You are on page 1of 15

Garment & Textile

Industry

May 2020 Department of Industrial Policy & Investment Promotion


Government of Madhya Pradesh
Madhya Pradesh: The Growth Centre of India
Huge Market Rich in Minerals Industry Ready Achievements

Clearance in 15
Only 2,30,000 KMs 4th Rank
Diamond producing state days
2nd of India
of road network Public Service Guarantee
in EoDB 2019

Largest Act
Indian State (by Area)

with Abundant Skilled


24,000 MW
77 Asia’s thickest Manpower
Million population coal seam (135m.) Installed power capacity More than 2 lakh 97% in IPA Rating 2019
coalfield (Also, exclusive DisCom technical professionals
for Mohasa Babai IA) pass out every year

Major producer of Coal,


~50% Limestone, Copper, Rock 900 MCM Indore Cleanest City
India’s population phosphate, Manganese, river Narmada water
120,000 Acre of India for 4th
captured through Dolomite, Glass Sand & Total Land Bank
reserved for Industry consecutive year
adjoining states pyrophyllite
2
Access to huge market
► 50% India’s population captured through adjoining
states
HP
Punjab
UK
► 24 Hours Max Time required to reach any corner HR
of India by road
Raj. UP
BR

JH WB
MP
► 100 Mins flight time to reach major cities Kandla Port CG
(Mumbai, Delhi, Pune, Hyderabad) Distance: 650 KM OR
Paradip Port
MH AP Distance: 1,000 KM
Telangana
JNPT Port
► Centrally Located both E-W and N-S corridor Distance: 600 KM
`
Vishakhapatnam Port
crosses state (621 Kms.) Distance: 1,200 KM

06 Hours

► 6 Inland Container Depots Malanpur (Gwalior), 09 Hours


Mandideep (Bhopal), Pawarkheda (Itarsi),
Pithampur, Tihi, Dhannad (Indore) 12 Hours
Map is representative only and not to scale.
Strategic location
Towards Delhi, Noida, Gurgaon, Amritsar

New Delhi-Mumbai
Expressway North-South
Industrial corridors planned Corridor
✓ Atal Pragati Path (Chambal Expressway)
▪ Connecting Sheopur, Morena and Bhind district
✓ Narmada Expressway East-West
▪ Connecting Eastern MP with Western MP Corridor
covering 13 districts
✓ Delhi- Nagpur Expressway
▪ Approved by NICDC; Significant portion of
the corridor will pass through MP
Agra-Mumbai
Road
Towards Mumbai, Pune,
Ahmedabad, Surat
Towards Chennai, Hyderabad, Bengaluru
Note: Map is representative only and
not to scale.

Companies can serve most of India from a single location


Madhya Pradesh’s prominent Industrial areas
Pithampur, Dhar Indore – Pithampur Economic Corridor Dewas Investment Region
Total Area: 2806
Total Area : 1640 Ha Total Area: 1322 Ha
Ha Available Area:
167 Ha Malanpur, Gwalior Industrial Area
ICD Facility: Pithampur, Dhannad Total Area: 1312.1 Ha
and Tihi (within 20 KM) Available Area: 165.2 Ha Electronics and Engineering
Gwalior
ICD Facility: Malanpur sector in Gwalior Region

Khajuraho
IT, Pharma and Auto sector
around Indore Region Satpura Industrial Park ( Mohasa Babai )
Katni
(incl. Dhar, Ujjain, Khandwa) Total Area: 1012 Ha
Indore Bhopal Jabalpur
Available Area: 900 Ha
Ratlam Investment Region ICD Facility: Pawarkheda, 23 KM
Total Area: 1466 Ha
Agriculture, Forest Produce and
Mandideep Industrial Area, Defence, Mining and Mineral around
DMIC - Vikram Udyogpuri Ujjain Bhopal Jabalpur Region
Total Area: 451 Ha Total Area: 1102 Ha
Total Available Area: 203.3 Ha Available Area: 0.6 Ha
ICD Facility: Pithampur, 90 Km ICD Facility: (CONCOR)
Engineering, Textile, Healthcare
Mandideep Airport

around Bhopal region Major Rail Junction

(incl. Hoshangabad, Sehore, Dewas)


Map is representative only and not to scale.
Satpura Industrial Park ( Mohasa Babai )
• Industrial area Mohasa Babai is situated on
Nagpur-Bhopal highway in the Hoshangabad
district of Madhya Pradesh.

• Ready to move in infrastructure

• ICD is available within 10 KM’s

• Availability of treated water from River


Narmada and uninterrupted power supply.

• MPIDC has been granted dedicated DISCOM


license for distribution of electricity in
Mohasa Babai.

• Proximity of Itarsi Railway Station (approx. 15


KM) connected to all parts of India, helps in
managing logistics in better way.
Connectivity from nearest airport,
Dedicated water supply Dedicated substations Drainage and Sewage Lines Bhopal i.e 108 KM
Capacity : 22.5 MLD 33/11 KVA ( 4 units ), 132 Available Distance from Railway Station : 15 KM
Source : Narmada KVA 6
Key Textile & Garment Players

Trident Pratibha Syntex Vardhman Nahar Raymond Maral Overseas Sagar Group

Bhaskar Mahima Fibres Gokaldas BEST Corp Kurl On Avgol

Grasim Indorama Vacmet Millennium Baby Care SEL Parasrampuria


7
Doing business in Madhya Pradesh
► Madhya Pradesh has been consistently featuring among the ‘Top Achievers’ in EoDB rankings
► Madhya Pradesh has been ranked 4th by DPIIT, Govt of India in the State Reform Action Plan 2019 and
has been declared as the best performing state in Western region
► Invest Portal: State’s Single Window System (https://invest.mp.gov.in/) caters to the needs of the
investors from allocation of land to approvals of incentives and acts as a One Stop Solution for any
business/ industry
► 45 services of 12 departments can be availed from the Portal
Textile & Garment Ecosystem in Madhya Pradesh
Availability of Raw Material
• State offers easy availability of raw materials like cotton, silk and
Manmade fibre
• Currently more than 60 large textile mills, thousands of looms &
millions of spindles operating in MP
• MP accounts for 43% of India’s and 24% of the world’s organic
cotton production
• Readymade garment cluster at Indore houses over 1,200 units
with an Apparel design centre at Indore SEZ
• World class textile focussed design and technology institutes like
NIFT, NID, IIITDM.
Competitive Cost of Production
• Competitive distribution (i.e. Logistics) cost
• Skilled human resources at affordable rates
• Competitive power charges
• Economical land rates
• Ujjain, Dewas, Bhopal, Sehore, Raisen Chhindwara, Burhanpur,
Dhar, Khargone, Jabalpur, Khandwa and Gwalior are major
textile centres
Progressive Policies - Special Package for Textile Sector
▪ Investment Promotion Assistance: Tax delinked investment assistance ranging from 10% to 40% of the amount of invested
in plant and machinery
o Additional incentive on Employment generation – 1.5 times
o Additional incentive on Export – 1.2 times
o Additional incentive in Priority Block – 1.2 times
▪ Interest Subsidy @ 5-7% for a period of 5 years for Textile sector
▪ Power Tariff at reduced rates
▪ Infrastructure Development Assistance @ 1 Cr each for developing power, water & road infrastructure
▪ Green Industrialization: Capital subsidy of upto INR 1 crore for investment in setting up of Waste Management System/
CETP
▪ 25% subsidy shall be given for establishment of Apparel Training Institute to a maximum limit of INR 50 lakh

Investments more than INR 100 Crores will be eligible for customised incentives package

10
Progressive Policies - Special Package for Garment Sector
• Interest subsidy of 5% for 7 years on term loan taken for Plant & Machinery
• Employment Generation Assistance: INR 5,000/ employee/ month for maximum 5 years for new employees
• Skill development and training expenses reimbursement assistance of INR 13,000/ new employee for MP domicile
employees
• 50% discount in the development fee in case of taking lease land in the industrial area
• Reimbursement of Stamp Duty and Registration Fee on land
• Electricity duty exemption for a period of 7 years
• Concessions on Power tariff: Rebate of INR 1/ unit for 5 years
• Maximum incentives to the tune of 200% of their investment in plant and machinery
• Online Industrial Land Allotment in transparent manner with FAR of up to 2 times and 75% covered area

Investments made in Garment sector more than INR 25 Crores will be eligible for customised incentives

11
12
Visit. Explore. Invest. Lets Grow Together.
For any query, please
write to us:
Principal Secretary, Dept of Industrial Policy and
Investment Promotion

Email: pscommind@mp.gov.in

THANK YOU Managing Director, MPIDC

Email: md.mpidc@mp.gov.in

Website: www.invest.mp.gov.in
Progressive Policies ( Textile )
▪ Interest Subsidy @ 5-7% for a period of 5 years for Textile sector

S. No. Type of Units Interest subsidy


1 For New Units with an investment of up to INR 25 crores in 2% for 5 years from the date of
Fixed Assets commercial production on term loan
taken for TUFS approved plant &
machinery subject to a ceiling of INR
5 crore.
2 New standalone units with an investment of more than INR 25 crores 5% for 5 years from the date of
in fixed Assets or Expansion/Diversification of Existing Standalone unit commercial production on term loan
with fresh investment in TUFS approved plant & machinery of at least taken for TUFS approved plant &
30% of existing investment in fixed Capital Assets (Not less than INR 25 machinery.
crores) or INR 50 crores, whichever is less.
3 New composite unit with an investment of more than INR 25 crores 7% for 5 years from the date of
in fixed Assets or Diversification of Existing Standalone unit into a commercial production on term loan
composite unit taken for TUFS approved plant &
machinery.

15

You might also like