Lower Economizer Front & Back 0 10 Cleaning triple lower air heater Front & Back 9 11 Cleaning Lower Temperatur Economizer 9 9 12 Cleaning Ducting Flue Gas 9 13 Bongkar andang di dalam furnace 9 9 14 Cleaning sekitaran 0 1 Persiapan alat kerja dan APD Cleaning Housing & Impeller PAF A/B, SAF A/B, IDF A/B & 2 4 4 Sealing Air Fan C AIR SYSTEM 3 Greasing - Trial Open / Close Valve MOV & Valve manual 0 0 4 Cleaning sekitaran 0 0 5 Trial Running Motor & Fan 0 1 Persiapan alat kerja dan APD 0 WATER , 2 Flushing line cooler PAF, SAF,& IDF 4 4 VENTING, 3 Cleaning Steam Drum sisi dalam 3 3 3 3 D DRAIN & 4 Inspeksi kebocoran valve di drain main steam & Hanger STEAM 5 Greasing - Trial Open / Close Valve MOV & Valve manual 0 0 SYSTEM 6 Cleaning sekitaran 0 0 1 Persiapan alat kerja dan APD 0 2 Buka manhole 4 3 Cleaning Electroda ESP Chamber ABCD 0 8 8 5 4 Pengecekan Hammer vertical dan horizontal 5 5 Cleaning Chute & Hopper ABCD 0 5 E ESP System 6 Cleaning Blow Ash Tank & Conveying Fly Ash 5 7 Cleaning Compressor luar / dalam 0 8 Cleaning Air Dryer luar / dalam 0 9 Greasing - Trial Open / Close Valve MOV & Valve manual 0 0 10 Cleaning sekitaran 0 0 11 Trial Running Motor - Blower 0 TOTAL MAN POWER DAN TARGET HARI KERJA 9 2 6 0 PM 17 19 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 START UP 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 NOTE TEAM BOILER & ESP : CALCULASI MANPOWER 1 Team Merah sebanyak 8 (Delapan) orang BAGIAN JUMLAH ORANG Embalut, 13 Maret 2019 2 Team Biru sebanyak 9 (Sembilan) orang BOILER 9 TURBIN 8 ESP/CT 4 COHA 6 TEAM UNIT 3 WTP 4 TK 4 TOTAL 35