SERVICES)
10. Rescue boat piping - Yard to provide stainless steel not copper ( PIPING )
11. Air receiver leaking hose modification --- Yard to rectify ( PIPING )
12. Rubber Expansion joint to have additional four holes drilled – Yard
( Mech/Stel Work )
13. Pad eye load test --- Yard to check if can be done – ( LOAD TEST SUB )
Apollo
( STEL WORK )
8. Secure bridge deck air condition as per Victoria with mild steel bars ---
9. Pad eye load test --- Yard to check if can be done ( LOAD TEST SUB CON )
1 To supply 100 tons of industrial water for calibration of mud tanks. : supply of
the water is in progress . ( Only for Apollo) ( SUPPOR SERVICE ) DONE
2, Supply and insulate the safety fire room AHU pipe with k flex class 1 insulation
and self-adhesive tapes. : CLOSED. ( only for Apollo)
3,To fabricate and supply new basket strainer for main sea chest in engine room
for both Vessels. : waiting material to commence work. ( Victoria and Apollo)
4, To secure bridge deck air condition as per Victoria with mild steel bars.
: fabrication is in progress at workshop. ( only for Apollo)
5, To free up steering room hatch cover and weld half round pipe for the spring
stopper. Plan to start work today. ( only for Apollo)
6 To fabricate and install flat bar coaming around the air receiver ( Victoria )
waiting for piping to start work.
7, To fabricate sea water cooling pipe for Harbour Generator ( Victoria and
Apollo) sample has been send to yard workshop for fabrication.
8, To modify and install folder type stainless steel fire flap for ER exhaust on 3rd
deck. ( Victoria and Apollo) sample has been done waiting for approval for the
rest to be done.
9 To supply and install stainless steel table for electronic room (Apollo ) :
Fabricating is in progress