Professional Documents
Culture Documents
Pcdo Top Summary
Pcdo Top Summary
2022
Period from Last month 21st to this month 20th to be submitted on 20th of every month
1.Failure Extracts
Clearance(PLCT,369
Duration of Failure
mins and Mode of
Department wise
with Duration in
Trains Detained
Failure analysis
Failure analysis
Failure MSG no
How rectified
3B,Co-on),PN
Gear at Fault
Gear wise
SFR NO
S.NO
Time
STN
3.Works attended
1.Motor points replacement and maintenance all parts of point works donein the period to be written with dates,including
engg works like,replacement of stock & tong rails,packing,opening adjustment,Lifting,Housing improvement, Structure bars,Guage
tie plates,Chair plates,bolts,Burr cutting,etc…
2.Track circuits replacements & maintenance all parts of TC work done in the period to be written with dates, through
bonds, drip loop cable,Fiber TLJB’s incudeing Engg Works like Drainage,Ballast Clearance.GFN liners,’J’Type clips, Lifting of
TLJB’s etc…
4.Equiptments replacements
STN LED’s,Relays,Motor points, Circuit Make DOM DOI SL.NO Failed
MSDAC,DC-DC Date
convertors,IPS,Chargers,Block
Instrument,Batteries,LC
Booms,All Type of Equiptments
5.EKT Maintenance
6.Joint Inspections, Attended
STN SECTION DATE TIME TIME TO Number From Number To Cause of Use
FROM
9.Cable Meggering
S.No STN Date of Circuit Cable Location Location Length Remarks
Meggering type from To
SOUTH CENTRAL RAILWAY
S&T (SSE/SIG/NLR SECTION)
PCDO-NLR