APPROVAL,DERWING & SITE

S.NO CLEARANCE
1 APPROVAL SUBMISSION
2 APPROVAL SUBMISSION
3 SITE CLEARANCE

4 SITE CLEARANCE
5 APPROVAL SUBMISSION
6 APPROVAL SUBMISSION
7 APPROVAL SUBMISSION
8 APPROVAL SUBMISSION
9 APPROVAL SUBMISSION
10 SITE CLEARANCE

11 APPROVAL SUBMISSION

12 APPROVAL SUBMISSION

13 APPROVAL SUBMISSION

14 APPROVAL SUBMISSION

15 APPROVAL SUBMISSION
16 APPROVAL SUBMISSION
17 PAYMENT
18 APPROVAL SUBMISSION
19 APPROVAL SUBMISSION
20 APPROVAL SUBMISSION
21 APPROVAL SUBMISSION
22 APPROVAL SUBMISSION

23 APPROVAL SUBMISSION

24 SITE CLEARANCE
25 APPROVAL SUBMISSION

26 APPROVAL SUBMISSION

27 SITE CLEARANCE

28 APPROVAL SUBMISSION

29 APPROVAL SUBMISSION

30 APPROVAL SUBMISSION

31 APPROVAL SUBMISSION

32 APPROVAL SUBMISSION

33 APPROVAL SUBMISSION

34 APPROVAL SUBMISSION

35 APPROVAL SUBMISSION

36 APPROVAL SUBMISSION

37 APPROVAL SUBMISSION

38 APPROVAL SUBMISSION

39 APPROVAL SUBMISSION
40 APPROVAL SUBMISSION

41 APPROVAL SUBMISSION

42 APPROVAL SUBMISSION

43 APPROVAL SUBMISSION

44 APPROVAL SUBMISSION

45 APPROVAL SUBMISSION

46 APPROVAL SUBMISSION

47 APPROVAL SUBMISSION

48 APPROVAL SUBMISSION

49 APPROVAL SUBMISSION

50 APPROVAL SUBMISSION

51 SITE CLEARANCE
52 APPROVAL SUBMISSION
53 APPROVAL SUBMISSION

54 PAYMENT

55 APPROVAL SUBMISSION
56 APPROVAL SUBMISSION

57 PAYMENT

58 APPROVAL SUBMISSION

59 PAYMENT

60 APPROVAL SUBMISSION

61 APPROVAL SUBMISSION

62 APPROVAL SUBMISSION

63 APPROVAL SUBMISSION

64 APPROVAL SUBMISSION

65 PAYMENT

66 APPROVAL SUBMISSION

67 APPROVAL SUBMISSION

68 APPROVAL SUBMISSION

69 PAYMENT

70 PAYMENT

71 APPROVAL SUBMISSION
72 APPROVAL SUBMISSION

73 APPROVAL SUBMISSION

74 APPROVAL SUBMISSION

75 PAYMENT

76 APPROVAL SUBMISSION

77 APPROVAL SUBMISSION

78 SITE CLEARANCE

79 APPROVAL SUBMISSION

80 PAYMENT

81 APPROVAL SUBMISSION

82 PAYMENT

83 PAYMENT

84 Renewal & Reduction

85 APPROVAL SUBMISSION

86 APPROVAL SUBMISSION

87 INSPECTION CALL LETTER


88 INSPECTION CALL LETTER

89 PAYMENT

90 APPROVAL SUBMISSION

91 APPROVAL SUBMISSION

92 APPROVAL SUBMISSION

93 APPROVAL SUBMISSION

94 APPROVAL SUBMISSION

95 INSPECTION CALL LETTER

96 APPROVAL SUBMISSION

97 PAYMENT

98 APPROVAL SUBMISSION

99 INSPECTION CALL LETTER

100 ACTION PLAN

101 INSPECTION CALL LETTER

102 INSPECTION CALL LETTER

103 PAYMENT

104 SITE CLEARANCE


105 APPROVAL SUBMISSION

106 APPROVAL SUBMISSION

107 APPROVAL SUBMISSION

108 APPROVAL SUBMISSION

109 APPROVAL SUBMISSION

110 APPROVAL SUBMISSION

111 INSPECTION CALL LETTER

112 APPROVAL SUBMISSION

113 APPROVAL SUBMISSION

114 PAYMENT

115 APPROVAL SUBMISSION

116 PAYMENT

117 PAYMENT

118 APPROVAL SUBMISSION

119 APPROVAL SUBMISSION

120 APPROVAL SUBMISSION


121 PAYMENT

122 PAYMENT

123 APPROVAL SUBMISSION

124 PAYMENT

125 PAYMENT

126 APPROVAL SUBMISSION

127 APPROVAL SUBMISSION

128 APPROVAL SUBMISSION

129 SITE CLEARANCE

130 APPROVAL SUBMISSION

131 PAYMENT

132 APPROVAL SUBMISSION

133 APPROVAL SUBMISSION

134 APPROVAL SUBMISSION

135 APPROVAL SUBMISSION

136 Renewal & Reduction

137 APPROVAL SUBMISSION

138 SITE CLEARANCE


139 SITE CLEARANCE

140 APPROVAL SUBMISSION


DESCRIPTION
Submission of performance Bank Guarantees
Submission of basic Engineering Package ,soil Test report & Survay Drawings
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Temporary EB Connection -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -37 MLD -Site Handover
Civil Material testing M30 Design Mix
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SRLY/Justification for BEP observation
Submission of strucural design and Drawing and general arrangement drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SRLY/Justification for BEP observation
Submission of Labour license application
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Site Hand over issuse -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 reply Justification For BEP Observation -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 -Submission of Revised strucural design and
Drawings and -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 -Submission of Revised GA and Structural drawing -
Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 -Submission of Structural Design and Drawings and
General Arrangement drawing -Reg
Submission of Rewised GA and structural Drawing
Submission of Billing Breakup approval
Submission of RA Bill 01
Submission of Rewised BEP Rvc -C and comment Reply sheet for 37 mld STP based
onCSMC observation
Submission of Structural Design & drawing and general arrengment drawing -Reg
Submission of general arrengment drawing of thickner Feed Sump -Reg
Submission of Revised Billing Breakup approval
Submission of Decanter data sheet ,General Arrangement Drawing & Quality Assurance
Plan
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 UV disinfection for STP
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Site status Letter -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Diffuser data sheet ,General
Arrangement drawing & QAP -Reg

Submission of SBR Structural Design and drawings and General Arrangement Drawing

Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Site Physical land not yet hnadover -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Centrifuge & SBR data sheet ,General
Arrangement drawing & QAP -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Revised structural design and
drawings of SBR Basin -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Proposing M/S Dr.Amin Controllers Pvt Ltd As a
Third Party Agency for Inspection of electro mechanical Equipments -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of PLC panel General Arrengement &
PLC System Architecture Diagram -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Electro Mechanical Equipment Data
Sheet ,GA Drawing And QAP -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Civil Material Testing -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Inspection call for the Electro
Mechanical equipments Such as Detritor mechanism And Agitator -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Electro Mechanical equipments
Data sheet ,GA drawing and QAP -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Electro Mechanical equipments
Data sheet ,GA drawing and QAP -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3-Submission of Gravity sludge Thickner Structural
Design & drawing and general arrengment drawing -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3-Submission of 600KVA DG ,MCC Panel& LPBS
technical Details ,GA drawing Single line Diagram &QAP -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package Submission of Revised Billing Breakup approval
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package Submission of inspection report Detritor and Dispatch
the material to site
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package Submission of call for the electro Mechanical
equipments such as air blower with Motor
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package Submission of electrical data sheets and Revised GA
drawing of fine screen

Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Proposing M/S SGS india Pvt Ltd & TUV India Pvt
Ltd As a Third Party Agency for Inspection of electro mechanical Equipments -Reg

Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Revised GA drawing Air blower -
Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 inspection of the electro Mechanical Equipments
Mechanical and Manual screens -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 inspection of the electro Mechanical Equipments
Mechanical and Manual screens -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Exacvated Soil Dump -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Millestone -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of TFS revised GA and structure
drawings -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection of the electro Mechanical equipments
Screw Pump -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Cutting & Removel of Trees at site -Reg
trichy Corporation Under Package -3 Submission of Revised RA Bill -02 for Civil work and
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection call for the. Electro mechanical
Equipments Mechanical and Manual screens -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Payment Invoice -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Electro mechanical Equipments Detrtior & Agitator
Stock-Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection call for the. Electro mechanical
Equipments Thickener Mechanism -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Payment recepit and withheld amount -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Revised Structural Design Drawings and
Arrangement Drawing For Air Blower Building & Thickner Feed Pump -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA Bill 02 Payment Recipet -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Project completion schedule for Revision of Project
Mile Stone -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Electro Mechanical equipment stock -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of submersible pump data
sheet ,General arrangement Drawing & QAP -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Power cable Schedule ,control cable
schedule & Sizing Calculations -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of RA Bill 04 for Civil works And
Mechanical Supply -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of RA Bill 04 for Payment Recipet Letter
-Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission for Inspection Call Letter for the
Submergible Pumps -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 PLC panel system Stock -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission for Inspection Call Letter for the
Submergible Pumps -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Payment Recipet -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Payment Recipet -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Payment Recipet -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission for Inspection Call Letter for Decanter
centrifuge -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Treated Sweage Water Disposal Works -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Final Inspection Report -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of RA bill -05 TEX invoice Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Treated water Transfer Pump &
dosing Pump Data sheet ,General Arrangement Drawing & QAP
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SBR Decanter ,Centrifuge and Submergible Pump
stock -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 STP Plant Area -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Transformer 1250KVA Data
sheet ,General Arrangement Drawing & QAP
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA Bill 06 -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Request for Approval submission ,Revised Billing
Breakup Sch-04 For Installation and Other services
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA Bill 06 Tax Invoice -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA Bill 05 Tax Invoice -Reg

Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Request for BG Renewal & reduction Letter -Reg

Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Revised billing breakeup Sch . No -
04
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Revised billing breakeup Sch . No -
04
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Request for inspection Call for Treated water
Transfer Pump-Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Request for inspection Call for Dosing Pump-Reg

Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA bill -05 Payment Recepit
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection Call for Electro Mechanical Equipment
Diffuser With Internal Pipeing for SBR system
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection call for 2*600 KVA DG set -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection call letter for the Electrical Equipments -
MCC Panel & LPBS (LT panel ) -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Request for Deputation of CMSC engineer to
Witness the Cube Test at M/s Dalmia RMC Plant -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 BG Renewal & Reduction Letter
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Final Inspection report
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Revised Billing breakup Sch 04 for
Installation and other Services -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA bill -06 Submission
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of project completion schedule for
revision of project Mile stone
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection Call Letter for the Electrical Equipments
Transformer 1250 KVA Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Action Plan Report
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Chlorine Tonner Data Sheet ,General
Arrangement Drawing &QAP
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection Call Letter for the Chlorine Tonner
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA bill -06 Invoice
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Site Clearence is required to start the civil work for
chlorination building ,chlorine contact Tank and Treated water Sump at site
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3Submission Revised Numeration Drawing for PTU
unit
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION RENEWED performance Bank
Guarantee
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3Submission of Compound Wall Drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of DI pipe QAP approval -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Proposed to Execute the SS -304 Hand Rail Pipe
Instead to GI pipe -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Ms pipe and Fittings QAP approval -
Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection Call letter for the Di pipe
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Gas chlorination sysytem Data Sheet
With Drawing and QAP Approval
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Sluice Gate valve Data Sheet With
GA Drawing and QAP Approval
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA bill -06 Recipet
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Relase of withheld Amount
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA bill -07 Bill submission
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA bill -07 Invoice
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Di Pipe fitting ,Flange QAP for
Approval

Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Structural drawings for DG padestal

Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION RENEWED performance Bank
Guarantee
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of RA bill-07 for mandatory and spare
parts supply schedule -2 installation & other service schedule -2 installation & other
services schedule -04 payment recipet
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of price Adjustment Bill -01 to 07
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of CCT tank drawing Change
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of RA Bill -08 Payment receipt
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of RA Bill -08 Payment Tax Invoice
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Transformer GA drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of DG shed structural drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of TNEB for CIEG approval
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of site Clearance
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of outdoor 11KV HT DB structure Yard
with 11 KV HT VCB
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of RA Bill -08
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Street Light and outer Building
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Street Light Pole Foundation
Drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Layout and other details of
pathway Drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Layout and other details of Road
Drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Renewed performance
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of rain water hervesting drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Site Clearance & Retention Amount
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Site Clearance & Retention Amount
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Scope Of Instrumention
DATE OF SUBMISSION
LETTER NO LETTER
EPEPL /TCC-37 MLD STP /096/2018-19 1/28/2019
EPEPL/TCC -37 MLD STP /001/2018-19 4/5/2019
EPEPL/TCC -37 MLD STP /004/2019-20 4/10/2019

EPEPL/TCC -37 MLD STP /025/2019-20 5/17/2019


EPEPL/TCC -37 MLD STP /004/2019-20 6/3/2019
EPEPL/TCC -37 MLD STP /154/2019-20 7/9/2019
EPEPL/TCC -37 MLD STP /181/2019-20 7/31/2019
EPEPL/TCC -37 MLD STP /179/2019-20 8/5/2019
Epepl /Tcc -37 Mld STP /191/2019-20 8/6/2019
EPEPL/TCC -37 MLD STP /068/2019-20 8/27/2019

EPEPL/TCC -37 MLD STP /235/2019-20 9/4/2019

EPEPL/TCC -37 MLD STP /236/2019-20 9/4/2019

EPEPL/TCC -37 MLD STP /249/2019-20 9/16/2019

EPEPL/TCC -37 MLD STP /250/2019-20 9/16/2019

EPEPL/TCC -37 MLD STP /267/2019-20 10/3/2019


EPEPL/TCC -37 MLD STP /278/2019-20 10/18/2019
EPEPL/TCC -37 MLD STP /279/2019-20 10/18/2019
EPEPL/TCC -37 MLD STP /290/2019-20 10/29/2019
EPEPL/TCC -37 MLD STP /291/2019-20 10/30/2019
EPEPL/TCC -37 MLD STP /302/2019-20 11/5/2019
EPEPL/TCC -37 MLD STP /304/2019-20 11/6/2019
EPEPL/TCC -37 MLD STP /317/2019-20 11/13/2019

EPEPL/TCC -37 MLD STP /305/2019-20 11/15/2019

EPEPL/TCC -37 MLD STP /306/2019-20 11/15/2019


EPEPL/TCC -37 MLD STP /320/2019-20 11/16/2019

EPEPL/TCC -37 MLD STP /326/2019-20 11/23/2019

EPEPL/TCC -37 MLD STP /306/2019-20 12/20/2019

EPEPL/TCC -37 MLD STP /308/2020-21 1/2/2020

EPEPL/TCC -37 MLD STP /308/2020-21 1/4/2020

EPEPL/TCC -37 MLD STP /322/2020-21 1/7/2020

EPEPL/TCC -37 MLD STP /323/2020-21 1/7/2020

EPEPL/TCC -37 MLD STP /324/2020-21 1/27/2020

EPEPL/TCC -37 MLD STP /325/2020-21 1/31/2020

EPEPL/TCC -37 MLD STP /326/2020-21 2/4/2020

EPEPL/TCC -37 MLD STP /327/2020-21 2/8/2020

EPEPL/TCC -37 MLD STP /327/2020-21 2/8/2020

EPEPL/TCC -37 MLD STP /328/2020-21 2/8/2020

EPEPL/TCC -37 MLD STP /381/2020-21 2/17/2020

EPEPL/TCC -37 MLD STP /331/2020-21 2/27/2020


EPEPL/TCC -37 MLD STP /332/2020-21 3/10/2020

EPEPL/TCC -37 MLD STP /326 (R)/2020-21 3/10/2020

EPEPL/TCC -37 MLD STP /333/2020-21 3/10/2020

EPEPL/TCC -37 MLD STP /335/2020-21 3/10/2020

EPEPL/TCC -37 MLD STP /336/2020-21 3/11/2020

EPEPL/TCC -37 MLD STP /337/2020-21 3/20/2020

EPEPL/TCC -37 MLD STP /337/2020-21 3/20/2020

EPEPL/TCC -37 MLD STP /339/2020-21 4/18/2020

EPEPL/TCC -37 MLD STP /340/2020-21 5/11/2020

EPEPL/TCC -37 MLD STP /341/2020-21 5/22/2020

EPEPL/TCC -37 MLD STP /342/2020-21 5/30/2020

EPEPL/TCC -37 MLD STP /340/2020-21 6/6/2020


EPEPL/TCC -37 MLD STP /345/2020-21 6/19/2020
EPEPL/TCC -37 MLD STP /346/2020-21 6/21/2020

EPEPL/TCC -37 MLD STP /347/2020-21 6/22/2020

EPEPL/TCC -37 MLD STP /348/2020-21 7/2/2020


EPEPL/TCC -37 MLD STP /349/2020-21 7/10/2020

EPEPL/TCC -37 MLD STP /350/2020-21 7/30/2020

EPEPL/TCC -37 MLD STP /351/2020-21 7/30/2020

EPEPL/TCC -37 MLD STP /355/2020-21 8/20/2020

EPEPL/TCC -37 MLD STP /356/2020-21 8/25/2020

EPEPL/TCC -37 MLD STP /357/2020-21 9/15/2020

EPEPL/TCC -37 MLD STP /358/2020-21 10/20/2020

EPEPL/TCC -37 MLD STP /359/2020-21 10/20/2020

EPEPL/TCC -37 MLD STP /360/2020-21 10/21/2020

EPEPL/TCC -37 MLD STP /363/2020-21 10/21/2020

EPEPL/TCC -37 MLD STP /361/2020-21 10/26/2020

EPEPL/TCC -37 MLD STP /362/2020-21 10/28/2020

EPEPL/TCC -37 MLD STP /364/2020-21 11/12/2020

EPEPL/TCC -37 MLD STP /365/2020-21 11/18/2020

EPEPL/TCC -37 MLD STP /366/2020-21 11/18/2020

EPEPL/TCC -37 MLD STP /367/2020-21 11/24/2020


EPEPL/TCC -37 MLD STP /368/2020-21 11/27/2020

EPEPL/TCC -37 MLD STP /369/2020-21 11/27/2020

EPEPL/TCC -37 MLD STP /370/2020-21 12/3/2020

EPEPL/TCC -37 MLD STP /373/2020-21 12/28/2020

EPEPL/TCC -37 MLD STP /372/2020-21 1/4/2021

EPEPL/TCC -37 MLD STP /374/2020-21 1/20/2021

EPEPL/TCC -37 MLD STP /375/2020-21 2/2/2021

EPEPL/TCC -37 MLD STP /376/2020-21 2/3/2021

EPEPL/TCC -37 MLD STP /377/2020-21 2/4/2021

EPEPL/TCC -37 MLD STP /378/2020-21 2/4/2021

EPEPL/TCC -37 MLD STP /386/2020-21 2/4/2021

EPEPL/TCC -37 MLD STP /387/2020-21 2/4/2021

EPEPL/TCC -37 MLD STP /393/2020-21 2/5/2021

EPEPL/TCC -37 MLD STP /378/2021-22 2/5/2021

EPEPL/TCC -37 MLD STP /378/2021-22 2/5/2021

EPEPL/TCC -37 MLD STP /379/2020-21 2/10/2021


EPEPL/TCC -37 MLD STP /380/2020-21 2/12/2021

EPEPL/TCC -37 MLD STP /387-A/2021-22 2/25/2021

EPEPL/TCC -37 MLD STP /387/2021-22 3/1/2021

EPEPL/TCC -37 MLD STP /389/2020-21 3/13/2021

EPEPL/TCC -37 MLD STP /391/2020-21 3/18/2021

EPEPL/TCC -37 MLD STP /391/2020-21 3/18/2021

EPEPL/TCC -37 MLD STP /393/2021-22 4/5/2021

EPEPL/TCC -37 MLD STP /394-B/2021-22 4/5/2021

EPEPL/TCC -37 MLD STP /378/2020-21 4/13/2021

EPEPL/TCC -37 MLD STP /394/2021-22 5/10/2021

EPEPL/TCC -37 MLD STP /395/2020-21 6/24/2021

EPEPL/TCC -37 MLD STP /396/2021-22 6/25/2021

EPEPL/TCC -37 MLD STP /01/2021-22 7/8/2021

EPEPL/TCC -37 MLD STP /398/2021-22 7/16/2021

EPEPL/TCC -37 MLD STP /399/2021-22 7/28/2021

EPEPL/TCC -37 MLD STP /394-A/2020-21 8/2/2021

EPEPL/TCC -37 MLD STP /401/2020-22 8/5/2021


EPEPL/TCC -37 MLD STP /400/2021-22 8/5/2021

EPEPL/TCC -37 MLD STP /402/2020-21 8/10/2021

EPEPL/TCC -37 MLD STP /404-A/2021-22 9/15/2021

EPEPL/TCC -37 MLD STP /407/2021-22 9/29/2021

EPEPL/TCC -37 MLD STP /406/2021-22 9/29/2021

EPEPL/TCC -37 MLD STP /408/2021-22 10/5/2021

EPEPL/TCC -37 MLD STP /412/2021-22 10/26/2021

EPEPL/TCC -37 MLD STP /414/2021-22 11/16/2021

EPEPL/TCC -37 MLD STP /413/2021-22 11/16/2021

EPEPL/TCC -37 MLD STP /415-A/2020-21 11/30/2021

EPEPL/TCC -37 MLD STP /415/2020-21 11/30/2021

EPEPL/TCC -37 MLD STP /417/2020-21 12/17/2021

EPEPL/TCC -37 MLD STP /417-A/2020-21 12/25/2021

EPEPL/TCC -37 MLD STP /419/2020-21 12/28/2021

EPEPL/TCC -37 MLD STP /420/2021-22 1/18/2022

EPEPL/TCC -37 MLD STP /421/2021-22 1/25/2022


EPEPL/TCC -37 MLD STP /421-A/2021-22 1/25/2022

EPEPL/TCC -37 MLD STP /424/2021-22 3/8/2022

EPEPL/TCC -37 MLD STP /424-A/2021-22 3/8/2022

EPEPL/TCC -37 MLD STP /436/2021-22 3/8/2022

EPEPL/TCC -37 MLD STP /434/2021-22 3/8/2022

EPEPL/TCC -37 MLD STP /425 -A/2021-22 3/9/2022

EPEPL/TCC -37 MLD STP /426-A/2021-22 4/4/2022

EPEPL/TCC -37 MLD STP /425 -C/2021-22 4/7/2022

EPEPL/TCC -37 MLD STP /424/2021-22 4/7/2022

EPEPL/TCC -37 MLD STP /424-B/2021-22 4/25/2022

EPEPL/TCC -37 MLD STP /425/2021-22 4/28/2022

EPEPL/TCC -37 MLD STP /424-C/2021-22 6/28/2022

EPEPL/TCC -37 MLD STP /432/2021-22 7/23/2022

EPEPL/TCC -37 MLD STP /430/2021-22 7/23/2022

EPEPL/TCC -37 MLD STP /431/2021-22 7/23/2022

EPEPL/TCC -37 MLD STP /433/2021-22 8/8/2022

EPEPL/TCC -37 MLD STP /434/2021-22 9/22/2022

EPEPL/TCC -37 MLD STP /435/2021-22 10/12/2022


EPEPL/TCC -37 MLD STP /436/2021-22 11/3/2022

EPEPL/TCC -37 MLD STP /436-A/2021-22 11/3/2022


REMARK

You might also like