1. Confirm off site or factory pressure tests have been completed and
certification is available. If yes confirm details on vessel/tank plate are stamped
to reflect the completion of the pressure test. If the pressure test is complete and
acceptable there is no requirement to further pressure test on site.
. 2
C0M-14 Rev. 0 Page 1 of 3
C0-M PRECOMMISSIONING OF MECHANICAL EQUIPMENT
Inspected Inspected
Inspection check list N/A by by
Contractor Engineer
9. Pressure Test:
Using the relevant project specification, pressurise the tank/vessel and record
the relevant data.
10. RECORD:
Start time: Start date: Start
temp;
End time: End date: End
temp:
12 On Completion ensure:
Tank/ Vessel is drained and dried
All instruments, equipment and valves re-installed
All re-installed instruments, equipment and valve connections have
gaskets and seals fitted and all flange bolts tight.
13. Safety Signs/ tape removed
14. Punch List completed
NOTE:
. 2
C0M-14 Rev. 0 Page 2 of 3
C0-M PRECOMMISSIONING OF MECHANICAL EQUIPMENT
Inspected Inspected
Inspection check list N/A by by
Contractor Engineer
This test assumes no factory pressure test has been performed. If a factory or off-
site pressure test has been performed, the test certificate must be attached to this
test report and conformation stamp verified.