Professional Documents
Culture Documents
2. Technical Specification.
3. Plan of mooring and see trials.
4. Light ship mass Distribution.
5. Longitudinal and Transverse sections.
6. Shell expansion.
7. Deck construction.
8. Bottom and stern frame construction.
9. bulkheads
10. Construction of deck House.
11. Main and auxiliary engines foundations.
12. Zone strength analysis.
13. Calculations of equipment no.
14. Emergency towing booklet.
15. Navigation Bridge Visibility plan.
16. The ship .structure access Manuel.
17. Calculation of accidental oil discharge.
18. Anchor and mooring equipment.
19. Closing appliances and height of sills of openings in hull
and superstructures.
20. Guard rail.
21. Rudder stock, rudder blade, bearings and steering peer.
22. Structure Fire protection plan.
23. Plan of Insulation.
24. Plan of Lining and ceilings.
25. Plan of Floor Lining.
26. Escape routes.
27. Design of typical penetrations of piping, cables and
ventilation ducts.
28. Plan of tanks
29. body lines.
30. Protocol of Inclining test.
31. Information on freeboard (for Information).
32. Damage stability.
33. Information on stability, Maximum cargo density (t/m3).
34. Welding Table.
35. Welding Procedure Specification.
36. Plan 0f cathode protection.
37. Arrangement of machinery.
38. Diagram and specification of remote control of main machinery.
39. Drawings of seating the main engines and gearboxes on foundation;
40. Drawings or seating generator sets on the foundation;
41. Shafting;
42. general arrangement plan.
43. drawings of stern tube and attached parts.
44. Drawings of shaft.
68. Principle diagrams and a general view of the mar and emergency switchboards,
ships navigation and control console.
69. Calculation results of electric power plant output necessary to provide
operation of the ship.
70. all conditions, as well as selection of the number end power of generators
(electrical energy balance).
71. Diagrams of internal communication and signaling (general alarm system, public
address system, fire detection system, etc).
72. Principle diagram of cable passages with indication of compartment through
which they pass.
73. Result of capacity calculations of emulator batteries.
74. Arrangement plans of main and emergency generators, main and emergency switch
boards.
75. Accumulator batteries. Other essential electrical equipment.
76. List of alarm points and safety system functions, automaton functions. etc.
77. Block diagram, functional and electrical diagrams of automation system.
Propulsion Control system. etc.
78. Fire control and Safety.
79. Lifesaving and Safety Plan.
80. Evacuation plan.