Project Name : MBO-EPMS

Project ID :

Version Date Author

0.1 1/9/2023 Manjula B


Details

Test Case creation


Project Name: MBO-EPMS

Module/Package Name: Production Order

Author: Manjula B

Date: 1/9/2023

Test Case No. Test Case Description

Create Anken and Production Order

TC-001 Verify the functionality of LogIn


screen as Admin

TC-002 Verify Anken menu

TC-003 Verify 'New' Anken creation

TC-004 Verify 'Create Production Order'

TL Login and TL Assignment

TC-005 Verify PO in 'TL' login

TC-006 Verify created PO in TL login


TC-007 Verify TL Assignment

TC-008 Verify TL Assignment window

TC-009 Verify PO files in TL login

TC-010 Verify files assignment to Operator

TC-011 Verify Operator Assignment

TC-012 Verify QC Assignment

Verify Change QC for Production


TC-013
Order window

Operator Files and Operator Tracker Flow

TC-014 Verify Files in Operator login

TC-015 Verify assigned Files

TC-016 Verify Open Files in PhotoShop

TC-017 Verify Operator Tracker login

TC-018 Verify Get Files in Tracker

TC-019 Verify Files in Photoshop

QC Files and QC Tracker Flow

TC-020 Verify Files in QC login

TC-021 Verify QC assigned Files

TC-022 Verify QC Tracker login

TC-023 Verify QC Get Files in Tracker


TC-024 Verify QC Files in Photoshop

TC-025 Verify QC Check

TC-026 Verify QC Check window


UNIT

MS

on Order

Details Of Operation

1. Enter valid Username and Password


2. Click 'Log In to Sandbox' button

Click 'Anken' menu

1. Click 'New' button


2. In Anken Edit screen
- Enter Anken creation details.
3. Click 'Save' Button

1. Click 'Create a Production Order' Button


2. In Production Order creatation window
- Selecte Loaction and Status 'New'
- Click 'Create Production Order' Button

Login as TL

1. Click Production Oder menu


2. Check created PO number is the list of
PO
1. Selecte the PO
2. Click 'Change TL Incharge' button
1. Select Shift, Team and TL Name (Assign
themself or to other TL)
2. Click 'Submit' button
Assigned TL Login
1. Click Files menu
1. Select the files
2. Click 'Assign Operator' button

1. Select Shift, Team and Operator Name


2. Click 'Save' button

(After Operator Works)


1. Select PO that Operator worked
2. Click 'Change QC Incharge' button

1. Select Shift, Team and QC Name


2. Click Submit

Login as Operator

Click 'Files' menu


1. Select Files need to work in Tracker
2. Click 'Open Files in Photeshop' button
1. Open Tracker
2. Login as Operator
1. Click Get Files in Tracker

1. Click Start Work


2. Work on Images
3. Click End Work
(For All images)

Login as QC

Click 'Files' menu


1. Open Tracker
2. Login as QC
1. Click QC Get Files in Tracker
1. Check the work for that file
2. Click OK
1. Select PO of QCIP files
2. Click 'QC Check' button
1. Select the files
2. Click 'Approve' button
UNIT/INTEGRATION TEST PLAN

Expected Value

Admin should be able to login successfully


-> Should display Home screen

Recent Anken list should be dis played

Anken Edit screen should be diaplayed


- Should be able to enter the details
- New Anken should be created
- New Anken Number should be generated

Production Order should be created for that Anken


- Production Order number should be generated for that
location
- PO should be in New status

TL login 'Home' page should be displayed

Created PO should be displayed in the list


- Status should be as New
Change TL for Production Order window should be displayed

PO should be assigned to the selected TL


PO Status should be changed to 'Assigned'

All files of that assigned PO should be displayed


- Files should be displayed in New status
Operator Assignment window should be displayed with
default value of shift and team of the current login user

Files should be assigned to selected Operator.


Files status should be changed to 'Assigned'

Change QC for Production Order window should be displayed

PO should be assigned to the selected QC

Operator login 'Home' page should be displayed

Assigned Files should be displayed with assigned status

Selected Files should be ready to open in Photoshop

Tracked should be logged in and should display Get the files

Selected Files should be Open in Photoshop

Files displayed in Photoshop should be able to Work on


Images

QC login 'Home' page should be displayed

QC Assigned Files should be displayed

Tracked should be logged in and should display Get the files

QC Files should be Open in Photoshop


Files displayed in Photoshop should be Ok and status will be
updated as QCIP

QC Check window should be displayed

Files should be Approved


UNIT/INTEGRATION TEST PLAN

Verification Environment1
System Configuration:

Operating System:

Browser:

Simulator:

Others :

1st round
Actual Value Date of
Name of the Tester
Testing

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023
Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023
Manjula B 1/9/2023

Manjula B 1/9/2023

Manjula B 1/9/2023
1st round 2nd round
Judgment Name of the Tester Date of Testing
(PASS/FAIL)

Pass

Pass

Pass

Pass

Pass

Pass
Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass
Pass

Pass

Pass
3rd round
Judgment Name of the Date of Testing Judgment
(PASS/FAIL) Tester (PASS/FAIL)
TC-001

TC-002
TC-003

TC-004
TC-005

TC-006
TC-007

TC-008
TC-009

TC-010

TC-011
TC-012

TC-013
TC-014

TC-015
TC-016

TC-017
TC-018

TC-019
TC-020

TC-021

TC-022
TC-023

TC-024
TC-025

TC-026

You might also like