You are on page 1of 18

AMKOR List Of Drawing

ARCHITECTURE
No. Drawing No. Drawing Title

1 2022/31/AMKOR/K.LANGAT/TENDER/OD/PLATING/01 DRAWING INDEX


2 2022/31/AMKOR/K.LANGAT/TENDER/OD/PLATING/02 LOCATION PLAN, KEY PLAN,SITE PLAN, OVERALL SITE PLAN & DEVELOPMENT DATA
3 2022/31/AMKOR/K.LANGAT/TENDER/OD/PLATING/03 LEVEL 1 FLOOR PLAN
4 2022/31/AMKOR/K.LANGAT/TENDER/OD/PLATING/04 LEVEL 2 FLOOR PLAN
TAJUK PROJEK :
5 2022/31/AMKOR/K.LANGAT/TENDER/OD/PLATING/05 ROOF PLAN (WATER TANK/UTILITY AREA) (Project Title)

6 2022/31/AMKOR/K.LANGAT/TENDER/OD/PLATING/06 ROOF PLAN (FLAT ROOF AREA), FRONT ELEVATION, LEFT ELEVATION
CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN
7 2022/31/AMKOR/K.LANGAT/TENDER/OD/PLATING/07 RIGHT ELEVATION, REAR ELEVATION, SECTION A-A, RAMP DETAIL KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
8 2022/31/AMKOR/K.LANGAT/TENDER/OD/PLATING/08 SECTION B-B, SECTION C-C, SECTION D-D,RAMP DETAIL SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
TYPICAL ROOF DETAIL, INSULATION DETAIL KUALA LANGAT, SELANGOR DARUL EHSAN.
9 2022/31/AMKOR/K.LANGAT/TENDER/DW/PLATING/09 DOOR & WINDOW SCHEDULE, RC COPING DETAIL, TRENCHES DETAIL, WASTE WATER
UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.
SUMP DETAIL,
10 2022/31/AMKOR/K.LANGAT/TENDER/FF/PLATING/10
FLOOR FINISHES KEYPLAN LIST OF CHANGES IFC02
11 2022/31/AMKOR/K.LANGAT/TENDER/FF/PLATING/11
NO. DATE DESCRIPTION APPROVED REMARKS

12 2022/31/AMKOR/K.LANGAT/TENDER/WF/PLATING/12 Relocate IT room, lab room, office, maintenance office


1.
WALL FINISHES KEYPLAN (epoxy mortar floor finish)

13 2022/31/AMKOR/K.LANGAT/TENDER/WF/PLATING/13 2. Add new QC room at level 1 with fixed glass window, 1


XRF room with sliding door

14 2022/31/AMKOR/K.LANGAT/TENDER/CDS/PLATING/14 REFLECTED CEILING KEYPLAN & SURAU DETAIL Add new production support room at level 1 with fire
rated brick wall, fire rated door FD1, fixed glass
3.
window, wall mounted ventilation fan, floor trap & 1
15 2022/31/AMKOR/K.LANGAT/TENDER/TD/PLATING/15 water tap
TOILET DETAIL, WATER PROOFING AND DROP DETAIL Floor finish for cold shell at level 2 will be changed
16 2022/31/AMKOR/K.LANGAT/TENDER/SD/PLATING/16 4. from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
17 2022/31/AMKOR/K.LANGAT/TENDER/SD/PLATING/17 mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
STAIRCASE DETAIL room)1500mm (ht) wall tiles with water proofing on
18 2022/31/AMKOR/K.LANGAT/TENDER/SD/PLATING/18 floor & wall (ablution area)

Additional 1 new safety shower and relocate 2 other


6. showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and

GENERAL NOTES SPECIFICATIONS 7.


2
Relocate hose rell compartment at grid 3,D to 4,D
Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)
11. New window type W3A at level 1 & level 2(corridor area)
12. Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

HAK CIPTA TERPELIHARA


Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
commencement of works.

LUKISAN
(Drawing)

-DRAWING INDEX

LEGEND REMARKS LEGEND REMARKS


CEILING FLOOR

SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023

LEAD TECHNICIAN :

PROJECT MGR. : -

PROJECT DIR. : -

CHECKING DIR. : CK TEO


WALL 0
REVISION

DRAWING NO. :

2022/31/AMKOR/K.LANGAT/CONST/OD/PLATING/01

TANDATANGAN PEMILIK TANAH & BANGUNAN :

.............................................................................................

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


PENGURUS KANAN

AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139

Arkitek
(Architect)

BYG Architecture Sdn. Bhd.


(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

Cop
ALL NOTES, BRANDS, MODELS, ETC. SPECIFIED IN THIS (Stamp)
'' LEGEND & SPECIFICATION SHEET '' SHALL TAKE DATE
PRECEDENCE OVER ALL DISCREPANCIES ( IF ANY ) CONSTRUCTION AUGUST 2023

IN ALL OTHER SHEETS OF THE DRAWINGS. DRAWING REVISION : 02


PINTU KEDUA
PINTU UTAMA
(UNTUK LORI)

4689
4690
4688
1436 1437 1438 1440 1644

dari Klang

/
LALUAN JALAN SEDIAADA

/
2941

/
/
1643

/
LALUAN JALAN SEDIAADA

/
/
/
/
1642 2942
55778.40

/
/
1603 1604 1605 1606

Deccicator
1602

/
/
1641 2943

/ /
BANGUNAN

/
/
1640

/
2944 SEDIAADA

/
TANAH KOSONG SEDIAADA BANGUNAN SEDIAADA
JALAN WAJA

/
/
/
45172.90

Control
Systemation

/
/
4823

/
Weight

/
3979

/
615
KILANG SEDIAADA
4822

/
/
4821

/
/
2133
/ / / / / / / / /

4824 GREEN AREA 59

CONNECT TO THE EXISTING ROAD


5680.00
5790.00

TAJUK PROJEK :
114977 56 LALUAN JALAN SEDIAADA LALUAN JALAN SEDIAADA (Project Title)

LOT 4825
T E M P A K L E T A K K E R E T A

2134 1
1 0
20
29

C A D A N G A N J A L A N 7 . 3 M

3679.20

5003.12 1800.00

1 14 15 28

CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


Panel
Monitoring System
Cabinet

4825 2135 TEMPAT LETAK MOTOSIKAL


7620.00

616 GREEN AREA

A
GREEN AREA
7 8 21 22

N
KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
Cabinet

J
9172.80

30

QA Reject
Rack
K
GREEN AREA A

A
N

DB
2139 SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH

DB
A
617 1500.00

N
TANGKI

G
SEDIAADA

KUALA LANGAT, SELANGOR DARUL EHSAN.

U
B

N
A
2137

N
7
C
.
3

A
G

6
M

D
M
A
C
BANGUNAN SEDIAADA

A
R

N
2149

I
UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

E
S

G
R
A

A
42

I
N

N
M E
XRF

J
ROOM

T
E

A
D AREA
GREEN

E
M

L
R
CONNECT TO THE EXISTING ROAD

A
P

N
A
LALUAN JALAN SEDIAADA
TLL 2

P
D
SPRINKLER

L
DIESEL

7
A
TANK

A
2150

.
N

N
E

3
T
TLL 1

M
I N
LIST OF CHANGES IFC02

G
GREEN AREA
FIRE WATER TANK

3981
55
LALUAN JALAN SEDIAADA
3982 1 2
C
3
A D A N G A N 4 J A L A N 7 5. 3 M 6
NO. DATE DESCRIPTION APPROVED REMARKS
53

3984 43 50 52

Relocate IT room, lab room, office, maintenance office


PETUNJUK : 1. (epoxy mortar floor finish)
4590 BANGUNAN SEDIAADA
1137 Add new QC room at level 1 with fixed glass window, 1
4591 2.
4592 XRF room with sliding door

1136 Add new production support room at level 1 with fire


4593 rated brick wall, fire rated door FD1, fixed glass

LOT 617
4569 3.
window, wall mounted ventilation fan, floor trap & 1
2406 21927 water tap

Floor finish for cold shell at level 2 will be changed


4129 4. from cement render to bare concrete finish
36 g
antin 3462 2946 Add 1 male surau & 1 female surau at level 1 (epoxy
34 ri B 4813
da mortar floor) with ablution (wall & floor tiles),door D1,
31 3 5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

KEY PLAN LOCATION PLAN OVERALL MASTER PLAN 6.


Additional 1 new safety shower and relocate 2 other
showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and


2
LOCATION PLAN 7. Relocate hose rell compartment at grid 3,D to 4,D

//
Relocate hose reel compartment at male toilet level 1 &

/
/
level 2. Relocate hose reel to IT room.

/
/
/
MSB room at level 2 became bigger with new fire rated

/
8.

/
double leaf door

/
/
9.

/
All wall is without skim coat (plaster & paint)

/
/
/
2° fall for all flat roof area (from cement screed to

/
10. cement render with water proofing)

/
/
/
11. New window type W3A at level 1 & level 2(corridor area)

/
/
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /

Additional and relocation 3 NOS of BMI compact


/ / /

12.
/ / / / /

rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1
GREEN AREA 59

CONNECT TO THE EXISTING ROAD

56
H
HAK CIPTA TERPELIHARA
CAR PARK E X. H Y D R A N T Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.
1
10
20 Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
29
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.
CADANGAN JALAN 7.3M
COPYRIGHT
This drawing and design was generated by a CADD computer software system.
1 14 15 28 H All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
MOTOR PARK to be confirmed on site. All descripencies shall be reported to the Architect before the
commencement of works.
GREEN AREA
ANJAK

GREEN AREA
7 8 21 22 RESERVE AREA FOR WATER JET PUMP, SCRUBBER, BLOWER & WW SUMP LUKISAN
(Drawing)
AN BA

30 -KEY PLAN
-LOCATION PLAN
NGUN

-SITE PLAN
A
( RESERVE AREA FOR CD SCRUBBER &

-OVERALL SITE PLAN


AN 7.6

-DEVELOPMENT DATA
BLOTREATMENT PLANT )
M

SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023


CAR P

EXISTING
WATER TANK LEAD TECHNICIAN :
ARK

B PROJECT MGR. : -

PROJECT DIR. : -
PRODUCTION AREA
CHECKING DIR. : CK TEO
0
REVISION
PROPO
3M PE
SITE B

DRAWING NO. :
SED R

C
RIM

EXISTING BUILDING 2022/31/AMKOR/K.LANGAT/CONST/OD/PLATING/02


OUNDA

ETER

OAD
R

PLANT

TANDATANGAN PEMILIK TANAH & BANGUNAN :


Y

7.3M

42

PRODUCTION LAB ROOM QC ROOM MAINTENANCE OFFICE


ING

SUPPORT IT ROOM
ROOM OFFICE
XRF
ROOM GREEN AREA

D
TOILET
FIRE PUMP ROOM 2 SURAU (M)
GENSET

CONNECT TO THE EXISTING ROAD


OKU .............................................................................................
CHILLER ROOM SWITCH ROOM
ENTRANCE TLL 2
MD ZAMAN BIN ISHAK (IC : 700115-10-6305)
FIRE PUMP ROOM 1 SPRINKLER PENGURUS KANAN
SURAU (F)
DIESEL
TANK TOILET H AMKOR TECHNOLOGY MALAYSIA SDN. BHD.
(NO. SYARIKAT : 197301002216 (15702-X)
E 15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
FFL : 05.80 TLL 1 E X. H Y D R A N T KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139
H
UTARA GREEN AREA
NEW FIRE WATER TANK FFL : 05.75 Arkitek
(Architect)

55

1 2 3 4 5 6
LALUAN JENTERA BOMBA-KOSONGKAN LALUAN DRIVEWAY 53
PREMIX
PROPOSED ROAD 7.3M RFL : 05.30
BYG Architecture Sdn. Bhd.
43 50 52 (Co. No. : 410508-H)
CAR PARK 3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

SITE PLAN TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

Cop
(Stamp)

DATE
CONSTRUCTION AUGUST 2023

DRAWING REVISION : 02
TO
C T
NNE
CO

1
H
14 15 28

RESERVE AREA FOR WATER JET PUMP, SCRUBBER, BLOWER & WW SUMP GREEN AREA
TAJUK PROJEK :
FLOOR HARDENER (Project Title)
7 8 21 22
FFL : 05.60 CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN
STAIRCASE 2

>
KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,

>
CEMENT RENDER

>
SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH

>
KUALA LANGAT, SELANGOR DARUL EHSAN.

>
30 FFL : 05.80

>
>
>
UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

>

>
>

>
>
A

>
>
DP

DP
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >

>
> > > >

LIST OF CHANGES IFC02

>
GREEN AREA

>
NO. DATE DESCRIPTION APPROVED REMARKS

>

DP
Relocate IT room, lab room, office, maintenance office

>
SAFETY 1. (epoxy mortar floor finish)

>
>
SHOWER 2. Add new QC room at level 1 with fixed glass window, 1

>
LOADER XRF room with sliding door

>
Add new production support room at level 1 with fire

>
rated brick wall, fire rated door FD1, fixed glass
3.

>
window, wall mounted ventilation fan, floor trap & 1

>
water tap

>
UNLOADER

>
Floor finish for cold shell at level 2 will be changed
4.

>
from cement render to bare concrete finish

>
Add 1 male surau & 1 female surau at level 1 (epoxy

>
mortar floor) with ablution (wall & floor tiles),door D1,
LOADER OVEN

>
5. floor trap, 2 water tap & mech.ventilation for each

>
room)1500mm (ht) wall tiles with water proofing on

>
floor & wall (ablution area)

>
Additional 1 new safety shower and relocate 2 other

>
6. showers with floor trap total 3 nos.
UNLOADER

>
>
Rotate hose reel compartment at grid 3, C for level 1 and

>
2
EXISTING WATER TANK

>
7. Relocate hose rell compartment at grid 3,D to 4,D

>
LOADER

>
Relocate hose reel compartment at male toilet level 1 &
PRODUCTION AREA

>
level 2. Relocate hose reel to IT room.

TRENCH >
EPOXY MORTAR
B
MSB room at level 2 became bigger with new fire rated
8.

>
double leaf door

>
9. All wall is without skim coat (plaster & paint)

>
>
FFL : 05.80 10.
2° fall for all flat roof area (from cement screed to
UNLOADER

>
OUTGOING QC / cement render with water proofing)

>
11. New window type W3A at level 1 & level 2(corridor area)

>
PACKING 12. Additional and relocation 3 NOS of BMI compact

>
rainwater harvesting tank capacity (1100Litres/NOS)
LOADER

>
>
13. Ommit doghouse at the rooftop to relocate.Genset

>
relocate from roof to level 1

>
>
>
UNLOADER

>
>
>
>
LOADER

>
>
HAK CIPTA TERPELIHARA

>
>
Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

>
UNLOADER

>
Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.

>
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan

>
DP

selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah

>
LOADER

>
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek

>
sebelum kerja-kerja dimulakan.

>
>
> > >

COPYRIGHT
C

>
This drawing and design was generated by a CADD computer software system.

>

DP
> > > > > > >

>
>
All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.

>
BHD. and are not permitted for usage or reproduction without prior permission and are to be
SAFETY

>
returned on the completion of the project. All works are to follow the printed dimensions which are

>
to be confirmed on site. All descripencies shall be reported to the Architect before the
UNLOADER
>
>
>

>
>

SHOWER
>
>
>
>
>

commencement of works.
>
>
>
>

>
>
>
>
>
>
>
>
>
>

>
>
>
>
>
>
>
>
>

LUKISAN
>

>
>
>
>
>
>
>
>

LOADER (Drawing)
>
>

>
>
>
>
>
>
>
>
>
>
>
>
>

>
>
>
>
>

>

DP
-LEVEL 1 FLOOR PLAN

>

>

>

>
>

>
>

>
>
42 IT ROOM

>
>
DP DP DP DP DP DP

>

>
EPOXY&RAISED ACCESS FLOOR

>
QC ROOM MAINTENANCE OFFICE

>
PRODUCTION LAB ROOM OFFICE

>

>
>
SUPPORTROOM EPOXY MORTAR EPOXY MORTAR EPOXY MORTAR EPOXY MORTAR

>
>
SCALE : AS SHOWN DATE

>
>
EPOXY MORTAR FFL : 05.80

>

>
>

>

>
DRAWN BY : HKJ / IH 2023
FFL : 05.80 FFL : 05.80 FFL : 05.80 FFL : 05.80 SAFETY

>
>

>
>

>
XRF

>

>
>
FFL : 05.80 SHOWER LEAD TECHNICIAN :

>
DP

>
>
>

ROOM
> > > > > > > > > >

>
> > >
> > > >
>

>
>

MH
> > > >
> > > >
> > > >
> > > >
> > > >
> > > > >
> > >
> > >

>
> > >

D
> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
>

PROJECT MGR. : -

>
>

>
>
TOILET (F)

>
UTARA

>

>
>

>
>

>

>

>
TILES

>
PROJECT DIR. : -

>
>
SURAU (MALE)

>
>

>

>
>

>
>
GOOD LIFT

>

>
EPOXY MORTAR CHECKING DIR. : CK TEO

>

GENSET
>
>

>

>
FIRE PUMP ROOM 2 ENTRANCE

>
FFL : 05.75

>
>

>
0

>
TILES

>
>
EPOXY(WATERBASE)

>
>
OKU TOILET REVISION

>

>
>
FFL : 05.80

>

>
>
TILES

>
CHILLER ROOM SWITCH ROOM GT

>

>
CORRIDOR

>
FFL : 05.80

>
FFL : 05.60

>
DRAWING NO. :

>

>
EPOXY(WATERBASE) EPOXY(WATERBASE)

>
>
>

>
>
TLL 2

>
>

>
STAIRCASE 1 FFL : 05.75

>
DP
2022/31/AMKOR/K.LANGAT/CONST/OD/PLATING/03

>

>
>
UTARA

>
>
FFL : 05.60 CEMENT RENDER TOILET (M)

>
FFL : 05.60

>

>

>
>
TILES
> > >

>
>

11KV

>

>
>

SURAU (FEMALE)

>
TANDATANGAN PEMILIK TANAH & BANGUNAN :
FIRE PUMP ROOM 1

>

>

>
FFL : 05.80

>
>

REMOTE

>
>
>

MH

>
>

SPRINKLER EPOXY MORTAR


>

EPOXY(WATERBASE)
> >

>
FFL : 05.75
>

>
>
> >

ROOM >

>

>
DIESEL >

>
>

>
>
TANK FFL : 05.80

>
FFL : 05.60

>
>
>

>
>

>
>

DP >

>

>
>
>
>

E
>

>
>
>

.............................................................................................
TLL 1
MD ZAMAN BIN ISHAK (IC : 700115-10-6305)

STAGING AREA PENGURUS KANAN

CEMENT RENDER AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
FFL :
FFL : 05.85
H
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139

AD
RO
ING
Arkitek
(Architect)
NEW FIRE WATER TANK

IST
EX
HE
OT
1 2 3 4 5 6

TT
EC
BYG Architecture Sdn. Bhd.
55

NN
(Co. No. : 410508-H)

LEVEL 1 FLOOR PLAN 3.01, 3rd Floor, Menara MBMR,

CO
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com
DRIVEWAY

LALUAN JENTERA BOMBA-KOSONGKAN LALUAN


PREMIX Cop
RFL : 05.30 (Stamp)
53 DATE
CONSTRUCTION AUGUST 2023

DRAWING REVISION : 02
TAJUK PROJEK :
(Project Title)

CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
3°fall KUALA LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

STAIRCASE 2
CEMENT RENDER LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS


FFL : 10.65
FFL : 10.80 Relocate IT room, lab room, office, maintenance office
> > > > > > > > > > > > > > > > > > >
> > > > > > > > > > > > > > >

A 1. (epoxy mortar floor finish)

DP

DP
2. Add new QC room at level 1 with fixed glass window, 1
XRF room with sliding door

DP
Add new production support room at level 1 with fire
rated brick wall, fire rated door FD1, fixed glass
3.
window, wall mounted ventilation fan, floor trap & 1
water tap

Floor finish for cold shell at level 2 will be changed


4. from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

Additional 1 new safety shower and relocate 2 other


6. showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and


2
7. Relocate hose rell compartment at grid 3,D to 4,D
Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)

B 11.
12.
New window type W3A at level 1 & level 2(corridor area)
Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

COLD SHELL / FUTURE PRODUCTION AREA


BARE CONCRETE

FFL : 10.80
HAK CIPTA TERPELIHARA
Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
This drawing and design was generated by a CADD computer software system.
DP

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be

C returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the

DP
> commencement of works.
>

LUKISAN
>
(Drawing)
>
>

>

>
-LEVEL 2 FLOOR PLAN
>

>

>

>

>

>
>

>

SCALE : AS SHOWN DATE

DP
>

>

>
DRAWN BY : HKJ / IH 2023
>

> LEAD TECHNICIAN :

>
PROJECT MGR. : -

>
>

>
PROJECT DIR. : -
DP >

>

CHECKING DIR. : CK TEO


D
>
0
FUTURE TOILET (F)
>
REVISION
BARE CONCRETE
>
DP

FUTURE PHASE 2
GOOD LIFT
>
DRAWING NO. :
>
FFL : 10.75
> 2022/31/AMKOR/K.LANGATCONST/OD/PLATING/04
>

JANITOR
AHU ROOM MSB ROOM
>

CEMENT RENDER
FLOOR HARDENER
>

EPOXY(WATERBASE) TANDATANGAN PEMILIK TANAH & BANGUNAN :


STAIRCASE 1 FOYER
>

DP
FUTURE PHASE 2
TILING FFL : 10.80
>

FFL : 10.80 CEMENT RENDER


FFL : 10.80
>

FUTURE TOILET (M)


>

FFL : 10.80 FFL : 10.80 BARE CONCRETE


>

>

FUTURE PHASE 2
>

FFL : 10.75
>

3°fall .............................................................................................
>

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


>

E PENGURUS KANAN
>

AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


FFL : 10.65 FFL : 10.65 (NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
3°fall TEL : 03-3122 6001 FAX : 03-3122 6139

Arkitek
(Architect)

BYG Architecture Sdn. Bhd.


(Co. No. : 410508-H)
1 2 3 4 5 6 3.01, 3rd Floor, Menara MBMR,

LEVEL 2 FLOOR PLAN No.1, Jalan Syed Putra Utara,


58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

Cop
(Stamp)

DATE
CONSTRUCTION AUGUST 2023

DRAWING REVISION : 02
TAJUK PROJEK :
(Project Title)

CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
KUALA LANGAT, SELANGOR DARUL EHSAN.

A UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS

Relocate IT room, lab room, office, maintenance office


1. (epoxy mortar floor finish)

2. Add new QC room at level 1 with fixed glass window, 1


XRF room with sliding door

Add new production support room at level 1 with fire


rated brick wall, fire rated door FD1, fixed glass
3.
window, wall mounted ventilation fan, floor trap & 1
water tap

Floor finish for cold shell at level 2 will be changed


4. from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

Additional 1 new safety shower and relocate 2 other


6. showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and


2
7. Relocate hose rell compartment at grid 3,D to 4,D
B Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)
11. New window type W3A at level 1 & level 2(corridor area)
12. Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

3°fall 3°fall

HAK CIPTA TERPELIHARA


Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah

C dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
commencement of works.

LUKISAN
(Drawing)

-ROOF PLAN ( WATER TANK / UTILITY AREA)

SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023

D LEAD TECHNICIAN :

PROJECT MGR. : -
RC SLAB SPAH SPAH SPAH PROJECT DIR. : -

CHECKING DIR. : CK TEO


FLAT ROOF 0
UTILITY / WATER TANK AREA STAIRCASE 1 CEMENT RENDER REVISION
11°fall CEMENT RENDER CEMENT RENDER
FFL : 15.20 DRAWING NO. :

DP
FFL : 15.20 FFL : 15.30
2022/31/AMKOR/K.LANGAT/CONST/OD/PLATING/05

TANDATANGAN PEMILIK TANAH & BANGUNAN :

.............................................................................................

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


PENGURUS KANAN

AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139

Arkitek
(Architect)

1 2 3 4 5 6
ROOF PLAN ( SERVICE FLOOR AREA )
BYG Architecture Sdn. Bhd.
(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

Cop
(Stamp)

DATE
CONSTRUCTION AUGUST 2023

DRAWING REVISION : 02
AHU ROOM

FFL : 10.65

TAJUK PROJEK :
(Project Title)

D REMOVABLE RAILING PLAN CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
RC SLAB SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
KUALA LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.


FLAT ROOF BELOW
MSB ROOM LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS

Relocate IT room, lab room, office, maintenance office


1. (epoxy mortar floor finish)

FLAT ROOF 2. Add new QC room at level 1 with fixed glass window, 1
XRF room with sliding door

Add new production support room at level 1 with fire


FFL : 10.65 3. rated brick wall, fire rated door FD1, fixed glass
window, wall mounted ventilation fan, floor trap & 1
water tap

E 4.
Floor finish for cold shell at level 2 will be changed
from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)
SANITARY DIAGRAM REMOVABLE RAILING PLAN 6.
Additional 1 new safety shower and relocate 2 other
showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and

FLAT ROOF PLAN 7.


2
Relocate hose rell compartment at grid 3,D to 4,D
Relocate hose reel compartment at male toilet level 1 &

5 6 8.
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)
11. New window type W3A at level 1 & level 2(corridor area)
12. Additional and relocation 3 NOS of BMI compact
FFL : 10.65 rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

1 2 3 4 5 6

COLD SHELL HAK CIPTA TERPELIHARA


Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.

REMOVABLE RAILING PLAN dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
commencement of works.

LUKISAN
(Drawing)

-ROOF PLAN ( FLAT ROOF AREA)


-FRONT ELEVATION
-LEFT ELEVATION

SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023

LEAD TECHNICIAN :
REMOVABLE RAILING ELEVATION
PROJECT MGR. : -

PROJECT DIR. : -

FRONT ELEVATION CHECKING DIR. : CK TEO


0
REVISION

DRAWING NO. :

2022/31/AMKOR/K.LANGAT/CONST/OD/PLATING/06

A B C D E
TANDATANGAN PEMILIK TANAH & BANGUNAN :

.............................................................................................

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


PENGURUS KANAN

AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139

Arkitek
(Architect)

BYG Architecture Sdn. Bhd.


(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

LEFT ELEVATION Cop


(Stamp)

TYPICAL REMOVABLE RAILING SECTION CONSTRUCTION


DATE
AUGUST 2023

DRAWING REVISION : 02
E D C B A
RL : 05.30

TAJUK PROJEK :
(Project Title)

CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
KUALA LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS

Relocate IT room, lab room, office, maintenance office


1. (epoxy mortar floor finish)

2. Add new QC room at level 1 with fixed glass window, 1


XRF room with sliding door

Add new production support room at level 1 with fire


6 3. rated brick wall, fire rated door FD1, fixed glass
window, wall mounted ventilation fan, floor trap & 1
water tap

Floor finish for cold shell at level 2 will be changed


4. from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)
FFL : 05.80 Additional 1 new safety shower and relocate 2 other
6. showers with floor trap total 3 nos.
RAMP DETAIL PRODUCTION AREA
RIGHT ELEVATION Rotate hose reel compartment at grid 3, C for level 1 and
2
7. Relocate hose rell compartment at grid 3,D to 4,D
Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)

6 5 4 3 2 1 11. New window type W3A at level 1 & level 2(corridor area)
12. Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

HAK CIPTA TERPELIHARA


Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
PRODUCTION sebelum kerja-kerja dimulakan.

AREA COPYRIGHT
This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
commencement of works.

LUKISAN
(Drawing)

SECTION A-A -RIGHT ELEVATION


-REAR ELEVATION
-SECTION A-A
-RAMP DETAIL & SECTION A-A

SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023


REAR ELEVATION LEAD TECHNICIAN :

PROJECT MGR. : -

3 SWITCH ROOM
PROJECT DIR. : -

CHECKING DIR. : CK TEO


A B C D E FFL : 05.60 0
E REVISION

DRAWING NO. :

2022/31/AMKOR/K.LANGATCONST/OD/PLATING/07

TANDATANGAN PEMILIK TANAH & BANGUNAN :

RL : 05.30
RAMP DETAIL

.............................................................................................

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


PENGURUS KANAN

AHU AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


COLD SHELL/FUTURE PRODUCTION AREA (NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139
E
Arkitek
(Architect)

PRODUCTION AREA LAB ROOM FIRE PUMP ROOM 2 FIRE PUMP ROOM 1

SECTION A-A SWITCH ROOM BYG Architecture Sdn. Bhd.


(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

Cop
(Stamp)
SECTION A-A
DATE
CONSTRUCTION AUGUST 2023

DRAWING REVISION : 02
6 5 4 3 2 1

CHILLER ROOM
FFL : 05.60

TAJUK PROJEK :
(Project Title)

TYPICAL - RAMP DETAIL RL : 05.30 CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
COLD SHELL / FUTURE PRODUCTION AREA SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
KUALA LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS

Relocate IT room, lab room, office, maintenance office


PRODUCTION AREA 1. (epoxy mortar floor finish)

2. Add new QC room at level 1 with fixed glass window, 1


XRF room with sliding door

Add new production support room at level 1 with fire


rated brick wall, fire rated door FD1, fixed glass
3.
window, wall mounted ventilation fan, floor trap & 1

SECTION B-B CHILLER ROOM


water tap

Floor finish for cold shell at level 2 will be changed


4. from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
A B C D E room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

Additional 1 new safety shower and relocate 2 other


6. showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and


SECTION A-A 2
7. Relocate hose rell compartment at grid 3,D to 4,D
Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
SPAH
UTILITY/WATER TANK AREA 10. cement render with water proofing)
11. New window type W3A at level 1 & level 2(corridor area)
12. Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

COLD SHELL / FUTURE PRODUCTION AREA MSB ROOM


HAK CIPTA TERPELIHARA
Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
PRODUCTION AREA SURAU MALE SURAU FEMALE This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
SECTION C-C commencement of works.

FFL : 05.80 LUKISAN


STAGING AREA (Drawing)

-SECTION B-B
A B C D E -SECTON C-C
-SECTION D-D
-WASTE WATER SUMP DETAIL
-RAMP DETAIL & SECTION A-A
-TYPICAL ROOF DETAIL & INSULATION DETAIL

SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023

LEAD TECHNICIAN :

FLAT ROOF PROJECT MGR. : -

PROJECT DIR. : -

CHECKING DIR. : CK TEO


0
REVISION

DRAWING NO. :
COLD SHELL / FUTURE PRODUCTION AREA FOYER 2022/31/AMKOR/K.LANGAT/CONST/OD/PLATING/08

TANDATANGAN PEMILIK TANAH & BANGUNAN :

PRODUCTION AREA ENTRANCE


RAMP DETAIL DRIVEWAY .............................................................................................
PREMIX MD ZAMAN BIN ISHAK (IC : 700115-10-6305)
RFL : 05.30 PENGURUS KANAN

SECTION D - D AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139

E
Arkitek
(Architect)

ENTRANCE STAGING BYG Architecture Sdn. Bhd.


AREA AREA (Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com
SECTION A-A
Cop
(Stamp)

DATE
PARAPET ROOF DETAIL CONSTRUCTION AUGUST 2023
INSULATION DETAIL
ROOF/GUTTER OVERFLOW DETAIL DRAWING REVISION : 02
EL
NC
CA
TAJUK PROJEK :
(Project Title)

CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
KUALA LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS

Relocate IT room, lab room, office, maintenance office


1. (epoxy mortar floor finish)

2. Add new QC room at level 1 with fixed glass window, 1


XRF room with sliding door

Add new production support room at level 1 with fire


rated brick wall, fire rated door FD1, fixed glass
3.
window, wall mounted ventilation fan, floor trap & 1
water tap

Floor finish for cold shell at level 2 will be changed


4. from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

Additional 1 new safety shower and relocate 2 other


6. showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and


2
7. Relocate hose rell compartment at grid 3,D to 4,D
Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)
11. New window type W3A at level 1 & level 2(corridor area)
12. Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

HAK CIPTA TERPELIHARA


Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
commencement of works.

LUKISAN
(Drawing)

E -DOOR & WINDOW SCHEDULE


-RC COPPING DETAIL
-TRENCHES DETAIL
EL
NC
CA

SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023

LEAD TECHNICIAN :

6 PROJECT MGR. : -

PROJECT DIR. : -

INSIDE OUTSIDE CHECKING DIR. : CK TEO


0
INSIDE OUTSIDE REVISION

DRAWING NO. :

2022/31/AMKOR/K.LANGAT/CONST/OD/PLATING/09

TANDATANGAN PEMILIK TANAH & BANGUNAN :

.............................................................................................

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


OUTSIDE INSIDE PENGURUS KANAN

AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139

INSIDE OUTSIDE
Arkitek
INSIDE OUTSIDE (Architect)

RC COPPING-DETAIL
BYG Architecture Sdn. Bhd.
(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
RC COPPING-DETAIL 58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com
TRENCHES DETAIL
TRENCHES DETAIL WASTE WATER SUMP DETAIL RC COPPING-DETAIL
Cop
(Stamp)

DATE
CONSTRUCTION AUGUST 2023

DRAWING REVISION : 02
TAJUK PROJEK :
(Project Title)

CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


RESERVE AREA FOR WATER JET PUMP, SCRUBBER, KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
BLOWER & WW SUMP SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
STAIRCASE 2 KUALA LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS

Relocate IT room, lab room, office, maintenance office


1. (epoxy mortar floor finish)

2. Add new QC room at level 1 with fixed glass window, 1


SAFETY XRF room with sliding door

SHOWER Add new production support room at level 1 with fire


rated brick wall, fire rated door FD1, fixed glass
3.
window, wall mounted ventilation fan, floor trap & 1
water tap

Floor finish for cold shell at level 2 will be changed


4. from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

Additional 1 new safety shower and relocate 2 other


6. showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and


2
7. Relocate hose rell compartment at grid 3,D to 4,D
Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)
11. New window type W3A at level 1 & level 2(corridor area)
12. Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

PRODUCTION AREA
HAK CIPTA TERPELIHARA
Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
commencement of works.

LUKISAN
SAFETY (Drawing)

SHOWER
-LEVEL 1 FLOOR PLAN

SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023

QC ROOM LEAD TECHNICIAN :


MAINTENANCE IT ROOM
PRODUCTION LAB ROOM OFFICE PROJECT MGR. : -
ROOM
SUPPORT RM XRF PROJECT DIR. : -
SAFETY
RM
SHOWER CHECKING DIR. : CK TEO
0
REVISION

SURAU TOILET
DRAWING NO. :
(MALE) (FEMALE)
FIRE PUMP ROOM 2 2022/31/AMKOR/K.LANGAT/CONST/FF/PLATING/10

TANDATANGAN PEMILIK TANAH & BANGUNAN :


CHILLER ROOM SWITCH ROOM OKU

SURAU
FIRE PUMP ROOM 1 (FEMALE) ENTRANCE TOILET
(MALE) .............................................................................................

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


PENGURUS KANAN

AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
STAGING TEL : 03-3122 6001 FAX : 03-3122 6139

AREA
STAIRCASE 1
Arkitek
(Architect)

LEVEL 1 FLOOR PLAN-FLOOR FINISHES

BYG Architecture Sdn. Bhd.


(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

Cop
(Stamp)

DATE
CONSTRUCTION AUGUST 2023

DRAWING REVISION : 02
STAIRCASE 2 3°fall

TAJUK PROJEK :
(Project Title)

CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
KUALA LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS

Relocate IT room, lab room, office, maintenance office


1. (epoxy mortar floor finish)

2. Add new QC room at level 1 with fixed glass window, 1


XRF room with sliding door

Add new production support room at level 1 with fire


rated brick wall, fire rated door FD1, fixed glass
3.
window, wall mounted ventilation fan, floor trap & 1
water tap

Floor finish for cold shell at level 2 will be changed


4. from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

Additional 1 new safety shower and relocate 2 other


6. showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and


2
7. Relocate hose rell compartment at grid 3,D to 4,D
Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)
11. New window type W3A at level 1 & level 2(corridor area)
COLD SHELL/FUTURE PRODUCTION AREA 12. Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

HAK CIPTA TERPELIHARA


Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
commencement of works.

LUKISAN
(Drawing)

-LEVEL 2 FLOOR PLAN


-ROOF PLAN

TOILET
(FEMALE)
SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023

LEAD TECHNICIAN :
JANITOR
AHU ROOM MSB ROOM FOYER PROJECT MGR. : -

PROJECT DIR. : -

CHECKING DIR. : CK TEO


0
TOILET
REVISION
(MALE)
3°fall DRAWING NO. :

2022/31/AMKOR/K.LANGAT/TENDER/FF/PLATING/11

TANDATANGAN PEMILIK TANAH & BANGUNAN :


3°fall

STAIRCASE 1

.............................................................................................

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


PENGURUS KANAN

AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139

SPAH SPAH SPAH


Arkitek
(Architect)

UTILITY / WATER TANK AREA FLAT ROOF

BYG Architecture Sdn. Bhd.


(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

Cop
(Stamp)

ROOF PLAN-FLOOR FINISHES CONSTRUCTION


DATE
AUGUST 2023
STAIRCASE 1 DRAWING REVISION : 02
TAJUK PROJEK :
(Project Title)

CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
RESERVE AREA FOR WATER JET PUMP, SCRUBBER,
SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
STAIRCASE 2 BLOWER & WW SUMP KUALA LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS

Relocate IT room, lab room, office, maintenance office


1. (epoxy mortar floor finish)

2. Add new QC room at level 1 with fixed glass window, 1


SAFETY XRF room with sliding door

Add new production support room at level 1 with fire


SHOWER 3. rated brick wall, fire rated door FD1, fixed glass
window, wall mounted ventilation fan, floor trap & 1
water tap

Floor finish for cold shell at level 2 will be changed


4. from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

Additional 1 new safety shower and relocate 2 other


6. showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and


2
7. Relocate hose rell compartment at grid 3,D to 4,D
Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)
11. New window type W3A at level 1 & level 2(corridor area)
12. Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

PRODUCTION AREA
HAK CIPTA TERPELIHARA
Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
commencement of works.

LUKISAN
(Drawing)

-WALL KEY PLAN


LEVEL 1 FLOOR PLAN
SAFETY
SHOWER

SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023


QC ROOM
PRODUCTION IT ROOM LEAD TECHNICIAN :
MAINTENANCE
SUPPORT LAB ROOM ROOM OFFICE PROJECT MGR. : -
ROOM XRF SAFETY PROJECT DIR. : -

ROOM SHOWER CHECKING DIR. : CK TEO


0
REVISION
TOILET
SURAU (FEMALE) DRAWING NO. :
(MALE)
FIRE PUMP ROOM 2 2022/31/AMKOR/K.LANGAT/CONST/WF/PLATING/12

CHILLER ROOM SWITCH ROOM OKU


TANDATANGAN PEMILIK TANAH & BANGUNAN :

SURAU
FIRE PUMP ROOM 1 (FEMALE)
.............................................................................................
TOILET MD ZAMAN BIN ISHAK (IC : 700115-10-6305)
(MALE) PENGURUS KANAN

AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
STAGING TEL : 03-3122 6001 FAX : 03-3122 6139

LEVEL 1 FLOOR PLAN AREA


STAIRCASE 1
Arkitek
(Architect)

BYG Architecture Sdn. Bhd.


(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

Cop
(Stamp)

DATE
CONSTRUCTION AUGUST 2023

DRAWING REVISION : 02
STAIRCASE 2 3°fall

TAJUK PROJEK :
(Project Title)

CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
KUALA LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS

Relocate IT room, lab room, office, maintenance office


1. (epoxy mortar floor finish)

2. Add new QC room at level 1 with fixed glass window, 1


XRF room with sliding door

Add new production support room at level 1 with fire


rated brick wall, fire rated door FD1, fixed glass
3.
window, wall mounted ventilation fan, floor trap & 1
water tap

Floor finish for cold shell at level 2 will be changed


4. from cement render to bare concrete finish

Add 1 male surau & 1 female surau at level 1 (epoxy


mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

Additional 1 new safety shower and relocate 2 other


6. showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and


2
7. Relocate hose rell compartment at grid 3,D to 4,D
Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)
11. New window type W3A at level 1 & level 2(corridor area)
COLD SHELL/FUTURE PRODUCTION AREA 12. Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

HAK CIPTA TERPELIHARA


Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
commencement of works.

LUKISAN
(Drawing)

WALL KEY PLAN


-LEVEL 2 FLOOR PLAN
-ROOF PLAN
TOILET
(FEMALE)
SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023

LEAD TECHNICIAN :
AHU ROOM JANITOR
MSB ROOM FOYER PROJECT MGR. : -

PROJECT DIR. : -

CHECKING DIR. : CK TEO


0
TOILET REVISION
(MALE)
3°fall DRAWING NO. :

2022/31/AMKOR/K.LANGAT/CONST/WF/PLATING/13

LEVEL 2 FLOOR PLAN TANDATANGAN PEMILIK TANAH & BANGUNAN :


3°fall

STAIRCASE 1

.............................................................................................

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


PENGURUS KANAN

AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139

SPAH SPAH SPAH


Arkitek
(Architect)

UTILITY / WATER TANK AREA FLAT ROOF

BYG Architecture Sdn. Bhd.


(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

Cop
(Stamp)
ROOF PLAN ( LIFT MOTOR ROOM ) CONSTRUCTION
DATE
STAIRCASE 1 AUGUST 2023

DRAWING REVISION : 02
CEILING DETAIL

3°fall TAJUK PROJEK :


(Project Title)

STAIRCASE 2 STAIRCASE 2 CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
KUALA LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS

Relocate IT room, lab room, office, maintenance office


1. (epoxy mortar floor finish)

2. Add new QC room at level 1 with fixed glass window, 1


XRF room with sliding door

Add new production support room at level 1 with fire


rated brick wall, fire rated door FD1, fixed glass
3.
window, wall mounted ventilation fan, floor trap & 1
water tap

Floor finish for cold shell at level 2 will be changed


PRODUCTION AREA 4. from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
COLD SHELL/FUTURE PRODUCTION AREA 5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

Additional 1 new safety shower and relocate 2 other


6. showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and


2
7. Relocate hose rell compartment at grid 3,D to 4,D
Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)
11. New window type W3A at level 1 & level 2(corridor area)
12. Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

PRODUCTION LAB ROOM QC ROOM MAINTENANCE OFFICE IT ROOM


SUPPORT ROOM OFFICE

XRF
ROOM
TOILET
(FEMALE) TOILET (FEMALE) HAK CIPTA TERPELIHARA
SURAU (M) Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.
FIRE PUMP ROOM 2
Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
TOILET selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
(OKU) AHU ROOM MSB ROOM FOYER JANITOR dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
CHILLER ROOM SWITCH ROOM
ENTRANCE sebelum kerja-kerja dimulakan.

SURAU (F) TOILET COPYRIGHT


FIRE PUMP ROOM 1 SPRINKLER
11KV REMOTE (MALE) STAIRCASE 1 TOILET (MALE) This drawing and design was generated by a CADD computer software system.
ROOM STAIRCASE 1 FLAT ROOF
DIESEL
3°fall
TANK All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
LEVEL 2 FLOOR PLAN commencement of works.
LEVEL 1 FLOOR PLAN 3°fall
ROOF PLAN ( LIFT MOTOR ROOM )
LUKISAN
(Drawing)

-CEILING DETAIL & SURAU DETAIL

SURAU DETAIL
4 SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023

LEAD TECHNICIAN :
DP
PROJECT MGR. : -

PROJECT DIR. : -
D
CHECKING DIR. : CK TEO
0
REVISION

SURAU MALE
EPOXY MORTAR DRAWING NO. :

2022/31/AMKOR/K.LANGAT/CONST/CDS/PLATING/14
FFL : 05.80
D E 4 4
TANDATANGAN PEMILIK TANAH & BANGUNAN :

.............................................................................................

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


PENGURUS KANAN

SURAU FEMALE AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


EPOXY MORTAR (NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
FFL : 05.80 TEL : 03-3122 6001 FAX : 03-3122 6139

Arkitek
(Architect)
DP

E
SURAU DETAIL-SECTION A-A SURAU (FEMALE) DETAIL-SECTION B-B SURAU (FEMALE) DETAIL- SECTION C-C

SURAU FLOOR PLAN


BYG Architecture Sdn. Bhd.
(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

Cop
(Stamp)

DATE
CONSTRUCTION AUGUST 2023

DRAWING REVISION : 02
D E

TOILET (F)
TILES
TAJUK PROJEK :
(Project Title)

FFL : 05.75
D
CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN
KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
KUALA LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS

OKU TOILET 1.
Relocate IT room, lab room, office, maintenance office
(epoxy mortar floor finish)
TILES Add new QC room at level 1 with fixed glass window, 1
2.
XRF room with sliding door

Add new production support room at level 1 with fire


FFL : 05.75 3. rated brick wall, fire rated door FD1, fixed glass
window, wall mounted ventilation fan, floor trap & 1
water tap

Floor finish for cold shell at level 2 will be changed


4. from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

TOILET DETAIL-SECTION A-A 6.


Additional 1 new safety shower and relocate 2 other
showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and


2
7. Relocate hose rell compartment at grid 3,D to 4,D
Relocate hose reel compartment at male toilet level 1 &

D E
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)

TOILET (M) 11.


12.
New window type W3A at level 1 & level 2(corridor area)
Additional and relocation 3 NOS of BMI compact
TILES rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1
ENTRANCE FFL : 05.75
TILES

FFL : 05.80

E HAK CIPTA TERPELIHARA


Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
TOILET DETAIL-FLOOR PLAN to be confirmed on site. All descripencies shall be reported to the Architect before the

6 commencement of works.

LUKISAN
(Drawing)

-TOILET DETAIL
-WATER PROOFING AND DROP DETAIL

TOILET DETAIL-SECTION B-B SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023

LEAD TECHNICIAN :

PROJECT MGR. : -

PROJECT DIR. : -

6 5 6 6 CHECKING DIR. : CK TEO


0
REVISION

DRAWING NO. :

2022/31/AMKOR/K.LANGAT/CONST/OD/PLATING/15

TANDATANGAN PEMILIK TANAH & BANGUNAN :

.............................................................................................

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


PENGURUS KANAN

AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139

Arkitek
(Architect)

BYG Architecture Sdn. Bhd.


(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
TOILET DETAIL-SECTION C-C TOILET DETAIL-SECTION D-D TOILET DETAIL-SECTION E-E No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

Cop
(Stamp)

DATE
CONSTRUCTION AUGUST 2023

DRAWING REVISION : 02
D E 6 5

FUTURE TOILET (F)


CEMENT RENDER

FFL : 10.75 TAJUK PROJEK :


(Project Title)

CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
KUALA LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.


FOYER
CEMENT RENDER
JANITOR LIST OF CHANGES IFC02

FFL : 10.80 CEMENT RENDER NO. DATE DESCRIPTION APPROVED REMARKS

Relocate IT room, lab room, office, maintenance office


1. (epoxy mortar floor finish)

FFL : 10.80 2. Add new QC room at level 1 with fixed glass window, 1
XRF room with sliding door

Add new production support room at level 1 with fire


rated brick wall, fire rated door FD1, fixed glass
3.
window, wall mounted ventilation fan, floor trap & 1
water tap

Floor finish for cold shell at level 2 will be changed


4.
TOILET DETAIL-SECTION A-A TOILET DETAIL-SECTION B-B from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

Additional 1 new safety shower and relocate 2 other


6. showers with floor trap total 3 nos.

6 6 Rotate hose reel compartment at grid 3, C for level 1 and


2
FUTURE TOILET (M) 7. Relocate hose rell compartment at grid 3,D to 4,D

CEMENT RENDER Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door

3°fall FFL : 10.75 9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)
11. New window type W3A at level 1 & level 2(corridor area)
12. Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

HAK CIPTA TERPELIHARA


Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

3°fall Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
commencement of works.

TOILET DETAIL-LEVEL 2 LUKISAN


(Drawing)

-TOILET DETAIL
TOILET DETAIL-SECTION C-C TOILET DETAIL-SECTION D-D -WATER PROOFING AND DROP DETAIL

SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023

LEAD TECHNICIAN :

PROJECT MGR. : -

PROJECT DIR. : -

CHECKING DIR. : CK TEO


0
REVISION

DRAWING NO. :

2022/31/AMKOR/K.LANGAT/CONST/OD/PLATING/16

TANDATANGAN PEMILIK TANAH & BANGUNAN :

200 200
300

CL CL
TYPICAL WATERPROOFING TYPICAL WATERPROOFING - UPSTAND DETAIL .............................................................................................

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


PENGURUS KANAN
50

50

AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139

Arkitek
(Architect)

BYG Architecture Sdn. Bhd.


(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

TYPICAL SCUPPER DRAIN SCUPPER DRAIN-UTILITY / WATER TANK TYPICAL FLOOR TRAP DETAIL STAGING & TOILET WATER PROOFING DETAIL FLAT ROOF, LOADING PLATFORM & SCUPPER DRAIN Cop
(Stamp)

DATE
CONSTRUCTION AUGUST 2023

DRAWING REVISION : 02
D D D

TAJUK PROJEK :
(Project Title)

CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
STAIRCASE 1 STAIRCASE 1 SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
CEMENT RENDER CEMENT RENDER STAIRCASE 1 KUALA LANGAT, SELANGOR DARUL EHSAN.
CEMENT RENDER
FFL : 10.80 UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.
FFL : 05.80
FFL : 15.30
LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS

Relocate IT room, lab room, office, maintenance office


1. (epoxy mortar floor finish)

2. Add new QC room at level 1 with fixed glass window, 1


XRF room with sliding door

Add new production support room at level 1 with fire


rated brick wall, fire rated door FD1, fixed glass
3.
window, wall mounted ventilation fan, floor trap & 1
water tap

Floor finish for cold shell at level 2 will be changed


4. from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

Additional 1 new safety shower and relocate 2 other


6. showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and


2

E E E E 7. Relocate hose rell compartment at grid 3,D to 4,D


Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)
11. New window type W3A at level 1 & level 2(corridor area)
12. Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

5 5 5 5
HAK CIPTA TERPELIHARA
Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.
STAIRCASE 1 DETAIL - LEVEL 1 FLOOR PLAN STAIRCASE 1 DETAIL - LEVEL 2 FLOOR PLAN STAIRCASE 1 DETAIL -ROOF PLAN (SERVICE FLOOR AREA) STAIRCASE 1 DETAIL - FLAT ROOF Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
D E E 5 5 dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
commencement of works.

LUKISAN
(Drawing)

- STAIRCASE 1 DETAIL

SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023

LEAD TECHNICIAN :

PROJECT MGR. : -

PROJECT DIR. : -

CHECKING DIR. : CK TEO


0
REVISION

DRAWING NO. :
2022/31/AMKOR/K.LANGAT/CONST/SD/PLATING/17

TANDATANGAN PEMILIK TANAH & BANGUNAN :

.............................................................................................

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


PENGURUS KANAN

AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139

Arkitek
(Architect)

BYG Architecture Sdn. Bhd.


(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

Cop
(Stamp)

DATE
CONSTRUCTION AUGUST 2023
STAIRCASE 1 DETAIL - SECTION A-A STAIRCASE 1 DETAIL - SECTION A-A STAIRCASE 1 DETAIL - SECTION C-C STAIRCASE 1 DETAIL - SECTION D-D DRAWING REVISION : 02
TAJUK PROJEK :
(Project Title)

STAIRCASE 2 STAIRCASE 2 CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN


CEMENT RENDER CEMENT RENDER KILANG 2 TINGKAT DI ATAS SEBAHAGIAN LOT 4825,
SEKSYEN 3, BANDAR TELOK PANGLIMA GARANG, DAERAH
FFL : 05.80 FFL : 10.80 KUALA LANGAT, SELANGOR DARUL EHSAN.

UNTUK TETUAN AMKOR TECHNOLOGY MALAYSIA SDN BHD.

LIST OF CHANGES IFC02

NO. DATE DESCRIPTION APPROVED REMARKS

A A A 1.
Relocate IT room, lab room, office, maintenance office
(epoxy mortar floor finish)

2. Add new QC room at level 1 with fixed glass window, 1


XRF room with sliding door
1 1 1 Add new production support room at level 1 with fire
rated brick wall, fire rated door FD1, fixed glass
STAIRCASE 2 DETAIL - LEVEL 1 FLOOR PLAN STAIRCASE 2 DETAIL - LEVEL 2 FLOOR PLAN STAIRCASE 2 DETAIL - ROOF PLAN
3.
window, wall mounted ventilation fan, floor trap & 1
water tap

Floor finish for cold shell at level 2 will be changed


4. from cement render to bare concrete finish
Add 1 male surau & 1 female surau at level 1 (epoxy
mortar floor) with ablution (wall & floor tiles),door D1,
5. floor trap, 2 water tap & mech.ventilation for each
room)1500mm (ht) wall tiles with water proofing on
floor & wall (ablution area)

Additional 1 new safety shower and relocate 2 other


6. showers with floor trap total 3 nos.

Rotate hose reel compartment at grid 3, C for level 1 and


2

1 1 7. Relocate hose rell compartment at grid 3,D to 4,D


Relocate hose reel compartment at male toilet level 1 &
level 2. Relocate hose reel to IT room.
MSB room at level 2 became bigger with new fire rated
8. double leaf door
A A 9. All wall is without skim coat (plaster & paint)
2° fall for all flat roof area (from cement screed to
10. cement render with water proofing)
11. New window type W3A at level 1 & level 2(corridor area)
12. Additional and relocation 3 NOS of BMI compact
rainwater harvesting tank capacity (1100Litres/NOS)

13. Ommit doghouse at the rooftop to relocate.Genset


relocate from roof to level 1

HAK CIPTA TERPELIHARA


Lukisan dan rekaan projek ini disediakan dengan bantuan komputer melalui sistem CADD.

Semua lukisan, rekaan dan spesifikasi tercetak adalah hakmilik BYG ARCHITECTURE SDN. BHD.
dan tidak boleh diguna atau ditiru tanpa kebenaran daripadanya dan juga mestilah dikembalikan
selepas tamatnya projek tersebut. Kerja-kerja hendaklah mengikut dimensi yang ada didalam rajah
dan disahkan di tapak juga. Sebarang perbezaan hendaklah dilaporkan dengan segera kepada Akitek
sebelum kerja-kerja dimulakan.

COPYRIGHT
This drawing and design was generated by a CADD computer software system.

All drawings, designs and printed specifications are the copyright of BYG ARCHITECTURE SDN.
BHD. and are not permitted for usage or reproduction without prior permission and are to be
returned on the completion of the project. All works are to follow the printed dimensions which are
to be confirmed on site. All descripencies shall be reported to the Architect before the
commencement of works.

LUKISAN
(Drawing)

- STAIRCASE 2 DETAIL

SCALE : AS SHOWN DATE

DRAWN BY : HKJ / IH 2023

LEAD TECHNICIAN :

PROJECT MGR. : -

PROJECT DIR. : -

CHECKING DIR. : CK TEO


0
REVISION

DRAWING NO. :

2022/31/AMKOR/K.LANGAT/CONST/SD/PLATING/18

TANDATANGAN PEMILIK TANAH & BANGUNAN :

STAIRCASE 2 DETAIL - SECTION A-A STAIRCASE 2 DETAIL - SECTION B-B STAIRCASE 1 DETAIL - SECTION C-C STAIRCASE 1 DETAIL - SECTION D-D

.............................................................................................

MD ZAMAN BIN ISHAK (IC : 700115-10-6305)


PENGURUS KANAN

AMKOR TECHNOLOGY MALAYSIA SDN. BHD.


(NO. SYARIKAT : 197301002216 (15702-X)
15KM, JALAN KLANG-BANTING, TELOK PANGLIMA GARANG (FIZ),
KUALA LANGAT, 42507 SELANGOR DARUL EHSAN
TEL : 03-3122 6001 FAX : 03-3122 6139

Arkitek
(Architect)

BYG Architecture Sdn. Bhd.


(Co. No. : 410508-H)
3.01, 3rd Floor, Menara MBMR,
No.1, Jalan Syed Putra Utara,
58000 Kuala Lumpur, Malaysia

TEL : 03 - 2276 6676 FAX : 03 - 2276 4086


www.byggroup.com

Cop
(Stamp)

DATE
CONSTRUCTION AUGUST 2023
TYPICAL STAIRCASE RAILING DETAIL TYPICAL STAIRCASE SCUPPER DRAIN DETAIL
DRAWING REVISION : 02

You might also like