You are on page 1of 1
Brushless A.C Generator ‘on machine provided witha filters atthe ar ile, the cleaning condition of the fter should be monitored. In machines having closed-circuit cooling, the ai-to- water cooler is placed transversely in the top-mounted box in transverse arrangement, in front ofthe excitation control unt. Tha primary cooling ar circulated by the internal fan i e- cooled in he cooler and passed through the excitation control unit the excite and the main machine. Given the necessary provisions, the machine can be ‘adapted for emergency operation wth open circuit cooling in case of cooing water falure. See pages 46-48 6) Connecting up Check the system vottage against the data given an the rating plate. Select the size ofthe supply cables to match the particular current rating Connect the machines in accordance with the diagram in the working crawing ‘Before closing the terminal box, check to see that + Its interior is clean and fee from any cable chipnings + all terminal screws or bots are tight + The minimum clearances in air are maintained (10 mm for 500 v,>14 mm for 1 kV and > 60 mm for 6KV; check for any projecting wire ends) + Entry openings not in use are closed ot by tem screwed:in plugs + For maintaining the particular degree of protection all sealing surfaces of the terminal box are in order. ‘Te surtaces of metal-to-metal sealing joints must be ‘leened and thinly regressed, ‘Before staring a machine and during operation make ‘ure that all relevant safety regulations are complied with 7) insulation testing Hazardous voltage ‘wit case death sors injury, electrocution or propanty comage. Disoonnectal power before workerg on this equipment. ‘Before commissioning and after long periods of storage or standstl the insulation resistance ofthe windings tothe frame must be measured with D.C. voltage. ‘be net aiscontinue messuramont bofore tha final resistance valve is indicated (wth high-voltage machines, ‘this process may take up to Iminut). “The limit values fr minimum insulation resistance and cial insulation resistance (for measurement at a winding temperature of 25%) and for measuring voltage ‘can be derive from the folowing table depending on the rated voltage for the machine. = tebe 2 eon ang — Limit vas at ate vokape Rated votage | Rete votage <2 >2Kv sovoc | sbovoc Mensreoage | pan e0¥00 | ac) ressurcewinrewmachre| 700 cy Cleaned ofepaed vir | crea spec rslaton resistance afer long | pono of operation ostwky Dries windings nave insulation resistance values between +00 and 2000 Ho oF higher the insulation resistance value sin the region ofthe ‘minimum value, dampness and/or crt could be the cause. If he insulation resistance value falls below this minimum figure, the cause must be established and the winding red, In case of ying by wan ar oven, + Remove bearing housings + Remove rotor + Remove lode & varistor from excitation equipment part Bake in oven at temperatures per below table The Neat should be appied siowly so the desired temperature will not be obtained in less than six hours. Insulation resistance should be measured before the heat 's applied, and every six to eight hours thereate. ‘STatie FE raion dy tarpsares Cass78 | Clas F Oss wor [ASF 2s orc | tee usc * Gise"F ord halted uns shoul be kad 70% speed ‘empertie to avo steam mde wing for abut srs etre temperature ase o dreamer ‘The Insulation resistance for clean winding fs largely ‘dependent on temperature: fr each 10K ise in temperature ifals by hal, ie. witha temperature rise of 50K (eg. from 25° to 75°) I fls to about 1/20 of the intl value.

You might also like