RK associates civil work bill 3 RBD site

Slno Description of work unit Nos length Btreadth Qnty


1 3rd floor 100mm floor chipping sqm 1 8.15 6.18 50.367
3rd floor floor less sqm -1 0.6 1.8 -1.08
-1 4.45 0.62 -2.759
-1 0.6 1.8 -1.08
2 100mm floor chipping sqm 1 8.15 5.55 45.2325
other side reception sqm -1 0.6 1.8 -1.08
1 1.32 0.6 0.792
-1 0.6 1.8 -1.08
3 Near pantry area floor chipping 30 mm sqm 1 1.4 1.8 2.52
91.8325

1 50mm thick pcc sqm 1 8.15 6.178 50.3507


floor less sqm -1 0.6 1.8 -1.08
sqm -1 4.45 0.62 -2.759
sqm -1 0.6 1.8 -1.08
2 50mm thick pcc sqm 1 8.15 5.55 45.2325
sqm 1 1.32 0.6 0.792
other side reception sqm -1 0.6 1.8 -1.08
-1 0.6 1.8 -1.08
Near pantry area floor chipping sqm 1 1.4 1.8 2.52
91.8162

1 Block work 200mm sqm 1 2.74 3.75 10.275


Door less sqm -1 1.814 2.43 -4.40802
Lintel less sqm -1 2.1 0.3 -0.63
2 wall2 sqm 2 0.69 3.75 5.175
3 3rd flooor Ahu1 closing sqm 1 6.56 1.1 7.216
sqm -2 1 0.3 -0.6
sqm -2 1 0.3 -0.6
sqm -2 1 0.3 -0.6
sqm -2 1 0.3 -0.6
other side closing sqm 1 6.55 1.1 7.205
Ahu 2 closing sqm 1 6.56 1.1 7.216
other side closing sqm 1 6.52 1.1 7.172
4 Hub room block work sqm 1 5.94 0.8 4.752
Hub rooom 2 sqm 1 5.6 1.2 6.72
48.29298

1 Plastering at 2nd floor outer side sqm 1 2.74 3.75 10.275


Door less sqm -1 1.81 2.43 -4.3983
2 Plaster wall2 sqm 1 0.89 3.754 3.34106
sqm -2 1.1 0.3 -0.66
3 inner side plaster 3 sqm 2 0.89 3.754 6.68212
4 sqm 1 1.804 3.754 6.772216
Door less sqm -1 1.804 2.43 -4.38372
5 3rd floor Ahu 1 plaster sqm 2 6.558 1.1 14.4276
sqm -4 1 0.3 -1.2
sqm -4 1 0.3 -1.2
sqm -4 1 0.3 -1.2
sqm -4 1 0.3 -1.2
2nd side sqm 2 6.55 1.1 14.41
6 Ahu 2 plaster sqm 2 6.56 1.1 14.432
2nd side sqm 2 6.516 1.1 14.3352
7 Hub room 1 sqm 1 5.94 0.8 4.752
3rd floor sqm 1 5.94 1 5.94
Hub room 2 sqm 2 5.6 1.2 13.44
Floor plastering for smooth finish 25mm sqm 1 5.38 5.31 28.5678
wall less sqm -1 2.3 0.91 -2.093
-1 2.3 0.92 -2.116
sqm 118.924

NMR WORK Mason Helper


NMR work at balcony door plastering nos 2 2
Nmr work at 2nd floor packing by ansari nos 1 1
Nmr work for floor level bull marking nos 1
at autodesk site 6-11-22 nos 3 3
OT work Sunday nos 1.5 1.5
11/7/2022 nos 3 2
Ot work from 9am to 9 pm nos 1.5 1
nos 13 10.5

Slno Irem description qnty rate amount


1 Mason 13 1000 13000
2 Helper 10.5 700 7350
20350