# Item

Talgo -Standard cabin


1 Talgo-F073 Standard Cabin FEA Report - Preliminary FEA
2 Talgo-F073 Standard Cabin FEA Report - Revision R1
3 Talgo-F073 Standard Cabin FEA Report - Revision R2
4 Talgo-F073 Standard Cabin FEA Report - Revision R3
5 Talgo-F073 Standard Cabin FEA Report - Revision R4
6 Talgo-F073 Standard Cabin FEA Report - Revision R5
7 Talgo-F073 Standard Cabin FEA Report - Revision R6
8 Talgo-F073 Standard Cabin FEA Report - Revision R7
9
Talgo Standard tank Frame FEA Report
10 Initial analysis- prsentation
11 Tank with Belt concept -Revised
12 Talgo-F073 Standard Tank Frame FEA Report - Preliminary FEA
13 Talgo-F073 Standard Tank Frame FEA Report - Revision R1
14 Talgo-F073 Standard Tank Frame FEA Report - Revision R2
15 Talgo-F073 Standard Tank Frame FEA Report - Revision R3
16 Talgo-F073 Standard Tank Frame FEA Report - Revision R4
17 Talgo-F073 Standard Tank Frame FEA Report - Revision R5
18 Talgo-F073 Standard Tank Frame FEA Report - Revision R6
19 Talgo-F073 Standard Tank Frame FEA Report - Revision R7
20 Talgo-F073 Standard Tank Frame FEA Report - Revision R8

Talgo UWC cabin FEA Report


21 Talgo-F073 UWC Cabin FEA Report - Preliminary FEA
22 Talgo-F073 UWC Cabin FEA Report - Revision R1
23 Talgo-F073 UWC Cabin FEA Report - Revision R2
24 Talgo-F073 UWC Cabin FEA Report - Revision R3

Talgo UWC Tank Frame FEA Report


25 Talgo-F073 Uwc tank Frame FEA Report - Preliminary FEA
26 Talgo-F073 Uwc tank Frame FEA Report - Revision R1

Delay

7
8
9

Delay

Total Delay
10
11
12

Total Saving

Net Delay
Bucharest Train Metro Inputs
Plan - Signed Plan (Rev02)
FAI = 2022-4-12th Actual Delta

Monday, August 17, 2020


Tuesday, September 22, 2020
Tuesday, November 10, 2020
Monday, January 18, 2021
Saturday, March 13, 2021
Thursday, February 10, 2022
Thursday, March 10, 2022
Thursday, May 19, 2022

Monday, June 1, 2020


Monday, June 8, 2020
Thursday, November 26, 2020
Monday, March 8, 2021
Wednesday, June 30, 2021
Tuesday, September 14, 2021
Thursday, October 14, 2021
Wednesday, December 15, 2021
Tuesday, February 8, 2022
Tuesday, April 12, 2022
Wednesday, June 1, 2022

Tuesday, September 8, 2020


Sunday, January 24, 2021
Tuesday, March 16, 2021
Sunday, January 17, 2021

Wednesday, December 8, 2021


Tuesday, March 1, 2022

Subsequent Delay in the Plan

Savings
0 Day
Bucharest Train Metro Inputs

Remarks

First submission
Detailed Report submitted with Bolt calculation, Fatigue loads and Mechanical test properties
Remarks to include mechanical test properties of laminates, type of testing , Additional bolt ca
Remarks regarding Formatting of Report, page breaks, details of resin used , and Bolt calculatio
Remarks regarding Bolted joint calculation, Bonded joint calculation and Raw material used
Remarks to Add Bond test report, Bolt calculations modification
Remarks for Bolt calculation , bolt lubrication and additional output pictures
Remarks majorly in Bolt calculation and bolt lubricant

First Submission
Revised report with additioanl loads and assumptions
Modified stiffer Tank Frame withoout belts, only Box sections
Remarks to consider water sloshing loads in the tank and rerun
Remarks to add welded joint validations and Bolt calculation
Remarks to include weld details from drawing into the report
Remarks for weld drawings, Bolt calculation, Bolt lubrication values
Remarks for weld drawings, Bolt calculation, Bolt lubrication values
Remarks for weld drawings, Bolt calculation, Bolt lubrication values
Remarks for weld drawings, Bolt calculation, Bolt lubrication values
Remarks for weld drawings, Bolt calculation, Bolt lubrication values

First Submission
Toilet geometry cahneg and Mounting location changed
Remarks for additional stress pictures and material properties
Remarks for Material Properties, Comments formating and words updation

First submission
Bolt calculation revision, more result pictures requested
No.of pages

50
61
90
105
126
127
133
148

23
23
23
50
64
64
64
82
82
84
84

37
49
98
98

79
80

FAI Date
6/19/2022 4/12/2022
6/9/2022
6/5/2022