S.NO CLEARANCE
1 APPROVAL SUBMISSION
2 APPROVAL SUBMISSION
3 SITE CLEARANCE
4 SITE CLEARANCE
5 APPROVAL SUBMISSION
6 APPROVAL SUBMISSION
7 APPROVAL SUBMISSION
8 APPROVAL SUBMISSION
9 APPROVAL SUBMISSION
10 SITE CLEARANCE
11 APPROVAL SUBMISSION
12 APPROVAL SUBMISSION
13 APPROVAL SUBMISSION
14 APPROVAL SUBMISSION
15 APPROVAL SUBMISSION
16 APPROVAL SUBMISSION
17 PAYMENT
18 APPROVAL SUBMISSION
19 APPROVAL SUBMISSION
20 APPROVAL SUBMISSION
21 APPROVAL SUBMISSION
22 APPROVAL SUBMISSION
23 APPROVAL SUBMISSION
24 SITE CLEARANCE
25 APPROVAL SUBMISSION
26 APPROVAL SUBMISSION
27 SITE CLEARANCE
28 APPROVAL SUBMISSION
29 APPROVAL SUBMISSION
30 APPROVAL SUBMISSION
31 APPROVAL SUBMISSION
32 APPROVAL SUBMISSION
33 APPROVAL SUBMISSION
34 APPROVAL SUBMISSION
35 APPROVAL SUBMISSION
36 APPROVAL SUBMISSION
37 APPROVAL SUBMISSION
38 APPROVAL SUBMISSION
39 APPROVAL SUBMISSION
40 APPROVAL SUBMISSION
41 APPROVAL SUBMISSION
42 APPROVAL SUBMISSION
43 APPROVAL SUBMISSION
44 APPROVAL SUBMISSION
45 APPROVAL SUBMISSION
46 APPROVAL SUBMISSION
47 APPROVAL SUBMISSION
48 APPROVAL SUBMISSION
49 APPROVAL SUBMISSION
50 APPROVAL SUBMISSION
51 SITE CLEARANCE
52 APPROVAL SUBMISSION
53 APPROVAL SUBMISSION
54 PAYMENT
55 APPROVAL SUBMISSION
56 APPROVAL SUBMISSION
57 PAYMENT
58 APPROVAL SUBMISSION
59 PAYMENT
60 APPROVAL SUBMISSION
61 APPROVAL SUBMISSION
62 APPROVAL SUBMISSION
63 APPROVAL SUBMISSION
64 APPROVAL SUBMISSION
65 PAYMENT
66 APPROVAL SUBMISSION
67 APPROVAL SUBMISSION
68 APPROVAL SUBMISSION
69 PAYMENT
70 PAYMENT
71 APPROVAL SUBMISSION
72 APPROVAL SUBMISSION
73 APPROVAL SUBMISSION
74 APPROVAL SUBMISSION
75 PAYMENT
76 APPROVAL SUBMISSION
77 APPROVAL SUBMISSION
78 SITE CLEARANCE
79 APPROVAL SUBMISSION
80 PAYMENT
81 APPROVAL SUBMISSION
82 PAYMENT
83 PAYMENT
85 APPROVAL SUBMISSION
86 APPROVAL SUBMISSION
89 PAYMENT
90 APPROVAL SUBMISSION
91 APPROVAL SUBMISSION
92 APPROVAL SUBMISSION
93 APPROVAL SUBMISSION
94 APPROVAL SUBMISSION
96 APPROVAL SUBMISSION
97 PAYMENT
98 APPROVAL SUBMISSION
103 PAYMENT
114 PAYMENT
116 PAYMENT
117 PAYMENT
122 PAYMENT
124 PAYMENT
125 PAYMENT
131 PAYMENT
Submission of SBR Structural Design and drawings and General Arrangement Drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Site Physical land not yet hnadover -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Centrifuge & SBR data sheet ,General
Arrangement drawing & QAP -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Revised structural design and
drawings of SBR Basin -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Proposing M/S Dr.Amin Controllers Pvt Ltd As a
Third Party Agency for Inspection of electro mechanical Equipments -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of PLC panel General Arrengement &
PLC System Architecture Diagram -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Electro Mechanical Equipment Data
Sheet ,GA Drawing And QAP -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Civil Material Testing -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Inspection call for the Electro
Mechanical equipments Such as Detritor mechanism And Agitator -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Electro Mechanical equipments
Data sheet ,GA drawing and QAP -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Electro Mechanical equipments
Data sheet ,GA drawing and QAP -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3-Submission of Gravity sludge Thickner Structural
Design & drawing and general arrengment drawing -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3-Submission of 600KVA DG ,MCC Panel& LPBS
technical Details ,GA drawing Single line Diagram &QAP -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package Submission of Revised Billing Breakup approval
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package Submission of inspection report Detritor and Dispatch
the material to site
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package Submission of call for the electro Mechanical
equipments such as air blower with Motor
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package Submission of electrical data sheets and Revised GA
drawing of fine screen
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Proposing M/S SGS india Pvt Ltd & TUV India Pvt
Ltd As a Third Party Agency for Inspection of electro mechanical Equipments -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Revised GA drawing Air blower -
Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 inspection of the electro Mechanical Equipments
Mechanical and Manual screens -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 inspection of the electro Mechanical Equipments
Mechanical and Manual screens -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Exacvated Soil Dump -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Millestone -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of TFS revised GA and structure
drawings -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection of the electro Mechanical equipments
Screw Pump -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Cutting & Removel of Trees at site -Reg
trichy Corporation Under Package -3 Submission of Revised RA Bill -02 for Civil work and
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection call for the. Electro mechanical
Equipments Mechanical and Manual screens -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Payment Invoice -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Electro mechanical Equipments Detrtior & Agitator
Stock-Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection call for the. Electro mechanical
Equipments Thickener Mechanism -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Payment recepit and withheld amount -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Revised Structural Design Drawings and
Arrangement Drawing For Air Blower Building & Thickner Feed Pump -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA Bill 02 Payment Recipet -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Project completion schedule for Revision of Project
Mile Stone -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Electro Mechanical equipment stock -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of submersible pump data
sheet ,General arrangement Drawing & QAP -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Power cable Schedule ,control cable
schedule & Sizing Calculations -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of RA Bill 04 for Civil works And
Mechanical Supply -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of RA Bill 04 for Payment Recipet Letter
-Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission for Inspection Call Letter for the
Submergible Pumps -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 PLC panel system Stock -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission for Inspection Call Letter for the
Submergible Pumps -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Payment Recipet -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Payment Recipet -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Payment Recipet -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission for Inspection Call Letter for Decanter
centrifuge -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Treated Sweage Water Disposal Works -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Final Inspection Report -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of RA bill -05 TEX invoice Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Treated water Transfer Pump &
dosing Pump Data sheet ,General Arrangement Drawing & QAP
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SBR Decanter ,Centrifuge and Submergible Pump
stock -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 STP Plant Area -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Transformer 1250KVA Data
sheet ,General Arrangement Drawing & QAP
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA Bill 06 -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Request for Approval submission ,Revised Billing
Breakup Sch-04 For Installation and Other services
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA Bill 06 Tax Invoice -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA Bill 05 Tax Invoice -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Request for BG Renewal & reduction Letter -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Revised billing breakeup Sch . No -
04
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Revised billing breakeup Sch . No -
04
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Request for inspection Call for Treated water
Transfer Pump-Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Request for inspection Call for Dosing Pump-Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA bill -05 Payment Recepit
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection Call for Electro Mechanical Equipment
Diffuser With Internal Pipeing for SBR system
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection call for 2*600 KVA DG set -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection call letter for the Electrical Equipments -
MCC Panel & LPBS (LT panel ) -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Request for Deputation of CMSC engineer to
Witness the Cube Test at M/s Dalmia RMC Plant -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 BG Renewal & Reduction Letter
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Final Inspection report
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Revised Billing breakup Sch 04 for
Installation and other Services -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA bill -06 Submission
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of project completion schedule for
revision of project Mile stone
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection Call Letter for the Electrical Equipments
Transformer 1250 KVA Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Action Plan Report
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Chlorine Tonner Data Sheet ,General
Arrangement Drawing &QAP
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection Call Letter for the Chlorine Tonner
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA bill -06 Invoice
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Site Clearence is required to start the civil work for
chlorination building ,chlorine contact Tank and Treated water Sump at site
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3Submission Revised Numeration Drawing for PTU
unit
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION RENEWED performance Bank
Guarantee
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3Submission of Compound Wall Drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of DI pipe QAP approval -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Proposed to Execute the SS -304 Hand Rail Pipe
Instead to GI pipe -Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Ms pipe and Fittings QAP approval -
Reg
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Inspection Call letter for the Di pipe
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Gas chlorination sysytem Data Sheet
With Drawing and QAP Approval
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Sluice Gate valve Data Sheet With
GA Drawing and QAP Approval
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA bill -06 Recipet
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Relase of withheld Amount
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA bill -07 Bill submission
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 RA bill -07 Invoice
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission Of Di Pipe fitting ,Flange QAP for
Approval
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of Structural drawings for DG padestal
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION RENEWED performance Bank
Guarantee
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Submission of RA bill-07 for mandatory and spare
parts supply schedule -2 installation & other service schedule -2 installation & other
services schedule -04 payment recipet
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of price Adjustment Bill -01 to 07
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of CCT tank drawing Change
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of RA Bill -08 Payment receipt
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of RA Bill -08 Payment Tax Invoice
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Transformer GA drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of DG shed structural drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of TNEB for CIEG approval
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of site Clearance
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of outdoor 11KV HT DB structure Yard
with 11 KV HT VCB
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of RA Bill -08
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Street Light and outer Building
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Street Light Pole Foundation
Drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Layout and other details of
pathway Drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Layout and other details of Road
Drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Renewed performance
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of rain water hervesting drawing
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Site Clearance & Retention Amount
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 Site Clearance & Retention Amount
Construction of sewage treatment Plant Capecity 37 MLD on DBO basis for UGGS in
trichy Corporation Under Package -3 SUBMISSION of Scope Of Instrumention
DATE OF SUBMISSION
LETTER NO LETTER
EPEPL /TCC-37 MLD STP /096/2018-19 1/28/2019
EPEPL/TCC -37 MLD STP /001/2018-19 4/5/2019
EPEPL/TCC -37 MLD STP /004/2019-20 4/10/2019