Name of Structure Module / Stick built designation

Radiant Section Stick Built


SS Sleeves Stick Built
Radiant Platform Module
Penthouse Stick Built

Stairtower Stick Built


WHRU Platforms Stick Built
Interconnecting stair between Reformer & Steam Drum Platform and GHR Stick Built
Steam Drum Stick Built
Structure
WHRU Module Module
Grating Stick Built
Handrail Stick Built
Ladder Stick Built
CS Ducts Stick Built
SS Ducts Stick Built
Stack Stick Built
Transition duct Stick Built
Suction Tower Stick Built
Circular Platform Stick Built
Field Support & Misc.Structural items Stick Built

Anchor Bolts
Lifting Steel Stick Built
Connection Bolts
Cable Tray Support Stick Built
Stack Template Stick Built
Penthouse Sheeting
Rain Water Gutter &
downpipe

Penthouse Doors
Total Weight in
Tons

168
11
33
145
22
8
13

81

100
33
16
10
48
76
72
32
7
10

10
8
7
3
4
1300 sq.m

350 RM

5 Nos