Professional Documents
Culture Documents
Initial preparations: Make fast Toggle painter, Ship drain plugs, Remove Harbour pins, Lower
embarkation ladder, Release gripes after senhouse slip.
Lower to embarkation deck: Lift brake gently and Lower to embarkation deck. Ship Rudder and tiller
Boarding: Let go tricing pendants. Board when ordered to (wearing lifejacket). Sit as low as possible and
keep hands inside the boat.
Lower to water: Let go Bowsing-in tackles equally fore and aft from the boat. Lower boat to the water.
Lower to embarkation deck: Lift brake gently and Lower to embarkation deck. ...
Lower to water: Let go Bowsing-in tackles equally fore and aft from the boat. ...