You are on page 1of 1

FG OUT

FG OUT
FG OUT
75230
E/E E/E

FG-EXIT FG-EXIT

MLT Tanks MLT Tanks


De-dusting FG DISPATCH AREA CENTRIFUGE CENTRIFUGE
De-dusting
3000x2000 De-dusting De-dusting 2500x1800
3000x2000 2500x1800

>
MLT Tanks MLT Tanks MLT Tanks
>

PM-IN
PM-IN

>

>
MLT Tanks MLT Tanks MLT Tanks
Packing Material Packing Material
stores stores
5000x4000 6043x5037

>
>

3943x9000
3943x9000

MLT Tanks MLT Tanks

FG Quarantine
FG Quarantine

MLT Tanks

1770

>

>
Halar 24"
MLT Tanks

Centrifuge
MLT Tanks MLT Tanks

1050
FG STORES PM STORES

RCVD
SS,0.3kl
ANFD
Reactor -34
MSGL,1.0kl
Reactor -33

Hastealloy,1.0kl
Hastelloy-0.5kl

>

>

>
>

> > >

13215
2.50 m wide corridor
2.50 m wide corridor
2.0 m wide corridor 2.0 m wide corridor

>
packing room

&

>
packing room

>

>
>

4000 x 4592 Cleaned Eqp Cleaned Eqp


Wash

5230x 3450
3234x 2500 2583x 3000

Sifter ,250mmØ
Multimill,50Kph
Equipments

>
4450 x 2500

>

>
CHWP-01 CHWP-01 Wash

AIR DRYER
>
330TR 330TR Men Airlock-1
UP UP
Wash Equipments Change room Equipments
2240x 2000 1500x 2000

2.00 m wide corridor


2.00 m wide corridor

3840x2000 2448 x 6100

>
VACANT AREA
>

packing area > >


Jet Mill,50KPH Jet Mill,50KPH
>
4000 x5000 Un-Cleaned Eqp Un-Cleaned Eqp 5130 x5240 >
> 3234 x 2500 2583 x 3000
>
Space for UTILITY Men Airlock-1
>
2.50 m wide corridor 2.50 m wide corridor
4550 x 2500

>
>

CHANGE ROOM
> >
143.49 Sq mtr
ROOM

>Men Airlock-1 > CHANGE


2532 x 2500 ROOM

3800
1896x3570
SPACE FOR

30230
Milling & Sifting Milling & Sifting

2.50 m wide corridor


2.50 m wide corridor

2.75 INTERNAL CORRIDOR


>
5000 x 5000 5130x3260
ELECTRICAL PANEL

>
stores

Multimill: 300KPH Multimill: 300KPH


2865x4625
Accessories

1.0KL,MS
2.00 m wide corridor
2.00 m wide corridor

AIR DRYER
ACS01-RC01
>
CHWP-01 CHWP-01 Sifter : 750mmØ Sifter : 750mmØ
>

330TR 330TR Access. Room Access. Room


4000 x 5000 5130x2605

>
>
>

>

ACS-01,240 SCFM
3000x3000

Air compresor Jetmill


Material Lift
>

Gents
>

office room
3660 x 6385

4996 x 4770
room

Change Rooms

Ground Floor @ 0.0 m lvl


4000 x 6385
RCVD-02 RCVD-02
SS316 ,2.0kl SS316 ,2.0kl

>
>
Ladies /Visitor change

>
>

>

MLT Tanks MLT Tanks

2.50 m wide corridor


2.50 m wide corridor

MLT Tanks
>

FUTURE RCVD
3000x3000
Material Lift

>
>

13215
OD OD
day linen

0 0

2000x2000
2000x2000
70 70
3660x 2000

Ø1 Ø1

Airlock Gents

3287 x 2500
>

air lock ladies

DAY TANKS DAY TANKS DAY TANKS DAY TANKS


>

Gents Toilet area


SOLVENT SOLVENT SOLVENT SOLVENT
MLT Tanks MLT Tanks MLT Tanks

>
>

>

Anti Room
2271 x 6500
Entrance Lobby
DAY TANKS DAY TANKS DAY TANKS DAY TANKS
>

SOLVENT SOLVENT SOLVENT SOLVENT


Technical area 7890x 3875 Technical area
>
>
De-dusting

3940 X 3570
3940 x 3000

Material Airlock-1

3214 x 2500
Ladies Toilet area
>
>

E/E E/E
MEN
ENTRY
> > >
UP

Platform

>
N

MAN ENTRY

OPTION-3

You might also like