FPFH Installation Guideline

FPFH closure Note:


Electrostatic discharge (ESD) might damage the
equipment. Wear an ESD wrist
strap when handling the FPFH-NPP unit.

FPFH

EMHA

251
FPFH Grounding system

This Figure only implemented for FPFH which


installed independently above the FMFA (Plinth) For FPFH which installed above AMOD, the
and the cable routing must through the right grounding must be connected to AMFV and
side cover. routing must through the right side cover.
25 13/08/2022
2
FPFH DC Input/Output sealing cap Port

For each DC Cable size must be


follow cutting part to keep
Ingress protection functionality
sealing cap.

16 sqmm

25 sqmm

35 sqmm

25 13/08/2022
3
FPFH DC Input/Output sealing cap Port

• Make sure for DC output IP Sealing


Cap mounted with correct direction
as picture.
• All IP Sealing cap must be mounted
properly at the DC Port to prevent

√ √ √
any water leak inside the port.

25 13/08/2022
4
FPFH Cabling installation
Installation of cables larger than 14 mm OD
Information on installing cables whose outer diameter is larger than 14 mm

Equipment preconditions
• Cables larger than 14 mm OD
• Two strain reliefs per cable
• Wire stripper
• Insulating tape or heat shrink
tubing

End point cables rules for FPFH:


• DC Input port : ferule required
• DC Output port : ferule not required.

Torque value for FPFH:


• All Connection in port power FPFH must use torque tools
and required to tightness is 3 Nm.
25 13/08/2022
5
FPFH Cabling installation
Installation of cables larger than 14 mm OD Strip the outer jacket of the power cable.

Sample DC Power Input 1 FPFH


(370mm+20mm)

25 13/08/2022
6
FPFH Cabling installation
Installation of cables larger than 14 mm OD

25 13/08/2022
7
FPFH Cabling installation
Installation of cables larger
than 14 mm OD

Bending route DC
Input cable for
stripped outer
jacket

Bending route DC
Output cable for
stripped outer
25 13/08/2022
8 jacket
FPFH Cabling installation
Installation Step of cables in FPFH (1/4)
Measure the cable length to be Stripped Outer Jacket DC Cable for DC Input Insulated striped cable using insulation black tape and remain
stripped for outer jacket cable. or DC Output follow table length striped open10 cm for DC Input1 and 15 cm for DC output 1

Input
outpu
t

Stripped core conduit DC Cable up to 2 cm Cut rubber sleeve DC port as cable diameter
size

Input outpu
t

25 13/08/2022
9
FPFH Cabling installation
Installation Step of cables in FPFH (2/4)
Insert cable to rubber sleeve IP Shield for For end point DC Insert the end point DC cable at each function port in
each port Cable for Input FPFH
require ferule
Input outpu outpu Input Input outpu
t t t

Make sure DC Cable attached to the port with tighten value 3 Nm


Tighten the cable at port

Input outpu
t

26 13/08/2022
0
FPFH Cabling installation
Installation Step of cables in FPFH (3/4)
Bend the DC Cable at side FPFH Casing as circle bending Circle Bending at side FPFH Casing

Input outpu Input outpu


t t

Tight the Circle Bending using cable ties The cable ties fix the route of DC cable

Input outpu
Input outpu
t
t

26 13/08/2022
1
FPFH Cabling installation
Installation Step of cables in FPFH (4/4)
Label the DC cable View of DC Output 1 and Input 1

Input outpu
t

View of DC Output 1,2,3,4,5,6 and Input 1 View of FPFH with cover

26 13/08/2022