This checklist is for laying a new pipeline and pressure testing it. It contains 15 items to check such as completing pipe installation, preparing testing equipment, filling the pipe with water, performing a 1 hour pressure test at 1.05 MN/m2, performing a 24 hour leakage test, and verifying tests are done according to standards. The name of the supervisor, inspector, and date must be recorded.
This checklist is for laying a new pipeline and pressure testing it. It contains 15 items to check such as completing pipe installation, preparing testing equipment, filling the pipe with water, performing a 1 hour pressure test at 1.05 MN/m2, performing a 24 hour leakage test, and verifying tests are done according to standards. The name of the supervisor, inspector, and date must be recorded.
This checklist is for laying a new pipeline and pressure testing it. It contains 15 items to check such as completing pipe installation, preparing testing equipment, filling the pipe with water, performing a 1 hour pressure test at 1.05 MN/m2, performing a 24 hour leakage test, and verifying tests are done according to standards. The name of the supervisor, inspector, and date must be recorded.
Laying New Pipeline - Pressure Test CHECKLIST 2210
Project
NO. STANDARD CHECK REMARKS
1 All pipe installation works completed and inspected by OIC Y N NA 2 Method statement, calibration report of pressure gauge, testing Y N NA equipment submitted to and approved by OIC 3 All necessary equipment, power, personnel, hand pumps, water Y N NA and other materials are ready for the satisfactory testing of the section of the pipeline 4 Adequate quantity of potable water (clean water) available for Y N NA testing works at site 5 Enough backfilling, trust blocks/anchor blocks provided at all the Y N NA necessary locations to hold the pipe 6 Sections or lengths of the pipe do not exceed 500m or shorter Y N NA length as directed by OIC 7 Both ends of the pipe properly capped with pressure gauge Y N NA installed properly 8 Length under test filled with clean water from the lowest point in Y N NA order to ensure the complete elimination of air. Air has been fully expelled 9 Pipeline pressure test with the potable water to a pressure of Y N NA 1.05 MN/m2 (150 psi) or specified. Pressure maintained for one (1) hour without any drop 10 Leakage test carried out for 24 hours and reading taken at every Y N NA 30 minutes or as specified 11 Calculated pressure drop (leakage) is within allowable limit and Y N NA approved 12 All pipelines tested for pressure and leakage test before the final Y N NA connection 13 All valves, fire hydrants, air valves, connections, overcrossings Y N NA and specials observed for any leaks 14 Both pressure and leak test carried out and recorded as per Y N NA standard procedure/specification 15 Pipe pressured as per the requirements and witnessed by Water Y N NA Services Control Unit (WSCU), DWS, PWD