JENIS PERALATAN

Kode Uraian Alat Harga Alat

E01 ASPHALT MIXING PLANT 166,550,000.00


E02 ASPHALT FINISHER 48,100,000.00
E03 ASPHALT SPRAYER 3,265,000.00
E04 BULLDOZER 100-150 HP 93,550,000.00
E05 COMPRESSOR 4000-6500 L\M 7,150,000.00
E06 CONCRETE MIXER 0.3-0.6 M3 500,000.00
E07 CRANE 10-15 TON 78,550,000.00
E08 DUMP TRUCK 3.5 TON 12,700,000.00
E09 DUMP TRUCK 10 TON 16,500,000.00
E10 EXCAVATOR 80-140 HP 56,950,000.00
E11 FLAT BED TRUCK 3-4 M3 17,950,000.00
E12 GENERATOR SET 13,300,000.00
E13 MOTOR GRADER >100 HP 120,800,000.00
E14 TRACK LOADER 75-100 HP 34,293,000.00
E15 WHEEL LOADER 1.0-1.6 M3 60,000,000.00
E16 THREE WHEEL ROLLER 6-8 T 31,650,000.00
E17 TANDEM ROLLER 6-8 T. 69,600,000.00
E18 TIRE ROLLER 8-10 T. 56,950,000.00
E19 VIBRATORY ROLLER 5-8 T. 47,050,000.00
E20 CONCRETE VIBRATOR 510,000.00
E21 STONE CRUSHER 88,600,000.00
E22 WATER PUMP 70-100 mm 635,000.00
E23 WATER TANKER 3000-4500 L. 7,600,000.00
E24 PEDESTRIAN ROLLER 9,500,000.00
E25 TAMPER 1,080,000.00
E26 JACK HAMMER 2,215,000.00
E27 FULVI MIXER 56,950,000.00
E28 CONCRETE PUMP 7,150,000.00
E29 TRAILER 20 TON 38,000,000.00
E30 PILE DRIVER + HAMMER 55,400,000.00
E31 CRANE ON TRACK 35 TON 53,800,000.00
E32 WELDING SET 1,110,000.00
E33 BORE PILE MACHINE 146,400,000.00
E34 ASPHALT LIQUID MIXER 765,000.00
35. TRONTON 23,050,000.00
36. COLD MILLING MACHINE 312,900,000.00
37. ROCK DRILL BREAKER 56,950,000.00
38. COLD RECYCLER 1,233,800,000.00
39. HOT RECYCLER 1,850,700,000.00
40. AGGREGAT (CHIP) SPREADER 20,250,000.00
41. ASPHALT DISTRIBUTOR 20,250,000.00
42. SLIP FORM PAVER 68,450,000.00
43. CONCRETE PAN MIXER 63,300,000.00
44. CONCRETE BREAKER 56,950,000.00
45. ASPAHLT TANKER 25,600,000.00
46. CEMENT TANKER 25,600,000.00
47. CONDRETE MIXER (350) 1,790,000.00
48. VIBRATING RAMMER 1,270,000.00
49. TRUK MIXER (AGITATOR) 38,400,000.00
50. BORE PILE MACHINE 142,350,000.00
51. CRANE ON TRACK 75-100 TON 56,950,000.00
52. BLENDING EQUIPMENT 31,650,000.00
53. ASPHALT LIQUID MIXER 765,000.00
E54 ALAT BANTU 5,000.00
55 SEWA ALAT BANTU PEMASANGAN 18,840.00
ITEM PEMBAYARAN NO. : 3.1.1 Analisa EI-311
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.60 ton/m3 1.40 - 1.80

II. URUTAN KERJA


1 Tanah yang dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan menggunakan Excavator
3 Selanjutnya Excavator menuangkan material hasil
galian kedalam Dump Truck
4 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh L 5.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman < 40 % Fv 0.90 Faktor konversi
Waktu siklus Ts1 menit dihapus, masuk
- Menggali , memuat T1 0.320 menit dalam waktu siklus
- Lain lain T2 0.100 menit disesuaikam
Waktu siklus = T1 x Fv Ts1 0.42 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 91.89 M3/Jam


Ts1 x Fk

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0109 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktu siklus Ts2 menit
- Muat = (V x 60)/(D x Q1 x Fk) T1 1.19 menit
- Waktu tempuh isi = (L : v1) x 60 T2 15.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 10.00 menit
- Lain-lain T4 2.00 menit
Ts2 28.19 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 3.22 M3/Jam


D x Fk x Ts2

Koefisien Alat / M3 = 1 : Q2 (E08) 0.3105 Jam

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop
- Keranjang
ITEM PEMBAYARAN NO. : 3.1.1 Analisa EI-311
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 91.89 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 643.25 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0218 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0109 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 40,264.55 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 1.00 M3
ANALISA HARGA SATUAN PEKERJAAN

24.03.01.14 Pembesian dengan besi polos Kg


Tenaga:
Mandor 0.0004 O.H
Kepala Tukang Besi 0.0007 O.H
Tukang Besi 0.0070 O.H
Pekerja/Buruh Terampil 0.0070 O.H
Bahan:
Besi Beton Polos 1.0500 Kg
Kawat Beton 0.0150 Kg
Jumlah
Overhead + Profit ( - % )
Nilai HSPK :
24.03.01.15 Pembesian dengan besi Ulir Kg
Tenaga:
Mandor 0.0004 O.H
Kepala Tukang Besi 0.0007 O.H
Tukang Besi 0.0070 O.H
Pekerja/Buruh Terampil 0.0070 O.H
Bahan:
Besi Beton Ulir 1.0500 Kg
Kawat Beton 0.0150 Kg
Jumlah
Overhead + Profit ( - % )
Nilai HSPK :
24.07.05.13 Pengecatan Tembok luar Baru 2 Lapis (Eksterior) m2
Tenaga:
Mandor 0.0030 O.H
Kepala Tukang Cat 0.0063 O.H
Tukang cat 0.0630 O.H
Pekerja terampil 0.0200 O.H
Bahan:
Cat Tembok Dasar/Alkali 0.1000 Liter
Kuas Cat 0.0500 Buah
Kertas gosok 0.5000 Lembar
Cat Tembok Eksterior Khusus ( Dulux ) 0.4700 Kg
Rol 0.0100 Buah
Jumlah
Overhead + Profit ( - % )
Nilai HSPK :
Pemasangan Trucuk Bambu Ø 8 s/d 12 - Batang
P.2,5 m
Tenaga:
Mandor 0.0030 O.H
Tukang Kayu 0.0060 O.H
Pekerja/Buruh Tak Terampil 0.0500 O.H
Bahan:
Bambu Bongkotan dia. 8-12 cm, 1.0000 Batang
P.
3.00 mtr Jumlah
Overhead + Profit ( - % )
Nilai HSPK :
Pengadaan dan Pemasangan Pipa GI Diameter
m1
24.07.04.10 3"
Tenaga :
Mandor 0.0070 O.H
Kepala Tukang Pipa 0.0230 O.H
Tukang Batu 0.2250 O.H
Pekerja Terampil 0.1350 O.H
Bahan :
Pipa GI Diameter 3" 1.2000 m1
Perlengkapan 0.3500 Harga Pipa

Jumlah
Overhead + Profit ( - % )
Nilai HSPK :
PEKERJAAN

Rp 85,000.00 Rp 34.00
Rp 75,000.00 Rp 52.50
Rp 75,000.00 Rp 525.00
Rp 65,000.00 Rp 455.00

Rp 10,500.00 Rp 11,025.00
Rp 19,000.00 Rp 285.00
umlah Rp 12,376.50
Overhead + Profit ( - % ) Rp 1,237.65
Nilai HSPK : Rp 13,614.15

Rp 85,000.00 Rp 34.00
Rp 75,000.00 Rp 52.50
Rp 75,000.00 Rp 525.00
Rp 65,000.00 Rp 455.00

Rp 10,750.00 Rp 11,287.50
Rp 19,000.00 Rp 285.00
umlah Rp 12,639.00
Overhead + Profit ( - % ) Rp 1,263.90
Nilai HSPK : Rp 13,902.90

Rp 85,000.00 Rp 255.00
Rp 75,000.00 Rp 472.50
Rp 75,000.00 Rp 4,725.00
Rp 65,000.00 Rp 1,300.00

Rp 58,000.00 Rp 5,800.00
Rp 10,000.00 Rp 500.00
Rp 5,000.00 Rp 2,500.00
Rp 130,000.00 Rp 61,100.00
Rp 21,000.00 Rp 210.00
umlah Rp 76,862.50
Overhead + Profit ( - % ) Rp 7,686.25
Nilai HSPK : Rp 84,548.75

Rp 85,000.00 Rp 255.00
Rp 75,000.00 Rp 450.00
Rp 65,000.00 Rp 3,250.00

Rp 15,000.00 Rp 15,000.00

umlah Rp 18,955.00
Overhead + Profit ( - % ) Rp 1,895.50
Nilai HSPK : Rp 20,850.50
Rp 85,000.00 Rp 595.00
Rp 75,000.00 Rp 1,725.00
Rp 85,000.00 Rp 19,125.00
Rp 75,000.00 Rp 10,125.00

Rp 200,000.00 Rp 240,000.00
Rp 15,000.00 Rp 5,250.00

umlah Rp 276,820.00
Overhead + Profit ( - % ) Rp 27,682.00
Nilai HSPK : Rp 304,502.00
HARGA DASAR SATUAN UPAH
HARGA
No. URAIAN KODE SATUAN SATUAN
( Rp.)

1. Pekerja (L01) Jam 9,285.71


2. Tukang (L02) Jam 10,714.29
3. Mandor (L03) Jam 12,142.86
4. Operator (L04) Jam 10,714.29
5. Pembantu Operator (L05) Jam 9,285.71
6. Sopir / Driver (L06) Jam 10,714.29
7. Pembantu Sopir / Driver (L07) Jam 9,285.71
8. Mekanik (L08) Jam 10,714.29
9. Pembantu Mekanik (L09) Jam 9,285.71
10. Kepala Tukang (L10) Jam 11,428.57

DAFTAR
HARGA DASAR SATUAN BAHAN

HARGA
No. URAIAN KODE SATUAN SATUAN
( Rp.)

1 Pasir Pasang (Sedang) M01b M3 260,000.00


2 Pasir Beton (Kasar) M01a M3 265,000.00
3 Pasir Halus (untuk HRS) M01c M3 260,000.00
4 Pasir Urug (ada unsur lempung) M01d M3 120,000.00
5 Batu Kali M02 M3 95,000.00
6 Agregat Kasar M03 M3 134,897.01
7 Agregat Halus M04 M3 134,897.01
8 Filler M05 Kg 1,890.00
9 Batu Belah M06 M3 175,000.00
10 Batu pecah 5/7 M07 M3 220,000.00
11 Bahan Tanah Timbunan M08 M3 20,700.00
12 Bahan Pilihan M09 M3 20,000.00
13 Aspal Bitumen M10a KG 12,250.00
14 Aspal M10 KG 12,000.00
15 Kerosen / Minyak Tanah M11 LITER 9,500.00
16 Semen / PC (50kg) M12 Zak 55,000.00
17 Semen / PC (kg) M12b Kg 1,100.00
18 Besi Beton Polos M13 Kg 10,500.00
19 Besi Beton Ulir M13.b Kg 10,750.00
20 Kawat Beton M14 Kg 19,000.00
21 Sirtu M16 M3 200,000.00
22 Cat Marka (Thermoplastic) M17b Kg 20,250.00
23 Paku M18 Kg 13,500.00
24 Kayu Perancah M19 M3 1,000,000.00
25 Bensin M20 LITER 11,800.00
26 Solar M21 LITER 11,400.00
27 Minyak Pelumas / Olie M22 LITER 36,000.00
28 Bahan Agr.Base Kelas A M26 M3 134,897.01
29 Thinner M33 LITER 11,500.00
30 Glass Bead M34 Kg 40,000.00
31 Trucuk Bambu (Dia 10 - 12 Cm x 6 M) M61 M 15,000.00
32 Elastomer jenis 3 M74c buah 850,000.00
33 Expansion Tipe Joint Asphaltic Plug M75d M 1,000,000.00
34 Expansion Join Baja Siku M75f M 275,000.00
35 Agregat Pecah Mesin 0-5 mm M91 M3 240,000.00
36 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 230,000.00
37 Agregat Pecah Mesin 20-30 mm M93 M3 210,000.00
38 Cat Tembok Dasar/Alkali Liter 58,000.00
39 Kuas Cat Buah 10,000.00
40 Kertas gosok Lembar 5,000.00
41 Cat Tembok Eksterior Khusus ( Dulux ) Kg 130,000.00
42 Rol Buah 21,000.00
RGA DASAR SATUAN UPAH

HARIAN
(OH) 7 Jam

65,000.00
75,000.00
85,000.00
75,000.00
65,000.00
75,000.00
65,000.00
75,000.00
65,000.00
80,000.00

DAFTAR
HARGA DASAR SATUAN BAHAN

KETERANGAN
Zona 1

Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Base Camp
Base Camp
Proses/Base Camp
Lokasi Pekerjaan
Base Camp
Borrow Pit/quarry
Quarry
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Pertamina
Pertamina
Pertamina
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi pekerjaan
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
TIME SCHIDULLE

Program Peningkatan Jalan dan Jembatan


Kegiatan Pembangunan Jembatan
Paket Pekerjaan Pelebaran Jembatan Jalinan
Panjang Ruas -
Penanganan (3.00 x 6.00) m2
Lokasi Kecamatan Dolopo
Sumber Dana Dana Alokasi Umum (DAU)
Tahun Anggaran 2018

Bobot
JANGKA WAKTU PELAKSANAAN ( 90 HARI ) KALENDER
%
No Uraian Pekerjaan Sat Volume BULAN 1 BULAN 2 BULAN 3

JML MINGGU 1 2 3 4 5 6 7 8 9 9 9 9
JML HARI 7 14 21 28 35 42 49 56 63 70 77 84

I DIVISI 1. UMUM
1 Mobilisasi Ls 1.00 1.189 0.594
II DIVISI 2. DRAINASE
1 Pasangan Batu Mortar m3 3.00 0.446
III DIVISI 3. PEKERJAAN TANAH
1 Galian Biasa m3 68.52 0.656 0.219 0.219 0.219
2 Timbunan pilihan m3 3.00 0.085 0.085
3 Timbunan biasa m3 12.70 0.276 0.276
IV DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
1 Beton mutu rendah dengan fc' = 10 Mpa (K-125) m3 13.20 2.704 1.352 1.352
V DIVISI 5. PERKERASAN BERBUTIR
VI DIVISI 6. PERKERASAN ASPAL
1 Lapis Pondasi Aggregat Kelas A m3 9.12 0.690 0.690
2 Lapis Resap Pengikat - Aspal Cair ltr 18.24 0.056 0.028 0.028
3 Lapis Perekat - Aspal Cair ltr 18.14 0.058
4 Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton 6.29 1.746 1.746
5 Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang) Ton 8.16 2.568
VII DIVISI 7. STRUKTUR
1 Pembesian dengan besi polos Kg 149.56 0.484 0.016 0.029 0.029 0.041 0.061 0.082 0.098 0.065 0.041 0.022
2 Pembesian dengan besi ulir Kg 17,897.68 59.158 2.000 3.500 3.500 5.000 7.500 10.000 12.000 8.000 5.000 2.658
3 Beton mutu sedang dengan fc' = 20 Mpa (K-250) m3 65.86 17.525 2.500 2.500 3.500 5.000 4.025
4 Beton mutu sedang dengan fc' = 30 Mpa (K-350) m3 15.31 5.172 2.500 2.672
5 Pengecatan Tembok Luar Baru 2 Lapis (Eksterior) m2 25.00 0.503
6 Pemasangan Sandaran Pipa Besi Galvanis Dia. 3" m2 12.40 0.898 0.898
7 Patok Pengarah bh 12.00 0.532
8 Elastomer bh 8.00 1.617 0.808 0.808
9 Expansion Tipe Joint Asphaltic Plug m1 12.00 2.853 2.000
10 Expansion Join Baja Siku m1 12.00 0.785 0.392 0.392

JUMLAH 100.000 0.813 2.235 3.529 3.529 5.849 10.870 12.582 15.598 13.676 13.310 7.783 4.672

JUMLAH KUMULATIF RENCANA - 0.81 3.05 6.58 10.11 15.95 26.82 39.41 55.00 68.68 81.99 89.77 94.45
TIME SCHIDULLE

JANGKA WAKTU PELAKSANAAN ( 90 HARI ) KALENDER

BULAN 3 BULAN 4 KETERANGAN

9 9 11 12 13
91 98 105 112 120

100

0.594
90
0.223 0.223

80

70

60

0.058 50

2.568
40

30

0.251 0.251

0.266 0.266
10
0.853

0
3.480 0.860 0.489 0.474 0.251

97.93 98.79 99.27 99.75 100.00

Madiun, 31 Juli 2018


CV. ADIYAN JAYA ABADI

SUPRIADI, SE
Direktur
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3

No. URAIAN KODE KOEFISIEN

I ASUMSI
1 Bahan dasar (Batu dan Pasir) diterima di lokasi Alat
Pemecah Batu (di Base Camp)
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Hasil produksi Alat Pemecah Batu : - Agregat Halus H 30.00
- Agregat Kasar K 70.00
4 Berat Isi Bahan : - Batu / Gravel D1 1.20
- Pasir D2 1.40
- Batu Pecah D3 1.35
5 Harga Satuan Bahan Dasar : - Batu Kali Rp1 95,000.00
- Pasir Rp2 260,000.00
6 Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) Rp3 285,105.67
- Wheel Loader Rp4 210,407.53
7 Kapasitas Alat : - Pemecah Batu (Stone Crusher) Cp1 50.00
- Wheel Loader Cp2 1.50
8 Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) Fa1 0.70
- Wheel Loader Fa2 0.83
9 Faktor Kehilangan Material Fh 1.10
10 Agregat Halus masih perlu dicampur dengan pasir

II METHODE PELAKSANAAN

1 Wheel Loader mengangkut batu/gravel dari tumpukan


dan menuangkannya ke Alat Pemecah Batu.

2 Batu/gravel dipecah dengan Alat Pemecah Batu


(Stone Crusher) sehingga menghasilkan Agregat Batu
Pecah Kasar dan Halus.

3 Agregat Halus dicampur dengan pasir menggunakan Loader

III PERHITUNGAN

III.1. HARGA SATUAN AGREGAT PRODUKSI ST. CRUSHER

1.a. Kerja Stone Crusher memecah gravel :


- Waktu kerja Stone Crusher Tst 1.00
- Produksi Stone Crusher 1 jam = (Fa1 x Cp1) : D3 Qb 25.93
- Kebutuhan batu/gravel 1 jam = (Fa1 x Cp1) : D1 Qg 29.17

1.b. Kerja Wheel Loader melayani Stone Crusher :


- Kap. Angkut / rit = (Fa2 x Cp2) Ka 1.25
- Waktu Siklus (Muat, Tuang, Tunggu, dll) Ts 2.00
- Waktu kerja W.Loader memasok gravel
= {(Qg : Ka) x Ts} : 60 menit Tw 0.78
1.c. Biaya Produksi Batu Pecah / M3
= {(Tst x Rp3) + (Tw x Rp4)} : Qb Bp 17,334.51

1.d. Harga Satuan Batu Pecah Produksi St.Crusher / M3


= {(Qg : Qb) x Fh x Rp1} + Bp HSb 134,897.01

ITEM PEMBAYARAN : AGREGAT KASAR & HALUS


JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3

No. URAIAN KODE KOEFISIEN

III.2. HARGA SATUAN AGREGAT PECAH MESIN 5-10 & 10-20 mm


( berlaku juga untuk Aggregat 20-30 mm)
Agregat Kasar Produksi Stone Crusher = 70% K 70.00
(Tertahan saringan # 4 = 4,75mm)
Harga Satuan Agregat Kasar / M3 = (K x HSb) / K HSAk 134,897.01

III.3. HARGA SATUAN AGREGAT PECAH MESIN 0-5 mm


(Agregat Halus)
3.a. Agregat Halus Produksi Stone Crusher = 30% H 30.00
Harga Agregat Halus Prod. Stone Crsh.= (H x HSb) / H Hs1 134,897.01
URAIAN ANALISA HARGA SATUAN

SATUAN KETERANGAN

%
%
Ton/M3 Berongga
Ton/M3 Berongga
Ton/M3 Berongga
Rp./M3
Rp./M3
Rp./Jam
Rp./Jam
Ton/Jam
M3 Kap. Bucket
-
-
-

Jam
M3/Jam Batu pecah
M3/Jam

M3
menit

Jam
Rp./M3

Rp./M3 195,390.00

Berlanjut

URAIAN ANALISA HARGA SATUAN


Lanjutan 1

SATUAN KETERANGAN

Rupiah Di Luar PPN

%
Rupiah per 1 M3
DAFTAR REKAPITULASI
HARGA SATUAN POKOK KEGIATAN TAHUN 2018
BIDANG KEBINAMARGAAN (ZONA 1)

KODE
NOMOR
REKENING

2 An. EI. 2.2

3 An. EI. 3.1.1

4 An. EI-3.2.1

5 An. EI-3.2.2

6 An. EI-4.2.1

7 An. EI-6.2.1
8 An. EI-6.2.1a

9 An. EI-6.3.3.a

10 An. EI-6.3.6.a

11 An. EI-7.1.5

12 An. EI-7.1.7
13 An. EI-8.4.5
14 24.03.01.14
15 24.03.01.15
16 24.07.05.13
17 24.07.04.10
DAFTAR REKAPITULASI
HARGA SATUAN POKOK KEGIATAN TAHUN 2018
BIDANG KEBINAMARGAAN (ZONA 1)

URAIAN KEGIATAN SATUAN

Pengadaan Agregat Kelas A m3

Pasangan Batu dengan Mortar m3

Galian tanah biasa m3

Timbunan Biasa m3

Timbunan Pilihan m3

Lapis Pondasi Agregat Kelas A m3

Lapis Resap Pengikat-Aspal Cair Liter


Lapis Resap Perekat-Aspal cair Liter

Lataston Lapis Aus Perata (HRS-WC) (Gradasi senjang/halus) Ton

Laston Lapis Antara Perata (AC-BC) (Gradasi halus/kasar) Ton

Beton Mutu sedang dengan Fc'=30 Mpa (K-350) m3

Beton Mutu sedang dengan Fc'=20 Mpa (K-250) m3


Patok Pengarah buah
Pembesian dengan besi polos Kg
Pembesian dengan besi Ulir Kg
Pengecatan tembok m2
Pengadaan dan Pemasangan Pipa GI Diameter 3" m1

Madiun, 26 Juli 2018


CV. ADIYAN JAYA ABADI

SUPRIADI, SE
Direktur
HARGA

SATUAN 2018

Rp 245,568.43

Rp 625,388.49

Rp 40,264.55

Rp 91,545.76

Rp 119,078.86

Rp 318,137.87

Rp 12,951.84
Rp 13,470.30

Rp 1,323,927.45

Rp 1,167,760.64

Rp 1,420,813.30

Rp 1,119,209.96
Rp 186,306.87
Rp 13,614.15
Rp 13,902.90
Rp 84,548.75
Rp 304,502.00

n, 26 Juli 2018
YAN JAYA ABADI

PRIADI, SE
Direktur
###

RENCANA ANGGARAN BIAYA


(RAB)
Program : Peningkatan Jalan dan Jembatan
Kegiatan : Pembangunan Jembatan
Paket Pekerjaan : Pembangunan / Penggantian Jembatan Cepit 2
Panjang Ruas : -
Penanganan : (6.00 x 5.00 x (-2.50) m
Lokasi : Kecamatan Dolopo
Sumber Dana : Dana Alokasi Umum (DAU)
Tahun Anggaran : 2018

Jumlah Harga
No. Divisi Uraian Pekerjaan
(Rupiah)

1 Umum 5,000,000.00
2 Drainase 1,876,165.47
3 Pekerjaan Tanah 4,278,794.57
4 Pelebaran Perkerasan dan Bahu Jalan 11,375,077.74
5 Pekerasan Berbutir -
6 Perkerasan Aspal 21,530,472.49
7 Struktur 376,554,833.10
8 Pengembalian Kondisi dan Pekerjaan Minor -
9 Pekerjaan Harian -
10 Pekerjaan Pemeliharaan Rutin -

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 420,615,343.37
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 42,061,534.34
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 462,676,877.71
(D) PEMBULATAN 462,676,000.00

===EMPAT RATUS ENAM PULUH DUA JUTA ENAM RATUS TUJUH PULUH ENAM RIBU
Terbilang :
RUPIAH==

Madiun, 26 Juli 2018


CV. ADIYAN JAYA ABADI

SUPRIADI, SE
Direktur
DAFTAR KUANTITAS DAN HARGA

Program : Peningkatan Jalan dan Jembatan


Kegiatan : Pembangunan Jembatan
Paket Pekerjaan : Pembangunan / Penggantian Jembatan Cepit 2
Panjang Ruas : -
Penanganan : (6.00 x 5.00 x (-2.50) m
Lokasi : Kecamatan Dolopo
Sumber Dana : Dana Alokasi Umum (DAU)
Tahun Anggaran : 2018

No. Mata Uraian Satuan Perkiraan Harga Jumlah


Pembayaran Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
a b c d e f = (d x e)

DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 5,000,000 5,000,000.00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 5,000,000.00

DIVISI 2. DRAINASE
An. EI-22 Pasangan Batu Mortar m3 3.00 625,388.49 1,876,165.47

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 1,876,165.47

DIVISI 3. PEKERJAAN TANAH


An. EI-311 Galian Biasa m3 68.52 40,264.55 2,758,926.87
An. EI-316 Timbunan pilihan M3 3.00 119,078.86 357,236.59
An. EI-315 Timbunan biasa M3 12.70 91,545.76 1,162,631.12

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 4,278,794.57

DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN


An. EI-7110 Beton mutu rendah dengan fc' = 10 Mpa (K-125) m3 13.20 861,748.31 11,375,077.74

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 11,375,077.74

DIVISI 5. PERKERASAN BERBUTIR

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

DIVISI 6. PERKERASAN ASPAL


An. EI-511 Lapis Pondasi Aggregat Kelas A m3 9.12 318,137.87 2,901,417.38
An. EI-611a Lapis Resap Pengikat - Aspal Cair Liter 18.24 12,951.84 236,241.49
An. EI-612a Lapis Perekat - Aspal Cair Liter 18.14 13,470.30 244,351.19
An. EI-636a Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton 6.29 1,167,760.64 7,345,214.44
An. EI-633a Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang) ton 8.16 1,323,927.45 10,803,248.00

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 21,530,472.49

DIVISI 7. STRUKTUR
24.03.01.14 Pembesian dengan besi polos Kg 149.56 13,614.15 2,036,132.27
24.03.01.15 Pembesian dengan besi ulir Kg 17,897.68 13,902.90 248,829,655.27
An. EI-717 Beton mutu sedang dengan fc' = 20 Mpa (K-250) m3 65.86 1,119,209.96 73,711,167.95
An. EI-715 Beton mutu sedang dengan fc' = 30 Mpa (K-350) m3 15.31 1,420,813.30 21,752,651.56
24.07.05.13 Pengecatan Tembok Luar Baru 2 Lapis (Eksterior) m2 25.00 84,548.75 2,113,718.75
24.07.04.10 Pemasangan Sandaran Pipa Besi Galvanis Dia. 3" m1 12.40 304,502.00 3,775,824.80
An. EI-845 Patok Pengarah Buah 12.00 186,306.87 2,235,682.50
Elastomer Buah 8.00 850,000.00 6,800,000.00
Expansion Tipe Joint Asphaltic Plug m' 12.00 1,000,000.00 12,000,000.00
Expansion Join Baja Siku m' 12.00 275,000.00 3,300,000.00
Expation Joint

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 376,554,833.10

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 9. PEKERJAAN HARIAN

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -

DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN

Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -