This document outlines the work breakdown structure (WBS) for bridge construction activities including piling works, excavation, soil replacement, plain concrete works, pile caps works, filling works, reinforced concrete columns works, and reinforced concrete super structure works. Each higher level work package (WBS) is broken down into specific activities needed for completion.
This document outlines the work breakdown structure (WBS) for bridge construction activities including piling works, excavation, soil replacement, plain concrete works, pile caps works, filling works, reinforced concrete columns works, and reinforced concrete super structure works. Each higher level work package (WBS) is broken down into specific activities needed for completion.
This document outlines the work breakdown structure (WBS) for bridge construction activities including piling works, excavation, soil replacement, plain concrete works, pile caps works, filling works, reinforced concrete columns works, and reinforced concrete super structure works. Each higher level work package (WBS) is broken down into specific activities needed for completion.