You are on page 1of 2

AESFill AF1 Quick Setup in 5 Easy Steps

3)Plug the footswitch cable into the 5 Pin Port.


1)Attach the nozzle to the nozzle bar.
Plug the machine into a source of 110 V (or 220V if your
NOTE: All references to black and blue air lines must be machine is of this voltage, check rating plate to confirm).
reversed if using O.B.S.O type nozzles.
Power up the machine via the on/off switch.
Attach the black air hose from the black tagged fitting on the
4)The screen should power up, display the program version for
rear of the machine to the top of the nozzle.
a few seconds and then go to the RUN screen.
Attach the blue air hose from the white tagged fitting on the
NOTE: The RPM is pre-set at the factory to 75%, and the fill
rear of the machine to the side of the nozzle.
volume is pre-set to 1,000.
Attach a source of dry air (at least 60 psi) to the inlet of the
To change any parameters, such as fill quantity, motor speed,
filter-regulator assembly. Adjust the regulator to deliver 60 -
nozzle response time and the auto-re-cycling function, please
80 psi. The nozzle plunger should now be in the closed
refer to the full manual.
(down) position, shutting the nozzle.
To prime the system, see the Quick and Easy Priming
Adjustable Exhaust directions below.
Muffler Power Cord Plug
5)Place a suitably sized container under the nozzle. Press and
On/Off Switch
Black & Blue Nozzle release the footswitch to begin a single fill. At any time during
air connections the fill, pressing the footswitch again halts the filling.
19 Pin
Rating Plate Communication
Cable Port

Air Regulator

AESPump 5 Pin
Communication
Cable Port

2)Attach one end of the larger diameter hose to the inlet on the
pump using the 1 ½” tri-clover clamps, seals and fittings. You
can determine the inlet and outlet of the
pump by looking at the arrow on the
bottom of the pump.
Place the other end of this hose into a
suitable supply container.
Quick and Easy Priming
Attach one end of the small diameter hose to the outlet of 1) Take both air hoses off the nozzle, and attach the black air
the pump using the 1 ½” tri-clover clamps, seals and fittings. hose to the side of the nozzle in order to raise the internal
The other end of this hose attaches to the inlet of the nozzle plunger and open the tip.
using the ¾” (or 1 ½”) tri-clover clamps, seals and fittings
2) Attach a suitable hose from the AESPRIME unit to the
bottom opening of the nozzle spout.
3) Pump the AESPRIME unit several times until the liquid is
seen to rise up through the inlet hose, through the pump
and is seen in the outlet hose.
4) Remove the black pressure air hose from the side of the
nozzle and attach it back to the top.
Re-attach the blue air hose to the side of the nozzle.
5) Detach the AESPRIME unit.

Aesus Packaging Systems Inc.


188 Oneida Drive Pointe-Claire Quebec Canada H9R 1A8
(514) 694-3439 Fax (514) 694-4107 www.aesus.com contactus@aesus.com
AESFill AF1 Control Panel, Pump Assembly & Networking Information
Control Panel
3) Place this bushing holder into the pump vault making sure that the
There are five buttons and a display screen on this panel. Normally,
longer bushing inserts into the drive shaft hole recess at the bottom
AESFill AF1s are started using a footswitch or a N.O. dry contact
of the pump vault. Both bushings should be flush with the top of
When working with a setup comprising of multiple AF1units, the the bushing holder.
individual machines can be networked together so that they are all 4) Place the drive shaft (longer shaft) through the long bushing and the
controlled by the same foot switch or start signal. shaft seal. The hexagonal section of the shaft should come up
The AESFill AF1 control panel shown below manages all setup against the end of the bushing insert.
parameters. 5) Similarly, place the Idler shaft into the other hole.
6) Slide both gears onto the shafts making sure that they locate on the
hexagonal sections of the
shafts.
7) Place the gear chamber into
the pump vault on top of the
bushing holder.
8) If removed, insert the two
other short bushings into the
second bushing holder. Now
slide the second bushing holder over the two shafts. When this
piece is in place it should be just above the top flange of the pump
Button Description body.
9) Place the end cap sealing ring on the top flange of the pump vault.
Menu Key: Allows access to the parameters. See the manual
Place the end cap on top of the seal. Fasten the 3" (7.5cm) sanitary
for more information about the different options.
clamp and tighten approximately two turns after contact to seal the
The main first level parameters that are mostly used are the
end cap to the pump vault.
Fill Setting, Fill Speed and Repeat Fill.
Special Settings will get you into the other available options. 10) In order to attach the pump to the docking plate on the filler you
will need to use the smaller 2" (5cm) sanitary clamp. There is a
Left & Right Arrow selects the next parameter for circular groove in the bottom of the AESPump and a matching ridge
editing. on the top of the docking plate on the AESFill AF1. Place the
Up & Down Arrow: Increases & decreases the AESPump on top of the docking plate and use the sanitary clamp to
selected setting. fasten the two pieces together. No sealing ring is required for this
connection. You can rotate the pump to any orientation that you
3 Pump Body need.
AESPump Assembly
Networking AF1 Machines
4 Tri-Clover Sanitary
Clamps AF1 machines can be networked up to 4 AF1s together. In order to
2 O-Ring network AF1s you require to have a 5 Pin to 19 Pin cable. This
1 Pump Face
cable can be purchased separately.
Plate
On the machine with the empty 5 pin port, connect the footswitch
pedal. The machine that has the empty 19 pin port (or the 19 pin
port used for the automation kit), this machine is considered the
Master AF1. All other AF1s should have the Slave Option turned
ON.
5 Gears

6
Drive 11 Bushings (3 short / 1 long)
Shaft

8 10
7 Idler Shaft U-Cup Drive Bushing Holders
9 Gear Chamber
Shaft Seal
1) If removed, replace the U-cup drive shaft seal by inserting the small
diameter edge of the seal back into the drive shaft hole recess.
2) If removed, replace the longer bushing and one of the smaller
bushings into one of the bushing holders.

Aesus Packaging Systems Inc.


188 Oneida Drive Pointe-Claire Quebec Canada H9R 1A8
(514) 694-3439 Fax (514) 694-4107 www.aesus.com contactus@aesus.com

You might also like