You are on page 1of 9

Railways In India

Sector Highlights Driving New India


SAFETY MOVING THE MOVING THE MAKE
Zero passenger
INDIAN ECONOMY INDIAN ECONOMY IN INDIA
deaths recorded

4th 64,328Km 22,000 7,000+


Dedicated Freight World’s 1st ever conversion of a First indigenous
in 2019 Corridor commissioned diesel locomotive into semi-high speed
an electric locomotive (160 Km/h)
largest railway railway network length trains running daily, making railway stations Vande Bharat Express
network Indian Railways one of the
busiest rail networks in the SAFER ELECTRIFYING EXPANDING
world (25 Mn passengers CROSSINGS RAILWAYS BOUNDARIES
and 3.28 Mn tonnes of
freight Daily) All Unmanned Level 100% electrification World's tallest rail bridge (359 m)
Crossings eliminated underway coming up over the Chenab river

Pamban Bridge which connects the town of Rameswaram on Pamban Island to mainland India

2 3
GIVING MODERNISING PRIORITISING
Indian Railways is the Engine SPEED TO
NEW INDIA
INFRASTRUCTURE,
LAYING NEW PATHS
SAFETY
• Recorded zero passenger
of New India’s Growth Journey • VANDE BHARAT EXPRESS -
First indigenous semi-high speed
• 100% Electrification of
Indian Railways by 2022-23
deaths in rail accidents in 2019,
making it the national
train between Delhi and Varanasi transporter's safest year
• Modern signalling system in history
• Ahmedabad Mumbai to be installed
QUANTUM LEAP ENABLING CONNECTING High-Speed Train - Will reduce • All Unmanned Level
IN CAPITAL CAPACITY DOTS OF SUBURBAN travel time from 8 hrs to 2 hrs • Redevelopment of Crossings (UMLCs)
EXPENDITURE ENHANCEMENT NETWORKS 600 Railway Stations by on network eliminated -
• Speed of trains on providing airport like 1,137 UMLCs per year
• Total capital expenditure • Faster commissioning of railway • Development of Mumbai Suburban during 2009-14, 3479
Golden Quadrilateral and amenities, along with
quadrupled between 2014-19 lines – Pace of commissioning System: Ongoing projects worth UMLCs in 2018-19
Golden Diagonal routes (10,000 Km) commercial as well as
from an average USD 6 Bn per railway lines quadrupled to more than USD 10 Bn
being upgraded to 160 km/h residential development
annum in 2014-15 to USD 24 Bn 15.34 km per day in 2019-20 from • Speedy execution of
per annum in 2019-20 the 4.1 km per day between 2009-14 • Development of Bangalore track renewals - 2,926 km
Suburban System: Ongoing projects in 2013-14 and 4181 km
• As per estimates, USD 700 Bn • Boost to Rail Connectivity in worth more than USD 2.2 Bn completed in 2018-19
is required for railway North East - The entire railway
infrastructure development network in the North East has been • Development of Semi-High Speed
till 2030 converted into a broad gauge Sub-Urban Corridor in Kerala with an
network ensuring seamless investment of USD 8 Bn
connectivity

Chenab Bridge, Jammu and Kashmir


Worrld’s highest rail bridge

4 5
Government
Initiatives/ Policies
FOREIGN DIRECT
INVESTMENT
100% FDI allowed under the
automatic route

ENHANCING PRIVATE CAPEX


THROUGH PARTICIPATIVE MODELS FOR
RAIL CONNECTIVITY AND CAPACITY
AUGMENTATION PROJECTS
• Non-government trains
• Joint venture with equity participation by railways
• Capacity augmentation through funding by customers
• Capacity augmentation – annuity model applicability
• Built Operate Transfer

A railway viaduct at Shindawane ghat near Pune India

6 7
High Speed Rail Corridor Dedicated Freight Corridors
Under construction
Under construction

Amritsar
Planned Ludhiana

Delhi Dadri

Planned
Varanasi
Andal
Ahmedabad Itarsi Dankuni
Rajkharswan Kharagpur
Nagpur
Bhusaval

Mumbai JNPT
Hyderabad

Vijaywada

Chennai
Mysuru

8 9
Upcoming PRIVATE PARTICIPATION METROPOLITAN TRANSPORT

Projects/Opportunities
• Re-development of 50 railway stations • 8 Rapid Rail Transport Systems (RRTS)
through PPP model connecting important urban corridors

• Privatisation of passenger train operations on • Metro rail transit system in 50+ cities
100 routes with 150 privately procured trains

MODERNISATION DEDICATED HIGH SPEED • Establishment of 40 private freight terminals


OF INFRASTRUCTURE FREIGHT CORRIDORS RAIL CORRIDOR annually at a cost of USD 70 Mn

• 33,000 km of railways to be • Two Dedicated Freight Corridors • 1st high-speed railway line project • Private ownership of freight rolling stock
electrified by 2023 at a cost of under construction: under construction between
USD 2 Bn per annum Mumbai and Ahmedabad
Western Dedicated Freight
• Work on tracks over 16,000 km long Corridor connecting • 6 High speed Railway lines
(Multi-tracking – 14,000 km, Delhi and JNPT (Mumbai) – (4109 km) under planning with
Gauge Conversion – 2,200 km) to be 1504 km an investment of USD 118 Bn
completed by 2024 at a cost of
USD 3 Bn per annum Eastern Dedicated Freight • Semi high-speed trains to be
Corridor connecting operational along the golden
• Delhi-Mumbai & Delhi – Howrah Amritsar and Kolkata – 1856 km quadrilateral & Golden Diagonal
(total 3,000 km) to be upgraded to
160 km/h through track and • 4 additional Dedicated Freight
signalling investments Corridors have been planned with an
investment of USD 20 Bn and a total
length of 3929 Km

Mumbai Ahmedabad Bullet Train

10 11
Recent Successes

Alstom to double manufacturing capacity


in India and increase staff to

8,000
CRRC Nanjing Puzhen to invest

USD 50 Mn
in Dholera to manufacture metro rolling stocks

India's first private train,

Tejas Express,
flagged off on the Lucknow-Delhi route

12 Tejas Express, inside view 13


Tejas Express
Key Stakeholders

14 All information in this brochure was last updated on May 06th, 2020. 15
Mumbai Local New AC Coaches

You might also like