You are on page 1of 1

POWER TOOLS AUDIT CHECK LIST

Project No. : ______________


Tools Type: Date: Equip Name: Equip Name: Equip Name: Equip Name: Equip Name: Equip Name: Equip Name: Equip Name: Equip Name: Equip Name:

Equip ID: Equip ID: Equip ID: Equip ID: Equip ID: Equip ID: Equip ID: Equip ID: Equip ID: Equip ID:

SR. # DESCRIPTION YES NO N.A. YES NO N.A. YES NO N.A. YES NO N.A. YES NO N.A. YES NO N.A. YES NO N.A. YES NO N.A. YES NO N.A. YES NO N.A.

1 VALID INSPECTION TAG IS ATTACHED WITH THE TOOL

2 POWER TOOLS PROPERLY INSULATED AND SECURED

3 CONNECTION SOCKET IS IN SAFE WORKING CONDITION

4 POWER SUPPLY CABLE CONNECTED WITH THE TOOL IS IN


ACCEPTABLE WORKING CONDITION
5 SAFE GUARD HAS BEEN PROVIDED FOR MOVING PARTS

6 CUTTING DISK HAS BEEN PROPERLY FITTED


THE HANDLE OF POWER TOOL IS IN RELIABLE WORKING
7
CONDITION
THE ATTACHED POWER DISTRIBUTION BOARDS ARE PROPERLY
8
SECURED
THE CIRCUIT BREAKER HAS BEEN PROVIDED WITH THE POWER
9
SUPPLY CIRCUIT
THE POWER DISTRIBUTION BOX HAS BEEN CONNECTED WITH
10
EARTHING DEVICE

Inspected By: Approved by Incharge E&P:

This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly prohibited. © Copyrights Ordinance 2002, All rights reserved.

You might also like