Professional Documents
Culture Documents
Bot Balochistan Final
Bot Balochistan Final
Implementation Stage
Sr. Length
No Project Project Details Status Map
(Km)
Concessionaire: M/s IBEX
180 m Tunnel is operational under a 25 years'
2 Lakpass Tunnel (N-25) 0.18 Construction Co., Pakistan, Map View
Concession - ON BOT BASIS.
Operational since 2008.