Completion For Work From Home
Completion For Work From Home
APRIL 16 SATURDAY
CONTACT JEBREN FOR THE SCHEDULE OF ARENAS TEAM DMCI MATERIALS , DMCI
FABRICATION ALSO JACKS TEAM FOR THE AEROPACK FABRICATION AT MATERIALS UPDATE AND
MONITOR THE TURRET,SHEARING AND BENDING FOR THE DMCI AND AEROPACK MATERIALS.
ANSWER THE QUESTION OF JEBREN FOR THE CUTTING LIST OF A7 AND THE JAMB
PROFILE FOR THE FIX AND LOUVER DOOR FOR A7 DEMOUNTABLE FIX LOUVER.
CONTACT KUYA JACK IF HE HAS MATERIALS FOR A7 DEMOUNTABLE LOUVER AND
ANSWER HIS QUESTION FOR THE PROFILE IF THE JAMB IS SINGLE RABBET OR DOUBLE RABBET JAMB.
CHECK AND APPROVED ALL REQUEST FOR THE VISITA APPLICATION.
APRIL 17 SUNDAY
MESSAGE JEBREN FOR THE UPDATE OF ARENAS AND MACHINE OPERATOR OUTPUT
AND IF JACK TEAM HAS ALREADY A MATERIALS FOR AEROPACK ALSO UPDATE JEBREN TO FINISH THE
JAMB OF AEROPACK METAL DOOR SO THAT MONDAY MORNING GENERAL ASSEMBLY ALREADY HAS
THE JAMB.
UPDATE JEBREN THAT WE HAVE SCHEDULE FOR PARTIAL DELIVERY ON WEDNESDAY
FOR AEROPACK DEMOUNTABLE LOUVER (JACKS TEAM) AND PARTIAL DELIVERY FOR METAL DOOR
(GENERAL ASSEMBLY).
REVIEW ALL SHOPDRAWING BEFORE MAKING A CUTTING LIST BEFORE SENDING IT
JEBREN (PREMIUM AND NATURA,AEROPACK A3 AND DMCI ASTON).
WENT TO OUR MUNICIPAL COUNCILOR TO HAVE A SCHEDULE MEETING FOR THE
PROPOSED ROLL UP AND METAL DOOR IF INCASE HE WILL HAVE PROJECT.
APRIL 18 MONDAY
BENZAR E. MISLANG