BUILDING OF RCC SEGMENTAL BOX OF SIZE 1x1.2 m x1.8 m
2 m cushionAT BR.NO. …….
ASSUMPTIONS AND CONDITIONS
1) Loading 25 TonLoading
2)Grade of concrete of MIX 35 N/mm^2
3)Grade of steel ( Fy) 500 N/mm^3
4)Number of Track 1
5)Centre to Centre distamce of Track(if more than one track) 5.300 M.
6)Box is continuous along the barrel length YES
7)Angle of internal friction 30
8)Density of soil 18 KN/m^3
9)Leg of stirrup=1. if Main bar spacing,s<151,4xs
2. if Main bar spacing,s>151,2xs
REFERENCES
1) Bridge Rule 1989
2) Concrete Bridge Code(2nd Revised) 1997
3) Reiforced Concrete Designer's Handbook 1988
By Charles E. Reynolds & James C. Steedman
BASIC INPUT DATA
Whether the box is skew No
If skew then mention the skew angle, else angle=0 0.000 RADIAN
Barrel Length 6.850 M.
Whether the box is segmental YES
Whether the box is cast-in-situ No
Thickness of slab 0.350 M.
Thickness of wall 0.350 M.
Clear span of slab 1.200 M.
Clear height of wall 1.800 M.
Overall span of slab 1.900 M
Effective span of the slab 1.550 M
Overall depth of the RCC Box 2.500 M
Effective height of the wall 2.150 M
Live load for B.M.(Characteristic load) 403.000 KN.
Live load for S.F.(Characteristic load) 405.000 KN.
Rail level 100.000 M.
Bed level 97.280 M
Top of top slab level 97.280 M.
Formation level 99.280 M.
Bottom of top slab level 96.930 M.
Top of bottom slab level 95.130 M.
Bottom of bottom slab level 94.780 M.
Cover to steel 50.000 mm. 20.000 MM
CHECK FOR THICKNESS OF SLAB/WALL
Thickness provided 0.350 m
Minimum Thickness required 0.163 m
O.K.
NOTE-
MIN. DEPTH REQUIRED BY 2 M CUSHION IS LESS THAN 0 M CUSHION
SO THAT WE CAN SAY THAT 0 M CUSHION IS MORE CRITICAL THAN
2 M CUSHION.
638725595.xls
2
638725595.xls
3
CALCULATION OF CDA
0.32 m
Earth cushion Formation level - Top of top slab level
2.00 m
DISPERSION LENGTH
NOTE-
DESPERSION LENGTH IN 2 M CUSHION IS MORE THAN 0 M CUSHION
SO THAT WE CAN SAY THAT 0 M CUSHION IS MORE CRITICAL THAN
2 M CUSHION.
638725595.xls
4
ACR = 50
CNOM = 50
H = 350.000
ES = 200000
EC = 29580.398915
M = 6.7612340378
AST = 4018
d = 290
DC = 101.26496402
Ixx = 1313844145.2
TOTMOM = 27233966.285
STRESS = 26.45120996
STRAINST = 0.000132256
STRAINOUT1 = 0.000174301
MOMLIVE = 5439061.606
MOMPERM = 7240833.6391
bt = 1000
em -0.0004484829
=
-0.0004484829
Des.Crack width= -0.067272441
638725595.xls
5
LOAD CALCULATION
CALCULATION OF LOADS
Dead load
i)Slab weight = 8.750 KN/metre width
ii)Ballast weight= 6.080 KN/metre width
iii)Earth fill= 36.000 KN/metre width
iv)Track weight= 3.554 KN/metre width
28.800
Equilant ht of surcharge due to dead load= -------------------- 0.301 m
(3+ total cushion)*18
638725595.xls
6
= 1.387
Moment from dead load
638725595.xls
7
638725595.xls
8
638725595.xls
9
638725595.xls
10
Condition 3 DL+LL
Mcd= (DL+WL+LL)X(Eff.Span of slab)^2 FEM
8.000
= 51.006 KN-M/Metre width
ABS. MAX. DESIGN SAGGING B.M. AT BOTTOM SLAB Mcd= 51.006 KN-M/Metre width
AxY^2+BxY+C=0
Where A= 10.200
B= 57.033
C= -74.366
Y= 1.091
Macy= Reaction at top due EP With LL Surcharge x Y-
EP at top x Y^2/2- EP x Y^3/3 - FEM
Macy= 20.150 KN-M/Metre width
638725595.xls
11
638725595.xls
12
DEPTH
DESIGN CONSTANT
638725595.xls
13
Bar type Diameter of bars Spacing of bars Area of r/f per m run
a-1 10.0 mm dia 200.0 mm c/c 392.7
a-2 10.0 mm dia 200.0 mm c/c 392.7
Total area of r/f per m run in mm2 785.4
Bar type Diameter of bars Spacing of bars Area of r/f per m run
a-1 10.0 mm dia 200.0 mm c/c 392.7
c 10.0 mm dia 200.0 mm c/c 392.7
Total area of r/f per m run in mm2 785.4
Bar type Diameter of bars Spacing of bars Area of r/f per m run
b 12.0 mm dia 100.0 mm c/c 1131.0
0.0 mm dia 200.0 mm c/c 0.0
Total area of r/f per m run in mm2 1131.0
638725595.xls
14
Bar type Diameter of bars Spacing of bars Area of r/f per m run
d 12.0 mm dia 100.0 mm c/c 1131.0
0.0 mm dia 200.0 mm c/c 0.0
Total area of r/f per m run in mm2 1131.0
For Wall
35*1000*290*(1-sqrt(1-((5.06*30.48*10^6)/(35*1000*290^2))))/(2.2*500)
Fck*b*d(1-sqrt(1-(5.06Mumax/Fck*b*d*d)))
2.2*Fy
Minimum area of steel required = 245.0 sq.mm
Absolute minimum area of steel required = 700.0 sq.mm
Bar type Diameter of bars Spacing of bars Area of r/f per m run
e 12.0 mm dia 100.0 mm c/c 1131.0
0.0 mm dia 200.0 mm c/c 0.0
Total area of r/f per m run in mm2 1131.0
Distribution steel
638725595.xls
15
% of Steel = 0.20 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
Per.shear stress(.25) 0.21 0.23 0.31 0.36 0.40 0.44 0.46 0.49 0.51 0.53 0.55 0.56
% of Steel = 0.20 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
.Per shear stress(.30) 0.21 0.23 0.31 0.37 0.41 0.45 0.48 0.50 0.53 0.55 0.57 0.58
% of Steel = 0.20 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
Per shear stress(35)= 0.21 0.23 0.31 0.37 0.42 0.40 0.49 0.52 0.54 0.56 0.58 0.60
% of Steel = 0.20 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
Per. shear stress(40) 0.21 0.23 0.32 0.38 0.42 0.46 0.49 0.52 0.55 0.57 0.60 0.62
Haunch bars
Bar type Ast required diameter required spacing provided diameter provided Ast provided
f-1 & f-2 350 10.6526863128236 200 12 565.486677646
638725595.xls
17
3.00
0.57
3.00
0.60
3.00
0.62
3.00
0.63
638725595.xls
18
Ast provided
565.486677646
638725595.xls