PROCEDURE FOR
NSC/PIUL/PRO-0023 PNEUMATIC TEST OF A2
RF PAD
TABLE OF CONTENTS
SL. NO DESCRIPTION PAGE NO.
1.0 SCOPE ……………………………………......01
1.0 SCOPE:
The objective of the pneumatic pressure testing is to locate leaks in the welds of the Nozzle
reinforcement pad to Vessel/equipment.
2.0 PURPOSE:
The purpose of this procedure is provide a guide line to carry out the Pneumatic pressure test to check
soundness of welds of the Nozzle reinforcement pad to shell plate.
1. Approved Drawings/ITP
2. Job Specification
4.0 EQUIPMENT
4.1. The test scheme shall have suitable connections, necessary valve and calibrated pressure gauge.
The gauge shall have a range of min 1.5 times to max 4.0 times of the test pressure.
4.2. An air pressure can be created by any convenient method, such as air compressor or any other
facility available in Premises.
4.3. The test medium will normally be air.
4.4. Verification of calibration record of test & measurement equipment to be verified during
Inspection.
5.0 PERSONAL:
The personnel shall be competent and have thorough knowledge in performing this method.
The surface to be examined and the adjacent area within at least 1" shall be cleaned thoroughly, must
be dry and free from dirt, oil, grease, scale, welding flux, spatters, paint and other foreign matter that
could obstruct surface openings or otherwise interfere with the examination. Prior to pneumatic
pressure testing, joint shall be checked visually.
The temperature of the surface to be examined shall not be below 5°C Nor above 50°C.
Document Number Document Title Rev.
PROCEDURE FOR
NSC/PIUL/PRO-0023 PNEUMATIC TEST OF A2
RF PAD
8.0 PROCEDURE:
The presence of continuous bubble growth on the surface of the material indicates leakage
through an orifice passages in the region under examination.
A minimum light intensity of 1000 lux is required for conducting the examination.
10.0 REPIAR/RETEST:
If any defect noticed. Repair the Defective weld and repeat the test till entire satisfaction.
11.0 CLEANING:
After test the area shall be thoroughly cleaned for the further activities.
13. SAFETY:
The area under test is acceptable when no continuous bubble formation is observed.
Document Number Document Title Rev.
PROCEDURE FOR
NSC/PIUL/PRO-0023 PNEUMATIC TEST OF A2
RF PAD
Date:
Inspection Details:
RESULT:
Remarks:
Name
Signature
Date