Flats Nos Location of Works Unit Nos Length(L) Breadth(B) Remarks

Common Toilet
Left Wall Sft 1 7.83 7.58
Ledge Wall Jams Sft 2 5 4.17

Right Wall Sft 1 7.83 7.58


Front Wall Sft 1 4.83 7.58

Window Sft 2 2 2.91


Window Jams Sft 2 2.91 4

Back Wall Sft 1 4.83 7.58

Door Sft 1 2.58 7.17


Door Jams Sft 1 9.75 0.17

Flooring Sft 1 4.83 7.83


Ledge Wall Sft 1 2.67 0.42

Bedroom -2 Toilet
Right Wall Sft 1 7.83 7.58
Ledge Wall Sft 2 4.17 0.42

Left Wall Sft 1 7.83 7.58


Front Wall Sft 1 4.83 7.58
Window Sft 1 2.08 2.91
Sft 2 2.08 0.33
Window Jams
Sft 2 2.58 0.33
Back Wall Sft 1 4.83 7.58
Door Sft 1 2.58 7.17
Door Jams Sft 1 9.75 0.17

Flooring Sft 1 4.83 7.83


Ledge Wall Sft 1 5 2.75

Master Toilet
Right Wall Sft 1 4.91 7.58
Left Wall Sft 1 5.33 7.58
Window Sft 1 2 2.91
Window Jams Sft 1 6.91 0.33

Front Wall Sft 1 8.75 7.58


Ledge Wall Sft 2 4.17 0.42
001
Back Wall Sft 1 8.75 7.58
001

Door Sft 1 2.58 7.17


Sft 1 9.75 0.17
Door Jams
Sft 1 7.17 0.5

Flooring Sft 1 5.25 8.75


Ledge Wall Sft 1 2.91 0.42
Door Piece Sft 1 2.58 0.5

Sft 1 10 11.91
Bed Room 1 Flooring
1 4.33 0.33
Jams Sft 1 2.41 0.42
Door Piece Sft 1 2.91 0.42
Skirting Rmt 42.25

Bedroom 2 Toilet
Flooring Sft 1 12.5 11.33
Skirting Rmt 44.5

Bedroom Passage Sft 1 3 11.5


Door Sft 1 2.67 0.33
BR-2 Toilet Door Sft 1 2.67 0.33
Skirting Rmt 34.08

Kitchen Sft 1 7.91 12.75


Door Sft 1 2.91 0.83

Main Door Passage Sft 1 4.91 8.41


Deduction Sft 1 1.5 0.91

Sft 1 11.41 21.67


Living/Dining
Sft 1 10.58 0.5

Near Balcony area Sft 1 7.17 11.33


Jams Sft 1 7.91 0.91

Living balcony Skirting Rmt 23.9


Kitchen/Living Skirting Rmt 101

Door Jam Sft 1 2.91 0.17


Skirting Rmt 32.25

Balcony Sft 1 11.33 4.41


Skirting Rmt 13.58
Utility Sft
Flooring Sft 1 4.33 7.5
002 Dado
Left Wall Sft 1 4.33 3
002

Front & Right Wall Sft 1 9.17 3


Back Wall Sft 1 4.67 3
Door piece Sft 1 2.83 0.58
Flats Nos Location of Works Unit Nos Length(L) Breadth(B) Quantity(LxB) Remarks

Common Toilet
Left Wall Sft 1 7.83 7.58 59.35
Ledge Wall Jams Sft 2 5 4.17 41.70

Right Wall Sft 1 7.83 7.58 59.35


Front Wall Sft 1 4.83 7.58 36.61

Window Sft 2 2 2.91 -11.64


Window Jams Sft 2 2.91 4 -23.28

Back Wall Sft 1 4.83 7.58 36.61

Door Sft 1 2.58 7.17 -18.50


Door Jams Sft 1 9.75 0.17 -1.66

Flooring Sft 1 4.83 7.83 37.82


Ledge Wall Sft 1 2.67 0.42 -1.12

Bedroom -2 Toilet
Right Wall Sft 1 7.83 7.58 59.35
Ledge Wall Sft 2 4.17 0.42 3.50

Left Wall Sft 1 7.83 7.58 59.35


Front Wall Sft 1 4.83 7.58 36.61
Window Sft 1 2.08 2.91 -6.05
Sft 2 2.08 0.33 -1.37
Window Jams
Sft 2 2.58 0.33 -1.70
Back Wall Sft 1 4.83 7.58 36.61
Door Sft 1 2.58 7.17 -18.50
Door Jams Sft 1 9.75 0.17 1.66

Flooring Sft 1 4.83 7.83 37.82


Ledge Wall Sft 1 5 2.75 -13.75

Master Toilet
Right Wall Sft 1 4.91 7.58 37.22
Left Wall Sft 1 5.33 7.58 40.40
Window Sft 1 2 2.91 -5.82
Window Jams Sft 1 6.91 0.33 2.28

Front Wall Sft 1 8.75 7.58 66.33


Ledge Wall Sft 2 4.17 0.42 3.50
001
Back Wall Sft 1 8.75 7.58 66.33
001

Door Sft 1 2.58 7.17 -18.50


Sft 1 9.75 0.17 1.66
Door Jams
Sft 1 7.17 0.5 3.59

Flooring Sft 1 5.25 8.75 45.94


Ledge Wall Sft 1 2.91 0.42 -1.22
Door Piece Sft 1 2.58 0.5 1.29

Sft 1 10 11.91 119.10


Bed Room 1 Flooring
1 4.33 0.33 1.43
Jams Sft 1 2.41 0.42 -1.01
Door Piece Sft 1 2.91 0.42 1.22
Skirting Rmt 42.25

Bedroom 2 Toilet
Flooring Sft 1 12.5 11.33 141.63
Skirting Rmt 44.5

Bedroom Passage Sft 1 3 11.5 34.50


Door Sft 1 2.67 0.33 -0.88
BR-2 Toilet Door Sft 1 2.67 0.33 0.88
Skirting Rmt 34.08

Kitchen Sft 1 7.91 12.75 100.85


Door Sft 1 2.91 0.83 2.42

Main Door Passage Sft 1 4.91 8.41 41.29


Deduction Sft 1 1.5 0.91 -1.37

Sft 1 11.41 21.67 247.25


Living/Dining
Sft 1 10.58 0.5 5.29

Near Balcony area Sft 1 7.17 11.33 81.24


Jams Sft 1 7.91 0.91 7.20

Living balcony Skirting Rmt 23.9


Kitchen/Living Skirting Rmt 101

Door Jam Sft 1 2.91 0.17 -0.49


Skirting Rmt 32.25

Balcony Sft 1 11.33 4.41 49.97


Skirting Rmt 13.58
Utility Sft
Flooring Sft 1 4.33 7.5 32.48
002 Dado
Left Wall Sft 1 4.33 3 12.99
002

Front & Right Wall Sft 1 9.17 3 27.51


Back Wall Sft 1 4.67 3 14.01
Door piece Sft 1 2.83 0.58 1.64
Material Unit Quantity per sqm Quantity per sft
cement RCC woeks Bags 1.94 0.18
Masonry works Bags 0.43 0.399
Plaster works Bags 1.18 0.1096
other works Bags 0.32 0.0297
Total 3.87 0.7183 Footings
Steel RCC works MT 24.25 2.253 columns upto plinth beam
Total 24.25 2.253 Tie beam
concrete RCC works cum 0.21 0.697 columns-super structure
Masonry works cum 0.05 0.166 slab
Internal plaster cum 0.23 0.764 beam
External plaser cum 0.15 0.498 chejja/loft/lintel
Tiling cum 0.04 0.132 overhead tank
water proofing cum 0.03 0.09966
other works 0.01 0.03322
Total 0.72 2.38988
AgggregateRCC works 0.27 0.8969
Rubbles Plinth beam soling 0.06 0.199
Murum Plinth beam filling 0.23 0.764

Sand Internal Plasterinsqmt 0.27 0.896


Lime Flooring sqmt 0.16 0.0148
MS Window cum 0.14 0.013
Mosaic Tiles cum 0.14 0.013
Glass for MS windows 0.75 0.75
Mosaic Skirting 0.82 0.25
Bathroom-Toilet Flooring 0.05 0.05
Steel consumption
0.55 kg/sqmt
2.15 kg/sqmt
1.15 kg/sqmt
4.8 kg/sqmt
7 kg/sqmt
7.5 kg/sqmt
0.55 kg/sqmt
0.55 kg/sqmt
24.25
No. Construction Work Details Coefficient
1 P.C.C. (1:5:10) 2.6 Bags/cu.mt.
2 P.C.C. (1:4:8) 3.4 Bags/cu.mt.
3 P.C.C. (1:3:6) 4.4 Bags/cu.mt.
4 R.C.C. M-15 (1:2:4) 6.3 Bags/cu.mt.
5 R.C.C. M-20 (1:2:4) 8.00 Bags/cu.mt.
6 R.C.C. M-25 (1:1:2) 12.20 Bags/cu.mt.
7 Brick work in CM (1:6) 1.32 Bags/cu.mt.
8 Brick work in CM (1:4) 1.90 Bags/cu.mt.
9 Half Brickwork in (1:4) 0.213 Bags/Sq.mt.

10 Plastering in CM (1:4) - 15mm thick 0.131 Bags/Sq.mt.

11 Plastering in CM (1:4) - 12mm thick 0.109 Bags/Sq.mt.

12 Plastering in CM (1:4) - 6mm thick 0.055 Bags/Sq.mt.

13 Plastering in CM (1:6) - 15mm thick 0.086 Bags/Sq.mt.

14 Plastering in CM (1:6) - 12mm thick 0.072 Bags/Sq.mt.

15 Plastering in CM (1:6) - 6 mm thick 0.073 Bags/Sq.mt.

20mm thick sand face plastering in


two layers. (13 mm thick plaster in
16 0.220 Bags/Sq.mt.
CM 1:4 and 7 mm thick plaster in
CM 1:2)

17 Plastering in CM (1:3) - 13mm thick 0.157 Bags/Sq.mt.

18 Plastering in CM (1:4) - 13 mm thick 0.117 Bags/Sq.mt.

19 Plastering in CM (1:3) - 20mm thick 0.228 Bags/Sq.mt.

20 Plastering in CM (1:4) - 20mm thick 0.170 Bags/Sq.mt.

21 Floating coat of neat cement 0.044 Bags/Sq.mt.

22 Brick on edge pitching in CM (1:4) 0.138 Bags/Sq.mt.

23 Brick on edge pitching in CM (1:3) 0.185 Bags/Sq.mt.

Flush pointing in brick work with


24 0.031 Bags/Sq.mt.
CM (1:3)
40mm thick Damp proof course in
25 0.32 Bags/Sq.mt.
M-20
26 25 mm thick IPS in M-15 0.244 Bags/Sq.mt.
27 40 mm thick IPS in M-15 0.340 Bags/Sq.mt.
50mm thick granite flooring, 1st
28 layer 35mm thick (1:1.5:3), 2nd layer 0.433 Bags/Sq.mt
15 thick (1:2)
125mm high plaster skirting in CM
29 0.034 Bags/R.M.
(1:3)
25mm thick kota stone over 20mm
30 0.24 Bags/Sq.mt.
thick bedding in CM (1:6)
40mm thick kota stone over 20 mm
31 0.264 Bags/Sq.mt.
thick bedding in CM (1:6)
18mm thick kota stone over 12 mm
32 0.264 Bags/Sq.mt.
thick bedding in CM (1:6)
33 6 mm thick glazed tiles fixing 0.088 Bags/Sq.mt.

34 25mm thick CM screed in CM (1:5) 0.218 Bags/Sq.mt.


20mm thick mosaic tiles over 25mm
35 0.228 Bags/Sq.mt.
thick bedding in CM (1:6)
18mm thick mosaic tiles over 20mm
36 0.200 Bags/Sq.mt.
thick bedding in CM (1:6)
18mm thick marble skirting over
37 0.160 Bags/Sq.mt.
12mm thick bedding in CM (1:6)

Water Proofing treatment with 50mm


thick screed in CM (1:5), 115 thick
38 1.18 Bags/Sq.mt.
brick bats in CM (1:3), third layer of
25 mm thick in CM (1:3)

Fixing of rainwater Pipes


39 110 mm diameter PVC 0.048 Bags/Opening
160mm diameter PVC 0.075 Bags/Opening
Joining & Fixing of CI rainwater Pipes
40 100 mm diameter 0.176 Bags/100 mtr.
150 mm diameter 0.264 Bags/100 mtr.
Fixing wooden Frame/Steel frame
41 doors in M-15 concrete of block size. 0.129 Bags/Door
350 x 100 x 100 mm
Fixing of steel louvers/windows in
42 M-15 grade concrete of block 150 x 0.008 Bags/Sq.mt
50 x 50 at 750 mm c/c.

43 Fixing of rolling shutters. 0.70 Bags/ 100 Sq.Mt.

Providing and Fixing of 50mm thick


44 0.329 Bags/Sq.mt.
RCC jali.
45 Fixing of 50 mm thick RCC Jali. 0.051 Bags/Sq.mt.
Fixing of glazed earthen ware Orissa
46 0.5 Bags/No's
pan type water closet.
47 Fixing of white glazed EWC. 0.05 Bags/No's
48 Fixing of large flat back urinal. 0.03 Bags/No's
49 Fixing of hand wash basin/sink 0.03 Bags/No's

50 Fixing of floor trap of 100/100 mm 0.05 Bags/No's

Jointing and fixing of soil waste Pipe.

80mm diameter. 0.132 Bags/RM


51
100mm diameter. 0.176 Bags/RM

150mm diameter. 0.264 Bags/RM

Fixing of GI water pipes concealed work.

15 mm diameter 0.642 Bags/100M

52 20 mm diameter 0.770 Bags/100M

25 mm diameter 0.90 Bags/100M

32 mm diameter 0.96 Bags/100M

Construction of brick masonry valve


chambers of size 300 x 300 x 600
mm CM (1:4) fixing cover in M-15
53 0.700 Bags/No's
concrete, M-15 foundation concrete
13mm thick plaster on inside &
outside exposed surface.
Construction of brick masonry
inspection chamber of size 750 x 750
54
x 1000 mm in CM (1:4) RCC of M-
15, 13mm plastering in CM (1:3).