RFI

Item Reference No. Details Discipline


1 2174/RFI/EG/021/22 9th Floor Existing Graphicote to be Painted AR
2 2174/RFI/EG/023/22 Furniture Tagging and details AR
REQUEST FOR INFORMATION ON VENTILATION
2174/RFI/OP/027/22 SYSTEM OF SERVER AND BMS CONTROL ROOM ME
3 AT 8TH FLOOR
4 2174/RFI/EG/028/22 FLOOR FINISH OF PROPOSED IDF ROOMS AR
5 2174/RFI/EG/029/22 17F MECHANICAL EQUIPMENT SCHEDULE AR
6 2174/RFI/EG/031/22 Door Schedules AR
7 2174/RFI/OP/032/22 Lightting Fixtures Switches EE
8 2174/RFI/EG/033/22 Joinery and Furniture Confirmation AR
9 2174/RFI/EG/034/22 Graphic Stickers AR
Conveinience Outlet Layout Mounted at Perimeter Walls
2174/RFI/OP/035/22 EE
10 and Columns
Date Date Required
6/30/2022 7/4/2022
6/30/2022 7/3/2022

7/7/2022 7/11/2022

7/7/2022 7/11/2022
7/7/2022 7/11/2022
7/8/2022 7/11/2022
7/11/2022 7/13/2022
7/12/2022 7/14/2022
7/11/2022 7/13/2022
7/12/2022 7/14/2022
Project : FPH RBC RESTASTACKING
Re : RFI/MAR Tracker
Date : as of 25 July 2022

ITEM REFERENCE NO. DETAILS DISCIPLINE DATE DATE REQUIRED GA's COMMENTS
Key Plan - Furniture Tagging AR
1 2174/MAR/EE/009/22 Poweredge Solutions (Phils.) Inc. - EE 6/9/2022 6/13/2022 Final recommendation emailed 21
Uninterruptible Power Supply (UPS) July 2022
RFI UPS and Back up Battery 7/25/2022 Final Respond on RFI emailed 27
July 2022
2 2174/MAR/EE/016/22 Neltex uPVC Electrical Conduit Pipes EE 6/22/2022 6/24/2022 Responded Via Email 24June 2022
(for Concrete Embedment only)
3 2174/MAR/ME/022/22 Air conditioning Materials ME 7/9/2022 7/12/2022 Responded via Email 20July2022
4 2174/MAR/EC/023/22 Data & Network Materials EC 7/9/2022 7/12/2022 Responded via Email 11July2022
Data & Network Materials EC 7/21/2022 7/22/2022 Responded via Email 22July2022
5 2174/MAR/AR/024/22 Paint - Boysen AR 7/12/2022 7/15/2022 Responded via Email 20July2022
7/22/2022 Approved 2nd sample 22 July 2022
6 2174/MAR/ME/025/22_rev.A JNCH - Fire Protection Materials ME 7/12/2022 7/14/2022 Responded via email 19July2022
7 2174/MAR/EC/026/22_rev.A Multiline - FDAS Matls EC 7/13/2022 7/15/2022 Responded via email 19July2022
8 2174/MAR/AR/027/22 FLKN & COREBILT - Architectural AR 7/13/2022 7/15/2022 Responded via email 19July2022
Finish (CP-03)
9 MAR Exhaust Fan ME July 18, 2022 Responded via email 22 July 2022
10 8F Ceiling Lay Out
Location of Acoustic Panel Screen Type AR July 18, 2022 Responded 20 July 2022
PFE Holder Details
11 11F Partition and Wall Partition AR July 20, 2022 Responded 21July2022
12 FDAS Design vs Actual EC July 20, 2022 Responded 26July2022
13 Door Schedules AR Responded 26July2022
Switches Location EE Responded via Email 22July2022
July 12, 2022
AP Panel AR Responded via Email 22July2022
Graphics Location AR Responded via Email 22July2022
14 Lighting Fixtures AR July 16, 2022 Responded via Email 22July2022
14
Auxilliary System EE July 16, 2022 Responded via Email 22July2022
15 Auxilliary Items ACS Cables EC July 23, 2022 Responded via Email 26July2022
AFSS System ME Responded via Email 26July2022
16 8th Floor Power Lay out EE Responded via email 27July2022
8F TL 1 specifications AR 27-Jul-22 Responded via email 27July2022
8F LP 1 Location EE Responded via email 29July2022
17 8F Joinery Lay Out AR Responded via email 29July2022
11F FCU Location ME 27-Jul-22
8F and 9F Joinery Details AR Responded via email 29July2022
18 8F Lactation Room FCU Drain Location ME 28-Jul-22 Responded via email 29July2022
VL 04 specifications
19 Acoustic Panel Installation Details AR 28-Jul-22
GL and LM elevation