SPECIAL ATTACHMENTS
BIDDER MUST ENSURE THAT REQUIRED ANNEXURES ARE ACCURATELY AND COMPREHENSIVELY
● COMPLETED
THE CORRECT REQUIRED NUMBER OF COMMERCIAL AND TECHNICAL COPIES MUST BE SUBMITTED WITH
● THE BID
● FAILURE TO COMPLY WITH ALL REQUIREMENTS WILL LEAD TO REJECTION OF THE BID
ANNEXURES:
A. SCOPE OF SUPPLY – MATERIAL REQUISITION (separate attachment)
Sasol Petroleum Mozambique LIMITADA MASTER TERMS AND CONDITIONS FOR EQUIPMENT AND COMMODITIES
B. (separate attachment)
F. FORM OF OFFER
G. DECLARATION OF COMPLIANCE
ANNEXURE C
Below are the prices for the materials/goods described in accordance with the specifications in the Scope of Supply
Document – Annexure “A”
10 License for Windows Server 2019 Stb, 64 bit, 16 Core 25 000,00 25 000,00
1
KVM Startech 8 Port Rackmount KVM Console w/ 6ft
Cables - Integrated KVM Switch w/ 19" LCD Monitor -
11 1 70 000,00 70 000,00
Fully Featured 1U LCD KVM Drawer- OSD KVM -
Durable 50,000 MTBF - USB + VGA Support
Signed
Date 12/09/22
PSA PRODUCTION FACILITY & CPF MODIFICATIONS PROJECT
Request for Quotation No: 6/26793/48
DESCRIPTION - CCTV SYSTEM PSA
ANNEXURE D
Indicate below the lump sum price for the itemised materials as per Annexure C, and include the lump sum prices for
the following:
Signed
Date 12/09/22
PSA PRODUCTION FACILITY & CPF MODIFICATIONS PROJECT
Request for Quotation No: 6/26793/48
DESCRIPTION - CCTV SYSTEM PSA
ANNEXURE E
This form MUST be completed by the Bidder and returned with the quotation - Failure to complete this
document may invalidate the Bidders quotation
Fax Number
Address details
Telephone Number
Contact Name
e-Mail address
Yes / No
Can above Manufacturing facility provide ALL
components (if NO, provide details)
Confirm
Payment Milestones: Compliance:
90% on delivery of goods
10% on approval of final documents
Yes No Proposed:
Delivery Terms (INCOTERMS 2020) - DAP Temane Confirm
YES
South African / Mozambican bidders Compliance:
Delivery Terms INTERNATIONAL BIDDERS ONLY FOB Ex Works FCA
Lead Time - from date of Purchase Order to date of
Delivery
Applicable Law - South African Yes / No
Detail of holidays, shut down periods, etc
Confirm Comments
Print Name
Signed
Date
PSA PRODUCTION FACILITY & CPF MODIFICATIONS PROJECT
Request for Quotation No: 6/26793/48
DESCRIPTION - CCTV SYSTEM PSA
ANNEXURE F
FORM OF OFFER
Having examined the Sasol Petroleum Mozambique Limitada Master Terms and Conditions for Equipment and
Commodities, Specifications and all other documentation contained in the Request for Quotation document for the above
named WORK and having satisfied ourselves as to the Site and other conditions applicable, we the undersigned, offer to
carry out the whole of the WORK in conformity with the said Request for Quotation (RFQ) document for the sum of
amount in words
Excluding VAT or such other sum as may be ascertained in terms of the Contract.
We undertake to commence the WORK on receipt of your formal instruction to proceed and to complete and hand over
the whole of the WORK in accordance with the agreed programme.
If our Quotation is accepted we will, unless otherwise instructed, within 21 (twenty one) days of PURCHASE ORDER award,
promptly provide the guarantee of a Banking Institution (in a form to be approved by Sasol Petroleum Mozambique
Limitada to be jointly and severally bound with Sasol Petroleum Mozambique Limitada in a sum not exceeding 10% (ten
percent) of the Total PURCHASE ORDER value for the due performance of the PURCHASE ORDER
We agree to abide by the Sasol Petroleum Mozambique Limitada Master Terms and Conditions for Equipment and
Commodities of this Request for Quotation Document for a period of 90 days (subject to agreed escalations) from the
closing date and undertake that it will not be withdrawn and shall remain open for acceptance by you up to the expiry of
the said 90 days.
Print Name
Signed
Designation
Company Name
Address
e-mail address
Tel No
PSA PRODUCTION FACILITY & CPF MODIFICATIONS PROJECT
Request for Quotation No: 6/26793/48
DESCRIPTION - CCTV SYSTEM PSA
ANNEXURE G
DECLARATION OF COMPLIANCE
The BIDDER hereby certifies that he has reviewed all the documents, material requisition, data sheets, drawings and
Sasol Petroleum Mozambique Limitada Master Terms and Conditions for Equipment and Commodities making up this
Request for Quotation (RFQ) and declares that:
A. "Our quotation is in exact accordance with the specifications, drawings, requirements, Sasol Petroleum Mozambique
A. Limitada Master Terms and Conditions for Equipment and Commodities and other documents and requirements of
this RFQ with NO EXCEPTIONS."
OR
B. "Our quotation is in exact accordance with the specifications, drawings, requirements, Sasol Petroleum Mozambique
Limitada Master Terms and Conditions for Equipment and Commodities and other documents and requirements of
B.
this QR with no exceptions EXCEPT for the specific exceptions listed by BIDDER in their quotation under the title
“SCHEDULE OF DEVIATIONS” (Annexures H and S) separate Technical and Commercial sections respectively. Reference
to the document being deviated from must be made such as material requisition(s), specifications, drawings, Sasol
Petroleum Mozambique Limitada Master Terms and Conditions for Equipment and Commodities and other
documents and requirements included or attached to this Request for Quotation (RFQ). "
Signed
For and on behalf of the BIDDER
Designation
Date
PSA PRODUCTION FACILITY & CPF MODIFICATIONS PROJECT
Request for Quotation No: 6/26793/48
DESCRIPTION - CCTV SYSTEM PSA
ANNEXURE H
Should BIDDER wish to deviate from or propose modifications to any of the Material Requisition, Specifications, Schedule of
Quantities or Drawings, or to qualify his quotation in any way, Such deviations, modifications or exceptions shall clearly be
stated in the schedule below, alternatively, clearly set out in a covering letter attached to BIDDERS quotation and referred
thereto below, failing which the quotation will be deemed to be unqualified.
Technical Deviations
Document and Page Clause or Item Proposed Alteration / Deviation
Print Name
Signed
Date
PSA PRODUCTION FACILITY & CPF MODIFICATIONS PROJECT
Request for Quotation No: 6/26793/48
DESCRIPTION - CCTV SYSTEM PSA
ANNEXURE I
Detailed below are all SUB-SUPPLIERS that the BIDDER proposes to employ for the supply and/or execution of any part of
the Works, together with a description of the work he proposes to sub-contract to each. Notwithstanding the listing of any
SUB-SUPPLIER below, the BIDDER shall, in terms of the relevant clause in the Sasol Petroleum Mozambique Limitada Master
Terms and Conditions for Equipment and Commodities obtain the written approval of the BUYER before entering into any
such arrangement.
Print Name
Signed
Date
PSA PRODUCTION FACILITY & CPF MODIFICATIONS PROJECT
Request for Quotation No: 6/26793/48
DESCRIPTION - CCTV SYSTEM PSA
ANNEXURE J
The prices stated below shall be included in the Schedule of Prices - Lump Sum (Annexure D) and the Form of Offer
(Annexure F) and will be taken into account in the overall evaluation of the Bid.
Qty Item Description & reference Mnft Unit Cost Total Cost
Drilling Tools Bochs
Camera AXIS
TOTAL 0,00
Should space above be insufficient or the format be unsuitable, the BIDDER is required to furnish the information on
other suitable pages and refer thereto above.
Signed
Date 12/09/22
PSA PRODUCTION FACILITY & CPF MODIFICATIONS PROJECT
Request for Quotation No: 6/26793/48
DESCRIPTION - CCTV SYSTEM PSA
ANNEXURE K
Detailed below are the spare parts necessary for two years operation of the Plant together with their current prices. Bidder to
indicate length of time prices will remain firm, thereafter subject to negotiation.
Qty Item Description & reference Mnft Unit Cost Total Cost
TOTAL 0,00
Should space above be insufficient or the format be unsuitable, the BIDDER is required to furnish the information on
other suitable pages and refer thereto above.
Print Name
Signed
Date
PSA PRODUCTION FACILITY & CPF MODIFICATIONS PROJECT
Request for Quotation No: 6/26793/48
DESCRIPTION - CCTV SYSTEM PSA
ANNEXURE L
Detailed below are the values of the GOODS, which are to be imported and payable in foreign currency, which are included
in the Quoted PRICE.
** The given Exchange Rates are the Selling Exchange Rates quoted by (name of Bank and branch):
Value in Foreign
Currency Equivalent in SA
Description Exchange Rate (State Currency) Rand (ZAR)
0,00
0,00
0,00
0,00
Signed
Telephone / Ext No
e-mail address
PSA PRODUCTION FACILITY & CPF MODIFICATIONS PROJECT
Request for Quotation No: 6/26793/48
DESCRIPTION - CCTV SYSTEM PSA
ANNEXURE M
Supervisor
Artisan
Other
DISBURSEMENTS
Travel
Accommodation
Car Hire
Other
Print Name
Signed
Date
PSA PRODUCTION FACILITY & CPF MODIFICATIONS PROJECT
Request for Quotation No: 6/26793/48
DESCRIPTION - CCTV SYSTEM PSA
ANNEXURE N
In terms of the Mozambican Petroleum Act, the requirement is to source equipment, materials and labour via Mozambican
National Content
Detailed below is the BIDDER's proposal as to how this requirement will be achieved and national content maximised
Labour
Other
Should space above be insufficient or the format be unsuitable, the BIDDER is required to furnish the information on
other suitable pages and refer thereto above.
Print Name
Signed
Date