You are on page 1of 2
PRODUCT QUALITY PLAN IDENTIFICATION CODE : PQP - PS/API, Rev. 0 Grant Prideco | NOY \Vallourec Drilling Oil Equipments Manufacturing LLC f———— P.0 Box : 9709, Abu Dhabi CUSTOMER : GASOS/NDC United Arab Emirates REF NUMBER : MF-49698 PO # 2018-PO00653/MS. QUOTE NO. : QT 2018-20214 Rev-0 PRODUCT QUALITY PLAN (Pump-in Subs) | APPLICABLE STANDARD: |API SPEC 7-1/ISO 10424-1 FIRST EDITION MARCH 2006 + ADDENDUM 1 MARCH 2007 + | ADDENDUM 2, AUGUST 2009 + ADDENDUM 3, APRIL 2011. API SPEC 7-2/1SO 10424-2: 2007, SECOND EDITION, JANUARY 2017, EFFECTIVE DATE 6" JUNE 2017. CONTENTS 1) Product details Item#33 (22.3.23): 6 5/8" Straight Pump in sub, 2 Nos ‘Straight Pump in Subs, Top Connection 1502 Female Weco, 6 5/8" OD x 2" ID, Bottom Connection GRANT PRIDECO Express VX54 Pin, 6 5/8" OD x 4" ID, Integral Type, 18” Sh to Sh Length. Item#49 (2.3.39): 6 1/2” Straight Pump in sub, 2 Nos Straight Pump in Subs, Top Connection 1502 Female Weco, 6 1/2" OD x 2" ID, Bottom Connection GRANT PRIDECO Express VX50 Pin, 6 1/2" OD x 3 1/2" ID, Integral Type, 18" Sh to Sh Length. 2) Products Quality Plan PQP - PS/API, Rev. 0 = — Preparedby: Reviewed by : Approved by QA/QC Supervisor Product Specialist. ASE Manaeer Date: Date: Signature: Signature: Signature: £ vot! geen [Lo boone POPPSAR | Revsonteo Ltt Grant Prideco| NY ‘i bot f Order Reference: PO # 2018-PO00653/MS op | operation —_| sPEciFICATiON SPECIFICATION AND RECORD N PROCEDURE ACCEPTANCE CRITERIA REPORT | vooeM| TP1 Hardness: Minimum valuo: 205 HB Maximum valve: 340 HB Impact test Temperature: 20°C STEEL MAKING Round Sem | API 7- Minn vale: 3 we | ow Yield strength: 1 AISI 414541 idstens Ultimate tensilstrenath 140 Ks! Elongation: “mini Work Instruction |As per Manufacturing Drawing & Work | ¢ ang. 2 Boring WIBHA-O1 - /Instruction FowsPs | M Outside diameter | Manufacturing | Dimensions meeting Manufacturing 3 | turing operation | Drawing | Drawing FOusPs | M GRANT PRIDECO EXPRESS VX50, Novep _ |GRANT PRIDECO EXPRESS Vx64 6 | Threadin Fomsinver | H 8 specifications | Thread details drawing, gauging in accordance with thread connection ype 2 WECO Female | Manufacturing 5 = SeS | Threads deals as per Drawing FoMs-ps | H Threads —_| Work instruction |As per requirements of Work Instruction | © | Phosphating | WIBHA-14 _ |for Phosphating FomseL | M ‘PITA Clause 7.108 7 Marking Tanstecidans |Marking 2s per NOV GP Specticatons | F-ams-ps | M Drawing in Manufacturing | Dimensions as per API 7-18 8 | Finalinspection | Magwacinng |irversions 2s pe Ae Faws.ik | H Certificate of Conformity , 7 Tally Sheet Quality a | Pocuneniaton Faw mater certfeae Dosimertato | Make and Break certificate (If applicable) | n Package Doc No. POP-PS/API L Revision No: 0 Page 30f4

You might also like