Outstanding list of works on vessel

Victoria

1. Sea chest strainer frabrication --- Yard ( PIPING )

2. FW Domestic pipe for generator frabrication --- Yard ( PIPING )

3. Sounding pipe – DW Port 5 --- Yard to rectify—( PIPING )

4. Fire flap cover --- Yard--- ( EXON )

5. Cleaning in ER after pipe modification --- Yard to follow up during dry

docking--- ( SUPPORT SERVICES )

6. Gyro local alarm drawing --- Yard – ( ELECTRICAL )

7. TV/DVD installation --- Yard---- ( EXON )

8. Escape hatch cover modifications (Steering room) -Yard ( MECHANICAL )

9. Remove dirty oil tank prior to dry-docking --Yard – ( SUPPORT

SERVICES)

10. Rescue boat piping - Yard to provide stainless steel not copper ( PIPING )

11. Air receiver leaking hose modification --- Yard to rectify ( PIPING )

12. Rubber Expansion joint to have additional four holes drilled – Yard

( Mech/Stel Work )

13. Pad eye load test --- Yard to check if can be done – ( LOAD TEST SUB )

14. Dhatec pipe rail system --- Yard ( MECH/SHIP/STEL )


Outstanding list of works on vessel

Apollo

1. Sea chest strainer frabrication --- Yard ( PIPING )

2. Exhaust insulation --- Yard ( PIPING )

3. Gyro local alarm drawing --- Yard ( ELECTRICAL )

4. TV/DVD installation --- Yard ( EXON )

5. Escape hatch cover modifications (Steering room) -Yard ( MECHANICAL)

6. Bosun store hatch cover – grind latch ( STEEL WORK ) DONE

7. Exhaust area in monkey island to have additional drain hole –Yard

( STEL WORK )

8. Secure bridge deck air condition as per Victoria with mild steel bars ---

Yard ( STEEL WORK )

9. Pad eye load test --- Yard to check if can be done ( LOAD TEST SUB CON )

10. Dhatec pipe rail system --- Yard ( MECH / STELL )


Dear All,
APOLLO/ VICTORIA ADDITIONAL JOBS

1 To supply 100 tons of industrial water for calibration of mud tanks. : supply of
the water is in progress . ( Only for Apollo) ( SUPPOR SERVICE ) DONE

2, Supply and insulate the safety fire room AHU pipe with k flex class 1 insulation
and self-adhesive tapes. : CLOSED. ( only for Apollo)

3,To fabricate and supply new basket strainer for main sea chest in engine room
for both Vessels. : waiting material to commence work. ( Victoria and Apollo)

4, To secure bridge deck air condition as per Victoria with mild steel bars.
: fabrication is in progress at workshop. ( only for Apollo)

5, To free up steering room hatch cover and weld half round pipe for the spring
stopper. Plan to start work today. ( only for Apollo)

6 To fabricate and install flat bar coaming around the air receiver ( Victoria )
waiting for piping to start work.

7, To fabricate sea water cooling pipe for Harbour Generator ( Victoria and
Apollo) sample has been send to yard workshop for fabrication.

8, To modify and install folder type stainless steel fire flap for ER exhaust on 3rd
deck. ( Victoria and Apollo) sample has been done waiting for approval for the
rest to be done.

9 To supply and install stainless steel table for electronic room (Apollo ) :
Fabricating is in progress

10, To repair and refix ECR floor rubber (Apollo) :CLOSED