You are on page 1of 1

Municipal Corporation of Greater Mumbai

(Hydraulic Engineer's Department)


E.E.Mtr (Rev.)/ 129/ SR dt. 19.06.2018
Revised Water Tanker Charges w.e.f. 16.06.2018
Tanker Charges For water tanker capacity of 12000 liters

Sewerage
Tanker Filling
Water Charges Charges at 70% Total
Water Charges ₹ Charges For
W.C. Rule Rate of water Charges
F.Y. 2018-2019
Charges
₹ Per KL ₹ ₹ ₹ ₹
1 2 3=2*(12000/1000) 4=3*70% 5 6=3+4+5

1.01 (2.1), (3),(5) & 3.82 46 32 130 208


1.01A
1.01(2) & 1.01A (1) 4.23 51 36 130 216
1.1 5.09 61 43 130 234
1.2 20.4 245 171 130 546
1.4 38.25 459 321 130 910
1.5 50.99 612 428 130 1170
1.6 76.49 918 643 130 1690
6.2.4 (Under 1.01A) 7.64 92 64 130 286
6.2.4 (Under 1.1) 10.2 122 86 130 338
6.2.4 (Under 1.2) 40.79 489 343 130 962
6.2.4 (Under1.4) 76.49 918 643 130 1690
6.2.4 (Under 1.5) 102 1224 857 130 2211
6.2.4 (Under 1.6) 152.99 1836 1285 130 3251

Tanker Charges For water tanker capacity of 10000 liters


Sewerage
Tanker Filling
Water Charges Charges at 70% Total
Water Charges ₹ Charges For
W.C. Rule Rate of water Charges
F.Y. 2018-2019
Charges
₹ Per KL ₹ ₹ ₹ ₹
1 2 3=2*(10000/1000) 4=3*70% 5 6=3+4+5
1.01 (2.1), (3),(5) &
3.82 38 27 130 195
1.01A
1.01(2) & 1.01A (1) 4.23 42 30 130 202
1.1 5.09 51 36 130 217
1.2 20.4 204 143 130 477
1.4 38.25 383 268 130 780
1.5 50.99 510 357 130 997
1.6 76.49 765 535 130 1430
6.2.4 (Under 1.01A) 7.64 76 53 130 260
6.2.4 (Under 1.1) 10.2 102 71 130 303
6.2.4 (Under 1.2) 40.79 408 286 130 823
6.2.4 (Under1.4) 76.49 765 535 130 1430
6.2.4 (Under 1.5) 102 1020 714 130 1864
6.2.4 (Under 1.6) 152.99 1530 1071 130 2731

sd/- sd/-
E.E.Meters(Rev.) Dy.HE(P&C)

You might also like