You are on page 1of 1

GLUCOSE

PI PI
s s

N2 PRV CIP VENT N2 PRV CIP VENT

s PI s PI
s

s
CIP N2 PRV VENT
SP1 s PI

s
SP1

MANHOLE MANHOLE s PI s PI SP1

PRV VENT PRV VENT

HOT PRV VENT

WATER
HOT OUT
HOT
GL-T1 WATER GL-T2 1KL
WATER
OUT SERVICE
OUT 20KL
20KL GLUCOSE TANK
GLUCOSE RTD
TANK-2 GL-ST
TANK-1
HOT
WATER
IN

s
RTD RTD
HOT HOT
WATER WATER s
IN IN

FILTER

PI s PI s

s
TO
DRAIN TO
FILTER s DRAIN

s
FILTER

TO
DRAIN
TO
DRAIN

- - - - - - PROJECT : - PROJECT No : PTPPL_P124_2223


- - - - - - - DWG No : PTPPL_P124_P&ID
- - - - - - TITLE : - SIZE SCALE SHEET REV

GLUCOSE TANK -
-
-
-
-
-
-
-
-
-
-
-
-

PROCHEM TURNKEY PROJECTS PVT.LTD.


A1 N.T.S. 4 00

- - - - - - Gate No. 448 , Success Industrial Park, Nighoje , Tal- khed


00 01-11-2022 Original drawing issue PS SSR S.R. Pune, Maharashtra :- 410501, Tel.:-020-65100517
This Drawing is the property of PROCHEM TURNKEY PROJECTS PVT.LTD. and must be returned on request.it is submitted as confidential information in connection with enquiry,tender order or contract
it is not to be used for any other purpose or order nor may it be. copied or lent without our authority in writing. REV DATE DISCRIPTION DRAWN CHECKED APPROVED Sing ENGINEERING. CLIENT

ALL DIMENSIONS ARE IN mm.