You are on page 1of 4

SUPPLIER : DAZZLE FOOTWEAR

Date Date Date Date

11/19/2022
CONCEPT - STUCKON LADIES ARTICLE NO. ARTICLE NO. ARTICLE NO. ARTICLE NO

SR. NO. PROCESS PROCESS PARAMETERS 571-8323


1. Material should be as per sample 1
2. There should be no defect on cut components . 1
1 Cutting of Upper parts / components.
3. Cut components should match with patterns. 1
4. Cutting Board Rotation policy in place (For Machine Cutting). 1
1. Components skiving (Width & guage) should be as per sample / SOP. 1
Components preperation - skiving , 2. Printing color , dimension , position & direction should match with sample and
2 printing , stamping , embossing / debossing patterns. 1
& marking.
3. Embossing / Debossing impression, dimension , position & direction should match
with sample and patterns. 1
1. Components folding should be even and accurate as per required margin , design
and sample. 1
3 Components Folding & attachment . 2. Components should be attached as per marking / refrence notches and margins
and there should be no components gap variations within the pairs.
1
1. Stiching thread color , Number & Ply should be as per sample . 1
2. Stitch length should be 8-10 stitches / inch or as per sample . 1
4 Components Stitching. 3. Edge stitching margin should be 1.5 -2mm or as per sample. 1
4. There should be no tension , loose stitch , tap / jump stitch & broken stitch visible
on components. 1
1. Is Roman Filler applied on raw edges
1
2. Is Filler Dried properly before applying Edge Color
1
5 Edge Colroing Process
3. Is Correct Roman edge Color Applied after Filler application ?
1
4. Is Edge color properly Dried before moving to stitching
1

Out sourced components & Accesseries All outsourced components / Accesseries (Sole , Insole , Socks , Buckle , lace , buttons
6 etc.) should be as per sample .
inspection.
1
1. Insole covering should be proper - Atleast 12-15 mm Margin req. . There should be
no wrinkles , crease and air gap visible,
7 Insole Covering & Marking 2. Insole marking should
be proper / as per pattern and clearly visible . 1
1. Punching position & punch dimension should be proper. Components should not
Insole Punching for strap / component damage or distorted after punching.
8
fixing 1
1. Upper should be accurately placed in bottom grooves . There should be no
9 Upper fitting on bottom parts unevenness and gap variation visible in pairs.
1
1. Components should be cleaned properly with MEK or other specified chemicals. 1
10 Upper / Sole Cleaning 2. After cleaning components should be processed for next operation within 10
minutes and should not be kept or stored in open for more than 10 minutes. 1
1. Brush & Bowl Rotation Policy is being followed 1
2. Cement / Adhesive should be properly mixed with Hardner (3-5% or as per
11 Upper /Sole Cementing requirement) and should be contamination free. 1

3. Cement should be applied evenly on required surface of components and there


should be no overcementing or bleeding visible on components. 1
Cement activation chamber specification should be followed strictly .

Temperature -
12 Cement Activation Upper 50~55*c
Time
Cement activation chamber - 2.5 to 3 Minutes
specification should be followed strictly .

Temperature -
13 Cement Activation Sole 50~55*c
Time - 2.5 to 3 Minutes
Upper and bottom should be attached correctly and there should be no rocking , mis
14 Upper & Sole Attaching allignment visible.
Sole pressing specification should be followed strictly .
Pressure - 30~35kg/cm2
15 Pressing of Sole

Time - 10~14 second.


Side Pressing All Sides should be pressed manually and there should be no bond gap visible after
16 pressing.
( Manual)

Product should be properly cleaned and there should be no threads , cement or any
17 Thread Burning , Cleaning & Finishing other kind of dirtyness visible on product.

18 Stuffing &Tagging Stuffing and tagging should be as per standards / sample.

1. There should be proper light on inspection table .

2. Sample should always avlaible with final inspector.


19 Final QC Inspection
3. Product inspection guidelines / instructions should be
displayed on inspection table.
1. All Inner boxes/outer Cartons should be stored/kept on Pallets
20 FG Storage of Inner Box 2. Outer Box Stacking should be as per below :
Mens : 6 Cartons, Womens : 6 Cartons, Kids : 7-8 Cartons
1) Process audit is done regularly
2) Process audit records are available
3) AQL Baord Display with Defined Inspection Table/Area
4) SOP's are displayed at Work Stations
5) Proper lighting at inspection area/table (650-800 lux)
21 Quality Activities/Best Practices
6) Gang way marking on work floor
7) Quality rating (declared by BIL) is Good / excellent.
8) Trained staff is available to carry out the QC/QA activities
9) FIFO Maintained at Raw Material Store
10) Light box installed at Final QC station.
Process Audit Score %
CONCEPT - STUCKON LADIES ARTICLE NO. ARTICLE NO. ARTICLE NO. ARTICLE NO

SR. NO. PROCESS PROCESS PARAMETERS 571-8323


Total Check Points Checked
Total OK Points
Total Not OK Points
Process Audit Score % ( OK)
BATA/EFZ/DAZZLE/PQCS/050922

…………………… …………………………… ……………………………


Production Head Sign Factory Owner Sign Bata QA Sign
Date Date

ARTICLE NO. ARTICLE NO.


ARTICLE NO. ARTICLE NO.

922

…………………………..
Bata QC

You might also like