Instruction Manual
for
BLS Samsung
que
Maritime Pusnes AS
HN 1408
Vol. 2
Contents:
Vol. 1 Instruction, Mechanical/Hydraulic arrangement
Vol. 2 Drawings and part list
Vol. 3 Hydraulic Power Unit
Vol. 4 Electrical Control System
Building no. 7408. ‘Order no.: 1750 - OF
‘Customer: :
ae BLS Samsung Heavy Industries
Checked: LIQ 2602. ss -
cS ‘athe. [pais
1 of 1
{sO ffshorelORDREN1750 Samsung BLS HN1408\13 DokumentasjonlinstruksjonsbokWwol_2\Forsice.docGary
Maritime Pusnes AS
eee
IMPORTANT
Operators of the Maritime Pusnes deck machinery and mooring systems for ships shall be
qualified and trained personnel.
The personnel shall have relevant knowledge to the system and the procedures involved.
The machinery shall be operated in accordance with the procedures described in this
manual.
Lio tfshoreiORDREM750 Samsung BLS HN1408113 DokumentasjonIinstruksjonsbokivol_2warning.docGoa
1 CONTENTS _Maritime Pusnes AS
1. ADJUSTABLE ROLLER FAIRLEAD, 500 ARF
2. CHAIN STOPPER, QRS 83
3. GUIDE ROLLER WITH LOAD CELL.
4, MOORING WINCH, 450 HW+140 TU
5. POWER SHEAVE UNIT, PSU
6. BOW ROLLER RETRACTABLE
7. CARDAN SUSPENSION, BLC 20”
8. GUIDE ROLLER FOR HOSE HANDLING WINCH
9. HOSE HANDLING WINCH, 400 HW.
10, BOW DOOR
14. CALIBRATION EQUIPMENT
12, LOCAL CONTROL CONSOLE, HYDRAULIC/ELECTRIC (RCPH/E)
13. BALL VALVE CABINET
14, VALVE UNIT SKID
15. ACCUMULATOR RACK
16. MOTOR - PUMP UNIT
17. PIPING DIAGRAM / HYDRAULIC SYSTEM
18. HYDRAULIC PUMP STATION SEE VOL. 3.
19. STARTER CABINET SEE VOL 4.
20, ELECTRIC EQUIPMENT CABINET SEE VOL. 4
21, REMOTE CONTROL POST ELECTRIC (RCPE) SEE VOL 4.
22. UPS 24 VDC SEE VOL 4.
23, BRIDGE CONTROL PLATES SEE VOL. 4
24. JUNCTION BOX SEE VOL. 4.
25. DATA LOGGER SEE VOL. 4.
‘Samsung HN 1408
{LaProsjokti03 L170 Samsung BLS HN1408113 Dokumentasjon\instruksjonsbokWvol_2100hw.doc