Newsletter # 012 – 2020 Chief causes

~ 28 Jan 2020 ،‫ﻋﻧدﻣﺎ ﯾﺧطﺄ اﻟطﺑﯾب اﻟﺟراح ﻣرة‬


The causes of building collapse ‫ وﻟﻛن‬...‫ﻓﺧطﺄه ﻗد ﯾﻘﺗل ﻣرﯾﺿﮫ‬
Why buy sensitive items like can be classified under certain ‫ ﻓﺧطﺄه‬،‫ﻋﻧدﻣﺎ ﯾﺧطﺄ اﻟﻣﮭﻧدس ﻣرة‬
PC STRANDS heads as: ‫ﯾﻘﺗل اﻟﻣﺋﺎت‬.
from local Dubai Producer. - Bad Design
- Faulty Construction When a Surgeon commits a
- By Sanjay A, GSS – Technical Director
- Sub standard quality of Building mistake, the mistake may cost
Materials. one life.
Owing to growing concerns of - Foundation Failure
safety and to prevent mishaps But when an Engineer commits a
- Extraordinary Loads mistake, the mistake may take
owing to use of sub-standard - Unexpected Failure Modes 100s of lives.
quality goods specifically going - Corruption amongst sub-
into Construction – the Abu Dhabi contractors in the Middle Eastern
and Dubai Govt introduced Economies Hence the cheap sub standard
mandatory licensing for several - Corruption amongst Govt goods are often made in
sensitive building materials. Regulators – (especially rampant in production centers far off the
3rd world countries.) consumption centers…
- Combination of Causes
PC Strand is one such item and is
under mandatory control of DCL. As engineering excels, bad Out of this concern … many
designing, now-a-days is almost countries like USA and EU have
World over PC Strand is under now made mandatory to source
mandatory control of respective negligible.
sensitive items from local
Governments. producers. Most of important
The major cause of failure is
In a recent clarification provided contributed due to sub-standard Bridge and other important
by vide its email dated 15-AUG- quality of building materials and construction do not permit use of
2019 Dubai Central Laboratory corruption within the Sub sensitive classified construction
(DCL) clarified that despite a Contractor community – who materials such as the PC Strands
product being approved by DCL mainly end up using cheap to be imported from China or any
– in the rare event of any product Construction material. other country.
failure, it is the ultimately the
responsibility of both the Construction workmanship – is Even within Dubai Emirate, so
Consultant and Main contractors. also quite up to the mark as this far, the author has so far not seen
(refer Annexure 1) is often monitored by Regulatory the Road Transport Authority
Authorities and Consultants. (RTA) allowing use of cheaper PC
Strands coming from China or 3rd
Prompted by the above countries.
The use of cheap imported sub
clarification, I was asked to write
standard building materials is
this news letter. Within Abu Dhabi Emirate, the
often deceptive looking and looks
almost the same as high quality local Regulators have been quite
While pondering over, I decided goods normally produced by local encouragive of sourcing sensitive
to first compile some of the producers. building materials from Producers
serious failures that have been situated within 500 kms of Abu
witnessed over – a past few years Dhabi. (Refer SM-10 of Estidama
– world over… The chief reason, why a local Procedures). ESTIDAMA* is a
producer will desist from building design methodology for
producing sub standard goods is constructing and operating
the fear of law – and because in buildings and communities more
event of any mishap the local sustainable. The program is a key
producer is always easily available aspect of the "Abu Dhabi Vision
to the Law enforcing Authorities. 2030" drive to build the Abu
Dhabi Emirate according to
innovative green standards.

*"Estidama" is the Arabic word for


sustainability.

GulfSteelStrands.com Page # 1 of 8
Brief of the paper authored by Dr. Rank of Relative Index for Common Contribution Factors to Building Defects and Failures
N.Ahzhar, Dr. NA Karim, Dr. SH Hasan,
and Dr. J Eman presented at the 2nd Governing Factors Relative Index
International Building Conference 2011.
1 - Construction Materials 0.982
After a thorough painstaking 2 - Faulty During Construction 0.923
research of various Building 3 - Corruption 0.827
failures - concluded that the sub 4 - Lack of Correct Supervision 0.808
standard quality of construction
material and the corruption
appertained thereto – are the two
most common factors that lead “Most of the times the usage of Reducing the quality of materials
building defects and failures. materials is now-a-days and also the cost seem to have a
according to specification but it
hidden agenda among the sub-
Corruption: Corruption within the is the consequence from
contractors involved.
construction industry is a complex irresponsible parties who
and sensitive issue. It is generally intentionally reduce the quality
in order to reduce the cost. Since the effects of
assumed that it occurs but the sub-standard quality Building
form and scale of corruption is by materials are normally evident
The specifications- per se- do
its nature difficult to establish. after 15-20 years, the sub-
not take care of the
manufacturing processes but contractors being the last ones in
As noticed mostly, the chief the chain, are strongly induced to
merely describes the properties
source of corruption is by the for the materials. use cheap building materials
Sub-Contractors – not the produced mainly in China and
consultants or the main The properties of the material is elsewhere as they are quite away
contractors. The inducement to always found in accordance to from the Law once mishaps occur.
use cheaper deceptive appearing the specification but the
to be complying with the specification no way ensures its In most cases, the Owners end up
specifications is very strong long term performance under paying the full costs of so-called
amongst the Sub-Contractors. corrosive concrete in which PC best quality Building materials
Strands go into…. This and services but the most of the
anamoly allows clandenstine Sub-Contractors ended up using
For contribution factors to producers to sacrifice quality. deceptive cheap quality.
building defects and failures, the
highest rated factor is construction Hence all the more
materials with the highest value reason for PC Strands to
0.982. Construction material is an be sourced locally
important because the materials
being used in construction will ensuring Strands are Bibliography:
determine the behavior of the Acid Pickled and with
[1] Michael S.Poles. What is Construction
structure and resulted in any types low Chrome content. Defect? Retrieved at 15 Sept 2008, from
of failures or defects in the future. http://www.mmgroup.com.
In most cases, the effects of using The analogy is simple. Would [2] Robert T.Ratay (2005). Structural
low quality materials do not take you prefer to buy cheaper Condition Assessment, Survey and Assessment
place in a year or two, but Saline water coming from of Structural Conditions, (p.127- 495)

normally after many years. The China or expensive saline water


[3] Brown, Robert Wade. Practical Foundation
effects of sub standard quality from a local UAE producer? Engineering Handbook (2nd Edition).
materials slowly began to spread [4] The Chartered Institute of Building.
In case of any mishap, the
like a cancer in the concrete. Corruption in Construction Industry. Retrieved
local production facility is more at ^ Julai 2008 from http://www.ciob.org.uk
available. Because it is local,
the producers have no other
option but to be very rigid with
its quality and always be the
best”

GulfSteelStrands.com Page # 2 of 8
Failure Cause: What caused this huge watching the building fall in “slow
fall and that too by a not so big gas motion,” followed by an eerie
ignition? “deafening silence.”

The tower was constructed of precast Failure Cause: The Highland Towers
concrete. Failure of the single panel complex with three 12-story residential
caused one entire corner of the building buildings built at the base of steep hill
to collapse. The panel was able to be just outside of Malaysia's capital city,
blown out because there was Kuala Lumpur, had serious problems:
insufficient PC Reinforcement Steel
passing between the panels. This also - The retaining walls and
meant that the loads carried by the panel drainage system had been poorly
could not be redistributed to other designed and badly maintained.
adjacent panels, since there was no - The situation aggravated when
route for the forces to follow. Collapse another development company
was imminent. began construction on a ridge just
above Highland Towers. The land
Aftermath & Lessons Learnt: was stripped and exposed to
'Tie them well' is the lesson learnt. erosion, and some of the drainage
Reinforcements reinforce! Use them as pipes were blocked with tree
much as needed. branches.
- Ten days of non-stop rain
Ronan Point, London, England As a result of the collapse, building exerted enormous pressure on the
regulations were overhauled to prevent pipes causing the pipes to burst
In East London, on May 16, 1968, a disproportionate collapse. The under- along various points on the hill.
single match triggered the collapse of an standing of precast concrete detailing The water content of the soil rose to
entire corner of this massive 22- story was greatly advanced. dangerous levels.
building when 56-year-old Ivy Hodge, - Eventually, a landslip took
on the 18th floor, lit it to make herself a Based on this many similar buildings down a large retaining wall.
cup of tea. The spark from the match
was enough for a blast of gas explosion One hundred thousand square meters of
to tear apart the joints connecting the mud slid into Block One, carrying it
walls to the floor and she found herself forward and eventually snapping it.
on the ground in a not so pretty state.
Three people were pulled out alive on
The load-bearing walls had come apart, the first day.
leaving the four apartments above her
without any kind of structural support. In the aftermath, 48 bodies were
What next? Well, one by one, they came recovered.
tumbling down, tearing through the
floors below like falling dominoes. At Block two and block three were
the end an entire corner of the newly evacuated and stand empty to this day,
constructed building lay in shambles. like grim, overgrown tombstones.

When Ronan Point crashed, 260 people were altered or demolished. Lesson Learnt:
were in residence, of whom four were
killed in the disaster, while 17 were Highland Towers, Selangor, Malaysia Retaining walls take a lot of force and
injured. Ivy Hodge survived! need to be adequately designed.
December 11, 1993, the time 1:35 pm, a Retaining walls badly designed coupled
Public confidence in high-rise tower landslide with the force of 200 jumbo with eventual soil erosion were enough
buildings was badly shaken. jets slams into the foundations of Block to initiate the landslip with water only
One of the Highland Towers apartment compounding the mishap.
complex. Eyewitnesses describe

GulfSteelStrands.com Page # 3 of 8
Lesson Learnt:
Though design may be sound but so
should be the execution per design and Aftermath:
observing right construction which Police detained the owner of the Royal
practice, in this case has been found Plaza Hotel, the architect, and the
wanting. Inspection & testing coupled concerned Structural Govt Engineer.
with regular supervision are not mere
formalities but activities that can make Court ordered five to pay Bt152 million
or mar a project; or shall we say, make compensation for Hotel collapse. "This
or break a building! case should serve as a reminder to every
local administrative organization to
never approve an inappropriate
construction plan," the lawyer Whereas
Boonperng said "People's safety must
come first".
Skyline Plaza, Virginia, USA

On March 2, 1973, one of the Sky-line


Plaza complex's towering apartment
buildings collapsed, leaving where it
once stood, a huge cloud of dust and
debris.

Construction hadn't even been


completed in the complex in Bailey's
Cross- roads, Virginia at the time of the
disaster and the building was not due to
open until six months.
Royal Plaza Hotel, Nakhon
Failure Cause: Ratchasima, Thailand
There was no flaw in the design.
On August 13, 1993, at around 10:00 Lotus Riverside Compound,
Investigation showed that: am, the splendid six-story Royal Plaza Shanghai, China
Hotel in Nakhon Ratchasima, Thailand
- During construction the forms took all but less than 10 seconds to On June 27, 2009, Block 7, one of
supporting the concrete columns on the come crashing down, clocking just 1.6 eleven 13-story apartment buildings
22nd floor were prematurely removed. seconds per floor! making up the Lotus Riverside com-
The cement had not set fully by then. As pound in Shanghai, toppled over,
a result the columns couldn’t bear the 137 people were killed and 227more completely intact. The massive structure
weight of the 24th floor and failed. were injured in the collapse. fell and was lying flat with its
- The failure put an foundation pillars uprooted.
increased amount of pressure on the rest The tragedy also claimed the life of
of the columns on the 23rd floor until U.S. Air Force sergeant Ramon Canda, The high-rise was still under
the entire floor buckled and slammed who was in town installing telephone construction, but luckily, most workers
down on the floor below. lines at the Korat Royal Thai Air Force were able to evacuate when they felt it
- The building had not been Base. start to fall over.
engineered to withstand such a huge
increased load, and the tremendous Failure Cause: Failure Cause:
weight proved catastrophic. Each floor Allegations were that three stories had Block 7 fell just one day after 272 feet
gradually succumbed and plummeted been added to the building in 1990 of a nearby riverbank collapsed, thus
onto the story below in a devastating without proper structural review. Also, a proving the area to be unstable and that
ripple effect. huge amount of water was being stored the soil was loose. It was a case of the
on the roof of the hotel ahead of an development company working illegally
Fourteen construction workers died and expected water shortage. Added to for five years on site. This raised serious
34 were injured. incremental load over and above the concerns over building practices across
already extra load of three extra stories. China.

GulfSteelStrands.com Page # 4 of 8
Sampoong Department Store, Seoul,
South Korea

On June 29, 1995, in the space of 20


seconds, the Sampoong Department
Store in Seoul, South Korea fell to the
ground, killing 502 people and injuring
Hotel New World, Singapore Three High-Rise Office Buildings, 937 making it the largest peacetime
Rio, Brazil disaster in South Korean history
On March 15, 1986, all six stories of
Hotel New World collapsed in less than On January 26, 2012, a 20-story Failure Cause:
60 seconds. The building housed a building in Rio de Janeiro, Brazil The collapse was mainly due to use of
hotel, a bank and a nightclub, all of spontaneously collapsed. The gigantic sub-standard PC Strands and an overall
which disintegrated into piles of rock high-rise crashed into another ten- story structural failure.
and twisted metal, burying 50 people building and a smaller “three or four”
inside. story building, reducing all three Criminal negligence, disregard for
It was the worst disaster Singapore had structures to one huge pile of rubble. ethical engineering practices, and
experienced since World War II, and it The impact sent an enormous wave of shoddy construction led to this
shocked the nation. dust and detritus through the streets of structural failure.
Cinelandia Square, killing at least 17
Failure Cause: people. If the disaster had occurred just Many a lesson needs to be learnt from
After intensive research, investigators a few hours earlier, it would have this disaster:
discovered a terrible error in the original resulted in mass casualties. Fortunately,
design of the building. The structural the district, home to many office 1. Change of building use: The
engineer had completely left out the buildings and Brazil’s prized Municipal building, which was originally designed
building's “dead load,” in other words, Theater, was pretty desolate due to the to be an office building, was redesigned
the weight of the building itself, during late hour of the collapse. to be a department store. Change in use
the design process. As a result, it wasn't from ‘an office building’ to a
strong enough to hold itself up. Failure Cause: ‘department store’ decided when it was
Authorities attributed illegal halfway through its construction.
Tragically, Hotel New World was construction work to have weakened the
doomed from the beginning. 20-story building caused it to fragment, 2. Flouting Design Norms:
which in turn triggered a chain reaction,
Lesson Learnt: bringing down the two smaller • Despite the building not meant
This serves as a classic case of buildings. to support a fifth story, a fifth floor
unpardonable professional negligence. added
Legislation was introduced to enforce Aftermath: • The redesign involved cutting
maintenance and structural checks every This catastrophe has led Brazilian away a several key support columns
five years. authorities to call for reforms and to accommodate the escalators
stricter building and renovation installation. Redesign declared
regulations, especially ahead of the unsafe by contractors and were
2014 World Cup. terminated. Construction continued
with an in-house company.
• This extra level proved to be a
Super-heavy, heated floor (heated
concrete base with hot water pipes
going through it, as patrons sit on
the floor of traditional Korean

GulfSteelStrands.com Page # 5 of 8
restaurants). Air conditioning units Lesson Learnt
added to the roof quadrupled the Despite the fact that there were no
load the structure was designed to specific engineering flaws involved in
sustain. the design of the Twin Towers,
engineers religiously continue studying
3. Substandard Materials & the buildings to learn more about
Construction: redundant design and progressive
collapse; and most importantly, with the
• Substandard concrete used aim of formulating life-saving safety
and had only half the required 16 and evacuation procedures in the future.
steel PC reinforcing Strands/bars it
needed.
Parting Words of Wisdom:
• Also, the concrete columns Total progressive collapse, is an engineering
were thinner than necessary and phenomenon, first recognized in Ronan Point,
were reduced even more when fire where TPC triggered the partial collapse that
shields were installed around the brought an entire corner of the complex buckling
to the ground. Any buildings bearing severe,
escalators. concentrated blows that cripple significant
structural components (support beams, columns,
4. Disregard to Maintenance: Twin Towers, New York City, USA etc.) can crumble if the damages aren’t contained
and if components elsewhere blow out.
• In April 1995, extensive cracks Without a doubt, the most devastating
building collapse in history was that of According to Mechanics of Progressive Collapse,
were spotted, revealing high risk of when upper floors crash down on those below,
collapse. These fractures grew the World Trade Center, on September sandwiching layers of rubble and debris, the initial
exponentially, but management to 11, 2001. height h of a story reduces to l h, where one
expresses the compaction ratio. (In finite-strain
not lose the day’s revenue, refused theory, l is called “stretch.”). From here, “the load
to evacuate the building. The Twin Towers were masterfully
can increase without bounds.”
• Seven minutes before the engineered using lightweight steel, a
collapse, the building began to pop central core, and an egg-crate design TPC is a two-phase process: Crush-
creating a “redundant” structure. In down, whereby gravity and the immense
and crack, and employees sounded downward kinetic thrust of floors upon mashed
the alarm, but it was too late to other words, if one column or support
floors successively crushes everything below,
avert disaster, and 1,500 people were to fail, another would take its gives way to Crush- up, the free-falling top floors
were trapped inside. place. now piling on top of the wreckage.

The 9/11 destruction of the World


Aftermath & Lesson Learnt: • Each building could handle
Trade Centre (WTC) was a big surprise for the
This tragic event is a sad example of 5,000 tons of lateral wind-load. The structural engineering profession.
unethical decisions. Many faced weight of the jets was not enough to
overcome the strength of these No experienced structural engineer expected the
imprisonment for negligence and WTC towers to collapse. The fact that it did,
bribery after the incident perimeter columns.
collapse compelled in depth examination.
• Though 90,000 gallons of
The Sampoong collapse only made the burning jet fuel didn’t melt the steel The WTC is testimony to the danger of
columns holding up the building; it progressive collapse, as do,
public aware of a deadly problem that
plagued their structures. Out of the definitely weakened them.
The collapse of Ronan Point apart- ments in the
investigation, 14% of South Korean • With 50 percent of their United Kingdom in The New World Hotel in
sky- scrapers were unsafe, 84% needed previous strength the columns still could Singapore;
repair, and only 2% met codes and hold up the building.
- The 2000 Commonwealth Ave.
government standards. • The uneven temperature of the
tower in Boston in 1971, triggered by punching of
fire, distorted the steel on one side of insufficiently hardened slab;
The disaster later put a question-mark sky- scraper causing a stress that proved - among the ones discussed here and
too much, leading to eventual buck- ling many others.
regarding safety standards on other
engineering projects being undertaken of the floors. And then began a domino
Progressive collapse is possible even for the
as South Korea in 1980s & 90s was collapse, pancaking down one on top of massive load-bearing concrete cores of the tallest
experiencing an economic boom. the other. recent skyscrapers, though it would be much
• Each tower weighing 500,000 harder to initiate. However, once a local damage
causes a sufficient downward displacement of the
A detailed review of South Korean tons, in just ten seconds, had the
superior part of structure, collapse is unstoppable.
safety regulations resulted. buildings collapsing, to hit the ground at
124 mph. Total progressive collapse is a potential “failure
mode” of extreme concern!

GulfSteelStrands.com Page # 6 of 8
ANNEXURE A

DCL CLARIFICATION

GulfSteelStrands.com Page # 7 of 8