MINTURE OF MEETING WITH PWD AND SACIL FOR COMPLETESION OF WORK

DATE OF COMPLETION
S.NO DRECIPATION LOCATION
11/2/2022 11/22/2022
1 IEI

NORTH &
1.1 WIRING (ALL FLOOR) 11/10/2022
SOUTH BLOCK

FIXTURES (GROUND & NORTH &


1.2 11/10/2022
1ST FLOOR CORRIDOR) SOUTH BLOCK

NORTH &
1.3 MCB,MCCB, ISOLATOR 11/10/2022 11/26/2022
SOUTH BLOCK

NORTH &
1.4 FLOOR PANELS 11/20/2022 11/30/2022
SOUTH BLOCK

EARTHING & LIGHTING NORTH &


1.5 11/10/2022
ARRESTOR SOUTH BLOCK

2 LIFT

NORTH &
2.1 4 No OLD LIFT 11/20/2022 11/28/2022
SOUTH BLOCK

NORTH &
2.2 4 NO NEW LIFT 1/31/2023 1/31/2023
SOUTH BLOCK

3 FIRE ALARM SYSTEM

NORTH &
3.1 CONDUCTING, WIRING 11/20/2022 11/30/2022
SOUTH BLOCK

NORTH &
3.2 DETECTOR, PANEL ETC 11/20/2022 11/30/2022
SOUTH BLOCK

VIDEO CONFERECE + NORTH &


4 AUDIO (CONDUCTION & SOUTH BLOCK 11/25/2022
WIRING)

5 FIRE FIGHTING SYSTEM

NORTH &
5.1 FIRE HYDANTAR 11/15/2022 11/30/2022
SOUTH BLOCK

NORTH &
5.2 FIRE EXTINGUISHER 11/15/2022 11/30/2022
SOUTH BLOCK

NORTH &
5.3 SIGNAGES 11/15/2022 11/30/2022
SOUTH BLOCK
6 HVAC

LOW SIDE (PIPING &


NORTH &
6.1 CONTROL) 2ND & 3RD 11/28/2022
SOUTH BLOCK
FLOOR

HIGH SIDE (INDOOR & NORTH &


6.2 12/30/2022 12/30/2022
OUTDOOR) SOUTH BLOCK

7 POWER HOUSE

7.1 TRANSFORMER POWER HOUSE 11/15/2022

7.2 DG SET POWER HOUSE 11/15/2022 11/30/2022

7.3 POWER LT PANELS POWER HOUSE 11/15/2022 11/30/2022

7.4 POWER CONNECTION POWER HOUSE 11/20/2022 11/30/2022

7.5 IEI POWER HOUSE 11/15/2022 11/30/2022

8 COMPOUND LIGHTING

8.1 STREET LIGHTING INFRA 11/15/2022 11/30/2022

8.2 COMPOUND LIGHTING INFRA 11/15/2022 11/30/2022

8.3 FOUNTAIN & BOLLARD INFRA 11/15/2022

9 LANDSCAPE LIGHTING INFRA 11/10/2022 11/30/2022

10 PUMP ROOM

10.1 PUMP INSTALLATION INFRA 11/20/2022 11/30/2022

10.2 IEI INFRA 11/20/2022 11/30/2022

11 STP

11.1 ELECTROMECHANICAL STP


WORKS

11.2 IEI STP

12 SECURITY BARRACK
12.1 IEI INFRA 11/20/2022 11/30/2022
13 OUTDOOR INFRA PANEL INFRA 11/15/2022 11/30/2022
MPLETESION OF WORK

REMARKS

COMPLETED

COMPLETED

GROUND & 1st FLOOR


COMPLETED

COMPLETED

COMPLETED

EXCEPT TEST & COMMISSION

80% OF WORK COMPLETED IN


BOTH BUILDING

AFTER HVAC WORK


COMPLETED.

ORDER PLACED,BOSCH
MATERIAL WILL DELIVERY IN
12 WEEK.

NORTH BLOCK IS COMPLETED,


SOUTH BLOCK IS WORK IN
PROGRESS.

WILL BE INSTALL AT HAND


OVER TIME

WILL BE INSTALL AT HAND


OVER TIME
NORTH BLOCK 3RD FLOOR CP
COMPLETED, CONTROL AND
DRAIN PIPE WORK IN
PROGRESS.
SOUTH BLOCK CP WORK IN
PROGRESS.

COMPLETED

COMPLETED

MISSING PARTS
INSTALLATION, REWIRING &
SERVICE WORK IN PROGRESS.

PWD SCOPE

WORKING PROGRESS

50 % COMPLETED REMAINING
WORKING PROGRESS

80% WORK COMPLETED

COMPLETED

SLD DRAWING REQUIRED


FROM PWD TO START
WIRING.

PUMP ROOM DRAWING


SUBMITTED TO PWD,
WAITING FOR APPROVAL
AFTER CIVIL WORK
COMPLETION

AFTER CIVIL STUCTURE


COMPLETETION
AFTER CIVIL STUCTURE
COMPLETETION

AFTER LOCK OPEN BY PWD.


WORK IN PROGRESS