You are on page 1of 3
Instruction Manual for BLS Samsung que Maritime Pusnes AS HN 1408 Vol. 2 Contents: Vol. 1 Instruction, Mechanical/Hydraulic arrangement Vol. 2 Drawings and part list Vol. 3 Hydraulic Power Unit Vol. 4 Electrical Control System Building no. 7408. ‘Order no.: 1750 - OF ‘Customer: : ae BLS Samsung Heavy Industries Checked: LIQ 2602. ss - cS ‘athe. [pais 1 of 1 {sO ffshorelORDREN1750 Samsung BLS HN1408\13 DokumentasjonlinstruksjonsbokWwol_2\Forsice.doc Gary Maritime Pusnes AS eee IMPORTANT Operators of the Maritime Pusnes deck machinery and mooring systems for ships shall be qualified and trained personnel. The personnel shall have relevant knowledge to the system and the procedures involved. The machinery shall be operated in accordance with the procedures described in this manual. Lio tfshoreiORDREM750 Samsung BLS HN1408113 DokumentasjonIinstruksjonsbokivol_2warning.doc Goa 1 CONTENTS _Maritime Pusnes AS 1. ADJUSTABLE ROLLER FAIRLEAD, 500 ARF 2. CHAIN STOPPER, QRS 83 3. GUIDE ROLLER WITH LOAD CELL. 4, MOORING WINCH, 450 HW+140 TU 5. POWER SHEAVE UNIT, PSU 6. BOW ROLLER RETRACTABLE 7. CARDAN SUSPENSION, BLC 20” 8. GUIDE ROLLER FOR HOSE HANDLING WINCH 9. HOSE HANDLING WINCH, 400 HW. 10, BOW DOOR 14. CALIBRATION EQUIPMENT 12, LOCAL CONTROL CONSOLE, HYDRAULIC/ELECTRIC (RCPH/E) 13. BALL VALVE CABINET 14, VALVE UNIT SKID 15. ACCUMULATOR RACK 16. MOTOR - PUMP UNIT 17. PIPING DIAGRAM / HYDRAULIC SYSTEM 18. HYDRAULIC PUMP STATION SEE VOL. 3. 19. STARTER CABINET SEE VOL 4. 20, ELECTRIC EQUIPMENT CABINET SEE VOL. 4 21, REMOTE CONTROL POST ELECTRIC (RCPE) SEE VOL 4. 22. UPS 24 VDC SEE VOL 4. 23, BRIDGE CONTROL PLATES SEE VOL. 4 24. JUNCTION BOX SEE VOL. 4. 25. DATA LOGGER SEE VOL. 4. ‘Samsung HN 1408 {LaProsjokti03 L170 Samsung BLS HN1408113 Dokumentasjon\instruksjonsbokWvol_2100hw.doc

You might also like