Professional Documents
Culture Documents
I. The Building
1. Building Name: SERENITY DORMITORY
People frequently exhibit overwhelming feelings as a result of the stresses that are a
part of modern life. Stress is a common occurrence in life. When people have too much to
accomplish or when they haven't slept well, people can feel tension in their body. Frequent
victims of stress are students. They are more prone to stress due to loads of schoolwork and
that is why their dormitory or home should be relaxing, it should lessen the stress they feel from
a whole tiring day. And for that, Serenity Dormitory existed. According to oxford dictionary,
serenity is the state of being calm, peaceful and untroubled. It is the reason why this dormitory
is named Serenity, people can find peace and tranquility in here. It can help people, specially
students, to lessen their stress at work or at school.
Serenity Dormitory is a 5-storey building that provides not just a sleeping and residential
quarters, but also entertainment and other services that is primarily intended to bring ease and
to experience the communal life. Included also in this building is a roof deck that provides
additional entertainment and a place where people can find fresh air. This dormitory comprises
a total of 43×27 meters. The difference of this dormitory to other dormitory is that each floor
consists of three to four unique units. The ground floor has four units, each unit is different from
each other. Located also in the ground floor is a laundry area and a living area which are
accessible to all. The second floor also has four units and a living area. The third floor consists
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
of three units together with a laundry area and a fitness gym which are all accessible for
everyone in the building. The other two floors, offers a much more unique units and also
requires higher amount. There are two rooms in fifth floor that have a balcony. Every unit in this
building is made different from each other but, one thing is for sure, these units are all safe and
relaxing.
Living in a dormitory helps students to have the chance to engage in community life
while maintaining discipline and fostering character development in settings that are conducive
to academic endeavors. Students are generally the reason why this project is built. The project
will be 10-15 minutes away from the college universities which is a very good location for a
dormitory. The project itself, is built to be a relaxing place for the students to be inspired more
for their studies. There are also nearby working place or company, and for that reason, workers
can also occupy the project.
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
3. Project Location
The project is located at Matandang Balara, Commonwealth Avenue, Quezon City, 1121
Metro Manila. The site is beside the Shanghai Vida, diagonally across Diliman Doctors Hospital
and is also across Protek Telcom. It is a great location for a dormitory, for it is just 11 minutes
away from UP Diliman and 13 minutes away FEU Diliman.
2. Perspective View
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
3. Floor Plans
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
4. Elevation Plans
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
7. Stair Plan
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
I. DESIGN PARAMETERS
1. Dead Load
Preliminary Sizes of Members
BEAM:
A. Width – 300 mm
B. Height – 350 mm
COLUMN:
A. Section: 450 mm x 450 mm
SLAB:
A. Thickness: 150 mm
𝑓𝑦
((la – 0.45)(1000)(0.8+( ))
1000
Min h =
36𝑚+9
415
((4.70 – 0.45)(1000)(0.8+( ))
1000
Min h =
36(0.681) +9
FOOTING:
A. Section: 1.3 m x 1.3 m
B. Thickness: 300 mm
Material Properties:
1. Compressive Strength of Concrete – 28 MPa
2. Yield Strength of Steel (Main) – 415 MPa
3. Yield Strength of Steel (Secondary) – 276 MPa
4. Ceiling, Plaster on Tile or Concrete – 0.42 kPa
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
2. Live Loads
Floor Live Loads
Material Properties:
1. Occupancy: Office – 4.8 kN/m2
2. Dining Rooms – 4.8 kN/m2
3. Restrooms – 1.4 kN/m2
4. Stairs – 4.8 kN/m2
5. Occupancy: Parking Garages and Ramps – 2.4 kN/m2
6. Corridors above ground floor plan – 3.8 kN/m2
7. Residential: Basic Floor Area – 1.9 kN/m2
8. Bedroom – 2.4 kN/m2
3. Seismic Loads
Seismic Parameters based on Project Location:
Seismic Parameters:
1. Soil Profile Type – Sa
2. Closest Distance to Source – 1.9 km
Fault Name: Valley Fault System
3. Importance Factor – 1.0
4. Ductility Coefficient – 8.5 (Special Reinforced Concrete Frames)
5. Seismic Source Type – Type A
6. Seismic Response Coefficient – Zone 4, Z = 0.4
Seismic Coefficients:
*By Interpolation:
Ca = 0.32Na = 0.32(1.5) = 0.46
Cv = 0.32Nv = 0.32(2.0) = 0.64
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
Figure 1.2 Closer View of the Valley Fault System from the Project Location
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
V. BEAM DETAILS
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
Effective Depth:
1
𝑑 𝑒𝑓𝑓 = Beam Depth – Concrete Cover – Main Bars – 2 (∅ Main bars)
1
𝑑 𝑒𝑓𝑓 = 300 – 100 – 25 – 2 (25)
𝑑 𝑒𝑓𝑓 = 162.5 mm
II. Determine the Effective qe= qa– (h x concrete unit weight) – (soil height x soil unit
weight)
Soil Bearing Capacity.
qe= 110 – (0.3 x 23.6) – (2.5 x 18)
qe= 57.920 kPa
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
1
Vu = ( ) (q u2 + q u3 )(x)(B)
2
1
Vu = ( ) (4479.115 + 2727.094)(0.5125)(1.3)
2
Vu = 𝟐𝟒𝟎𝟎. 𝟓𝟔𝟖 𝐤𝐍
1 1
∅Vc = 6 ∅[√𝑓′𝑐]bw d = 6 (0.75)[√28](1300)(162.5)
1
VII. Determine Steel Area. 𝐹𝑢 = (q + q u1 ) 𝐵(0.9)
2 u2
1
𝐹𝑢 = (4479.115 + 34.964) (1.3)(0.9)
2
𝐹𝑢 = 2640.736 𝑘𝑁
𝑥 0.9
𝑀𝑢 = 𝐹𝑢 ( ) = 2640.736 ( ) = 1188.331 𝑘𝑁. 𝑚
2 2
Mu 1188.331 x 106
Rn = =
∅bd2 0.9(1300)(162.5)2
𝐑 𝐧 = 𝟑𝟖. 𝟒𝟔𝟏 𝐌𝐏𝐚
0.85fc′ 2 2R n
ρ= [1 − √1 − ]
fy 0.85fc′
0.85(28) 2 2(38.461)
ρ= [1 − √1 − ]
415 0.85(28)
ρ= 0.036188
1.4 1.4
ρmin = = 420 = 0.00333
fy
𝐴𝑠 = 𝜌𝑏𝑑
= 0.036188(1300)(162.5) = 𝟕𝟔𝟒𝟒. 𝟕𝟏𝟓 𝒎𝒎²
𝑈𝑠𝑖𝑛𝑔 25𝑚𝑚 ∅ 𝑏𝑎𝑟𝑠; 𝐴𝑑 = 490.874 𝑚𝑚²
𝐴𝑠 7644.715
𝑁= =
𝐴𝑑 490.874
X. FOOTING DETAILS
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
Loading:
Service Live Load 1.9 KN/m2
(Excluding slab
Service Dead Load 5.06 KN/m2
weight)
Calculated 0.694
put m
Slab:
Ratio
0.85 Two - way Slab (feet)
L - Long
7.2 m. 23.623
span
S - Short
5 m. 16.405 Min. h
span
Slab h 150 mm => 146.73
Concrete cover 20 mm `
Effective Depth (short direction) (d) 123 mm E.D in Lond D 125
All Four Edges
Case Number (#) 2
continues
Check for
Check for Effective Depth:
Shear:
Short Direction: SAFE!! OK
Long Direction: SAFE!! OK
Reinforcement Ratio:
Sir Qazi Large Formula
ρ(short
0.002026
bottom)
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
Solution:
Slab KN/
6.37 N/m² 0.01
Weight: m2
6.37 Kpa
Deadload: 11.430 Kpa
Liveload 1.900 Kpa
Wu = 1.2Wd +
1.6WL
KN/m
Total Load, Wu = 16.76
2
Calculated (Please Round off
yourself)
Put
m = La/Lb 0.85 m (Personal) (lx/ly)= 0.694
Manually
Considering 1
16.76 KN/m
meter strip:
AT SHORT DIRECTION:
AT LONG DIRECTION:
Longitudinal Bars:
Top Bar: 176 mm
Bottom Bar: 176 mm
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
SLAB:
ASSUME:
fc’=28 MPa
fy=415 MPa
𝑙𝑏 6.9
= = 𝟏. 𝟒𝟔𝟖 < 2 (𝑡𝑤𝑜 𝑤𝑎𝑦 𝑠𝑙𝑎𝑏)
𝑙𝑎 4.7
𝑙𝑎 4.7
𝑚= = = 0.681 ≅ 𝟎. 𝟕
𝑙𝑏 6.9
(Excluding slab weight)
415
((4.7−0.45)𝑥1000)𝑥(0.8+(1400))
Min h = = 146.73 ≅ 150mm
36(0.7)+9
Use:
Dead Load
BEAM 1. Concrete Hollow Block
S Walls
KN/m^
1.a 4" CHB Plastered both faces 3.32 2 9.96
KN/m^ 10.3
2.a 6" CHB Plastered both faces 3.45 2 5
SLAB 2
0.42
Ceiling
KN/m^
3. Floor Finish Ceramic tile on 25 mm mortar bed 1.1 2
KN/m^
4. 125 mm thick Reinforced Concrete Slab 2.95 2
KN/m^
Electromechanics 0.2 2
Dead
Load 5.06
Liveload 1.9
𝜋 𝑑2 𝜋 (10)2
Bar Area (𝐴𝑏 ) = = = 78.5𝑚𝑚2
4 4
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
𝑆𝑙𝑎𝑏 ℎ
𝑠𝑙𝑎𝑏 𝑤𝑒𝑖𝑔ℎ𝑡 = (1𝑥10−3 )
1000(2400)(9.81)
150
= (1𝑥10−3 )
1000(2400)(9.81)
= 6.3710 + 5.06
𝑤𝑢 = 1.2𝑤𝑑 + 1.6𝑤𝑙
𝒘𝒖 = 𝟏𝟔. 𝟖 𝒌𝑵/𝒎
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
𝑊 = 𝑤𝑢 𝐿𝑆
𝑊 = (16.8)(6.9)(4.7)
𝑊 = 544.824
Short direction:
𝑊𝑎 = 𝑠ℎ𝑒𝑎𝑟 𝑟𝑎𝑡𝑖𝑜 𝑜𝑛 𝑠𝑙𝑎𝑏 = 0.66
𝑊𝑆 = 𝑊𝑎 ∗ 𝑊
𝑊𝑆 = 0.66(603.22) = 398.125𝑘𝑁
Load per meter on short beam,
𝑤𝑠 398.125
= = 42.35𝑘𝑁
2𝑆 2(4.7)
𝜙𝑣𝐶 = 0.85(0.17√(𝑓𝐶′ )𝑑
Long direction:
𝑊𝑏 = 𝑠ℎ𝑒𝑎𝑟 𝑟𝑎𝑡𝑖𝑜 𝑜𝑛 𝑠𝑙𝑎𝑏 = 0.34
𝑊𝐿 = 𝑊𝑏 ∗ 𝑊
𝑊𝐿 = 0.34(13.35) = 18.51𝑘𝑁
Load per meter on long beam,
𝑊𝐿 18.51
= = 1.98𝑘𝑁
2𝐿 2(4.675)
𝜙𝑣𝐶 = 0.85(0.17√(𝑓𝐶′ )𝑑
At Long Direction:
SHORT SPAN
Cont. Edge Midspan Discont.Edge
ρmin. 0.0020 0.0020 0.0020
ρmax =
0.0216 0.0216 0.0216
.75(β)²(fc'/fy)(600/(600+fy))
ρ (Selected) 0.002025954 0.002025954 0.002025954
m = fy/.85fc'
Rn = ρfy(1-ρm/2)
Max. Ultimate Moment Mu =
Mn = Mu/.9
Req. d = sqrt(Mn/bRn), mm 123.00 123.00 123.00
Req. h = d+1/2bar dia.+bar
150.00 150.00 150.00
dia.+cover
Min. h = 2(L+S)*1000/180 150.00 150.00 150.00
Actual h = 150 150 150
Effective d = h - (bar dia. + 1/2 bar
135.00 140.00
dia)
LONG SPAN
𝜌𝑚𝑖𝑛 = 0.0020
Then,
𝑓𝑐′ 600
2
𝜌𝑚𝑎𝑥 = 0.75𝛽 ( )
𝑓𝑦 600 + 𝑓𝑦
28 600
𝜌𝑚𝑎𝑥 = 0.75(0.85)2 ( )
415 600 + 415
𝜌𝑚𝑎𝑥 = 0.0216
0.85(28) 2.614(7.76)(1𝑥106 )
= (1 − √(1 −
420 28(1𝑥103 )1232
𝝆 = 𝟎. 𝟎𝟎𝟐𝟎𝟐𝟔
0.85(28) 2.614(22.62)(1𝑥106 )
= (1 − √(1 −
415 28(1𝑥103 )1232
𝜌 = 0.0415
𝐴𝑏 71
𝑆= (1000) = (1000) = 139𝑚𝑚
𝐴𝑠 511
𝑆𝑚𝑎𝑥 = 2ℎ 𝑜𝑟 300
= 2(100) 𝑜𝑟 300
= 200 𝑜𝑟 300
0.85(28) 2.614(13.80)(1𝑥106 )
= (1 − √(1 −
415 28(1𝑥103 )1232
𝜌 = 0.00250
𝐴𝑏 71
𝑆= (1000) = (1000) = 231𝑚𝑚
𝐴𝑠 307
𝑆𝑚𝑎𝑥 = 2ℎ 𝑜𝑟 300
= 2(150) 𝑜𝑟 300
= 300
0.85(28) 2.614(24.23)(1𝑥106 )
= (1 − √(1 −
420 28(1𝑥103 )1252
𝜌 = 0.0043144
𝑆𝑚𝑎𝑥 = 2ℎ 𝑜𝑟 300
= 2(150) 𝑜𝑟 300
= 300
0.85(28) 2.614(24.23)(1𝑥106 )
= (1 − √(1 −
420 28(1𝑥103 )1252
𝜌 = 0.0025
𝐴𝑏 71
𝑆= (1000) = (1000) = 226.837𝑚𝑚
𝐴𝑠 313
𝑆𝑚𝑎𝑥 = 2ℎ 𝑜𝑟 300
= 2(150) 𝑜𝑟 300
= 300
ASSUME:
fc’=28 MPa fy=415 MPa
TRY 125mm
b=1000mm concrete cover, cc=30mm
h=130mm
Effective depth, d = h-cc
=130 -30
d =100mm
Calculation of Mu,
Slab self -weight = γconcrete (thickness)
= 23.6 kN/m3 (0.125)
Slab self-weight = 2.95 kPa
Dead Load = 5.06kPa (1) = 5.06kN/m
Live Load = 1.9 kPa (1) = 1.9kN/m
Wu = 1.2D + 1.6L
= 1.2 (5.06) + 1.6 (1.9)
Wu = 9.112 kN/m
𝑊𝑢𝐿𝑦 2 9.112(1.44)
Mu = = = 1.640 kN-m
8 8
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
Mu=1.640 KN-m
Assume tension-controlled, θ=0.90
𝑀𝑢 1.640 ⨯ 106
𝑅𝑛 = = = 𝟎. 𝟏𝟖𝟐𝑴𝑷𝒂
θb𝑑 2 0.90(1000)(100)2
0.85𝑓𝑐 ′ 2𝑅𝑛
𝜌= [1 − √1 − ]
𝑓𝑦 0.85𝑓𝑐 ′
0.85(28) 2(0.182)
= [1 − √1 − ]
415 0.85(28)
𝝆 = 𝟎. 𝟎𝟎𝟎𝟒𝟒
1⋅4 √28
= 𝑜𝑟
415 4(415)
0.85𝑓𝑐 ′ 600
𝜌𝑚𝑎𝑥 = 0.75 [ 𝛽( )]
𝑓𝑦 𝑓𝑦 + 600
0.85(28) 600
= 0.75 [ (0.85) ( )]
415 415 + 600
𝝆𝒎𝒂𝒙 = 𝟎. 𝟎𝟐𝟏𝟔𝟏
𝜋(12)2
𝐴𝑏 4
𝑆= (1000) = (1000) = 335.253 ≈ 𝟑𝟓𝟎 𝒎𝒎
𝐴𝑠 337.349
Smax = 3h or 450
= 3(130) or 450
𝜋(10)2
𝐴𝑏 4 (1000) = 335.640 ≈ 𝟑𝟐𝟓 𝒎𝒎
𝑆= (1000) =
𝐴𝑠𝑚𝑖𝑛 234
RECOMMENDATION:
USE 125mm THK ONE-WAY SLAB
12mm DIA. BARS SPACED @ 350mm O.C.
10mm DIA. TEMPERATURE BARS SPACED @ 325mm O.C.
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
I. CANVAS OF MATERIALS
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
REFERENCES:
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
II. EXCAVATION
Excavation Calculations:
Dimensions
FOOTING TIES
LENGT
MARK H WIDTH DEPTH MARK LENGTH WIDTH DEPTH
F1 1300 1300 300 TB1 1600 1600 300
F2 1300 2600 300 TB2 1600 3200 300
Formulas
FOOTING TIES
Area of Footing x Depth of
MARK MARK Area of Bar x Depth
Footing
F1 1.3 1.3 0.3 0.507 TB1 1.6 1.6 0.3
F2 1.3 2.6 0.3 1.014 TB2 1.6 3.2 0.3
FOOTING
V - F1 0.507
V - F2 1.014
V - F TOTAL 1.521
V - TB1 0.768
V - TB2 1.536
V - TB TOTAL 2.304
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
III. CONCRETING
BEAMS
Base No. of Beams Volume
Beam (m) Depth (m) Length (m) (pcs.) (m3)
TB-1 0.3 0.35 4.55 18 8.5995
TB-2 0.3 0.35 6.75 6 4.2525
TB-3 0.3 0.35 0.75 4 0.315
TB-4 0.3 0.35 3.275 4 1.3755
1B-1 0.3 0.35 4.55 18 8.5995
1B-2 0.3 0.35 6.75 6 4.2525
1B-3 0.3 0.35 0.75 4 0.315
1B-4 0.3 0.35 3.275 4 1.3755
2B-1 0.3 0.35 4.55 16 7.644
2B-2 0.3 0.35 6.75 5 3.54375
2B-3 0.3 0.35 0.75 4 0.315
3B-1 0.3 0.35 4.55 16 7.644
3B-2 0.3 0.35 6.75 5 3.54375
3B-3 0.3 0.35 0.75 4 0.315
4B-1 0.3 0.35 4.55 16 7.644
4B-2 0.3 0.35 6.75 5 3.54375
4B-3 0.3 0.35 0.75 4 0.315
5B-1 0.3 0.35 4.55 16 7.644
5B-2 0.3 0.35 6.75 5 3.54375
5B-3 0.3 0.35 0.75 4 0.315
TOTAL 75.096
COLUMNS
Base No. of Columns Volume
Column (m) Depth (m) Length (m) (pcs.) (m3)
C1 0.45 0.45 19.1 16 61.884
C2 0.45 0.45 4.5 4 3.645
TOTAL 65.529
FOOTING
Width Length Thickness No. of Columns Volume
Footing (m) (m) (m) (pcs.) (m3)
F1 1.3 1.3 0.3 12 6.084
F2 1.3 2.6 0.3 4 4.056
TOTAL 10.14
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
SLAB
Length No. of Slabs Volume
Slab Width (m) (m) Thickness (m) (pcs.) (m3)
S-1 5 5 0.15 24 90
S-2 1.2 5 0.125 12 9
S-3 1.2 7.2 0.125 6 6.48
S-4 5 7.2 0.15 6 32.4
S-5 3.725 5 0.15 12 33.525
S-6 3.725 7.2 0.15 1 4.023
TOTAL 175.428
STAIRS
Cross-sectional Area
No. of Stairs No. of Steps/Stair (m2) Volume
Width (m)
(pcs.) (pcs.) Rise (0.2 Tread (0.275 (m3)
m) m)
5 14 0.0275 1.25 2.40625
Volume
No. of Stairs (pcs.) Width (m) Thickness (m) Length (m)
(m3)
Waist Slab 5 1.25 0.42 14.3 37.5375
Landing 5 1.5 0.42 2.5 7.875
TOTAL 47.81875
Structural
Members Volume (m3)
Beams 75.096
Columns 65.592
Footings 10.14
Slabs 175.428
Stairs 47.81875
TOTAL 374.07475
MATERIALS SUMMARY
Materials Total Volume (m3) Multiplier Quantity Unit
Cement (40
kg) 374.07475 9 3367 bags
Gravel 374.07475 1 374.07475 m3
Sand 374.07475 0.5 187.037375 m3
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
IV. REINFORCEMENT
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
BEAM STIRRUPS
LEFT AND
MID No. of LENGTH OF
RIGHT No. of TOTAL QTY of 6m
LATERAL QTY LATERAL
LATERAL STIRRUPS Steel Bars
TIES TIES
TIES
1B-1.1 2 70 18 1296 0.95m 216
GROUND 1B-1.2 2 16 4 72 0.95m 12
FLOOR
BEAM 1B-1.3 2 52 4 216 0.95m 36
1B-1.4 2 102 5 520 0.95m 87
2ND 2B-1.1 2 35 16 592 0.95m 99
FLOOR 2B-1.2 2 8 4 40 0.95m 7
BEAM 2B-1.3 2 51 4 212 0.95m 36
3RD 3B-1.1 2 35 16 592 0.95m 99
FLOOR 3B-1.2 2 8 4 40 0.95m 7
BEAM 3B-1.3 2 51 4 212 0.95m 36
4TH 4B-1.1 2 35 18 666 0.95m 111
FLOOR 4B-1.2 2 8 6 60 0.95m 10
BEAM 4B-1.3 2 51 4 212 0.95m 36
5TH 5B-1.1 2 35 16 592 0.95m 99
FLOOR 5B-1.2 2 8 4 40 0.95m 7
BEAM 5B-1.3 2 51 4 212 0.95m 36
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
FOUNDATION
FOOTING REINFORCEMENTS
No. of
No. of Total
Ø25 Length No. of No. of TOTAL
Ø25 mm No. of
mm of Steel Steel Steel NUMBER
Quantity Length Width Bars Steel
Bars Bars Bars Bars OF BARS
per Bars per
per used (Length) (Width) (pcs)
Length footing
Width
F1 12 1.3 1.3 16 16 6 4 6 10 120
F2 4 2.6 1.3 32 16 6 14 2 16 64
NOTE: Each floor has two same design of stairs, therefore: 34 pcs will be multiplied by 2 and will
yield to 68 pcs of 7.5m bar.
Also, stairs from ground floor to roof deck has the same design and amount of reinforcement bar
needed, therefore:
68 pcs multiplied by 5 is 340 pcs of 7.5m bar.
V. FORMWORKS
FORMWORKS (COLUMNS)
WIDTH LENGTH HEIGHT PERIMETER AREA TOTAL AREA
COLUMN QUANTITY
(m) (m) (m) (m) (sq.m.) (sq.m.)
1-C1 0.45 0.45 3 19 1.8 5.4 102.6
2-C1 0.45 0.45 3 17 1.8 5.4 91.8
3-C1 0.45 0.45 3 16 1.8 5.4 86.4
4-C1 0.45 0.45 3 16 1.8 5.4 86.4
5-C1 0.45 0.45 3 16 1.8 5.4 86.4
NO. OF 2"X2"X20'
EFFECTIVE AREA OF PLYWOOD BF FRAME
LUMBER
PLYWOOD QUANTITY MULTIPLIER (BDF)
BD FT/(2X2X20/12)
2.88 35.625 36 20.33 731.88 732 183 183
2.88 31.875 32 20.33 650.56 651 162.75 163
1/2" X 4' X 8' 2.88 30 30 20.33 609.9 610 152.5 153
PHENOLIC
PLYWOOD 2.88 30 30 20.33 609.9 610 152.5 153
2.88 30 30 20.33 609.9 610 152.5 153
TOTAL 158 3213 805
SCAFFOLDING ON COLUMNS
2"X3" 2"X2"
2"X2" BRACE
VERTICAL BF HORIZONTAL BF
BF MULTIPLIER LUMBER
LUMBER MULTIPLIER LUMBER MULTIPLIER
(BD.FT)
(BD.FT) (BD.FT)
7 66.5 67 21 299.25 300 11.7 166.725 167
7 59.5 60 21 267.75 268 11.7 149.175 150
7 56 56 21 252 252 11.7 140.4 141
7 56 56 21 252 252 11.7 140.4 141
7 56 56 21 252 252 11.7 140.4 141
295 1324 740
COST ESTIMATE
UNIT TOTAL
MATERIALS QUANTITY UNIT
COST COST
PLYWOOD (1/2"X4'X8') 158 pcs ₱750.00 ₱118,500.00
2"X2"X12' LUMBER 2869 bdft ₱48.48 ₱139,089.12
2"X3"X12' LUMBER 295 bdft ₱48.48 ₱14,301.60
4" NAILS 38 kg ₱95.00 ₱3,610.00
TOTAL ₱275,500.72
FORMWORKS (BEAMS)
MARK QUANTITY LENGTH (m) WIDTH (m) DEPTH (m) AREA TOTAL AREA
1B-1 14 4.55 0.3 0.35 1.365 19.11
2B-1 10 4.55 0.3 0.35 1.365 13.65
3B-1 10 4.55 0.3 0.35 1.365 13.65
4B-1 10 4.55 0.3 0.35 1.365 13.65
5B-1 10 4.55 0.3 0.35 1.365 13.65
1B-1 5 6.75 0.3 0.35 2.025 10.125
1B-1 4 0.75 0.3 0.35 0.225 0.9
1B-1 4 3.275 0.3 0.35 0.9825 3.93
88.665
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
FORMWORKS (BEAMS)
EFFECTIVE AREA OF
PLYWOOD FRAME NO OF 2" X 2" X 12'
PLY QUANTITY MULTIPLIER
(1/2" x 4' x 8' Phenolic BDFT LUMBER
Plywood)
6.635416667 7 18.66 130.62 131 32.75 33
4.739583333 5 18.66 93.3 94 23.5 24
4.739583333 5 18.66 93.3 94 23.5 24
4.739583333 5 18.66 93.3 94 23.5 24
2.88
4.739583333 5 18.66 93.3 94 23.5 24
3.515625 4 18.66 74.64 75 18.75 19
0.3125 1 18.66 18.66 19 4.75 5
1.364583333 2 18.66 37.32 38 9.5 10
TOTAL 30.78645833 34 634.44 639 159.75 163
Cost Estimates
Materials Quantity Unit Unit Cost Total Cost
1/2" X 4' X 8' Phenolic Plywood 34 PCS ₱750.00 ₱25,500.00
2" X 2" X 12' Lumber 2029 BDFT ₱48.48 ₱98,365.92
2" X 3" X 12' Lumber 1774 BDFT ₱48.48 ₱86,003.52
4" Common Wire Nail 20 KG ₱95.00 ₱1,900.00
2" Common Wire Nail 160 KG ₱95.00 ₱15,200.00
Total ₱226,969.44
SCAFFOLDING (STAIRS)
NO OF NO OF
MULTIPLIER FRAME BD.FT. LUMBER MULTIPLIER FRAME BD.FT. LUMBER
2'X2'X12" 2'X3'X12"
WAIST
6.1 68.20138889 74 18.5 19 9.1 101.7430556 110 18.33333333 19
SLAB
LANDING 6.1 1.57 2 0.5 1 9.1 49.60763889 55 9.166666667 10
TOTAL 69.77138889 76 19 20 151.3506944 165 27.5 29
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
Cost Estimates
Materials Quantity Unit Unit Cost Total Cost
1/2" X 4' X 8' Phenolic Plywood 34 PCS ₱750.00 ₱25,500.00
2" X 2" X 12' Lumber 76 BD.FT. ₱48.48 ₱3,684.48
2" X 3" X 12' Lumber 165 BD.FT. ₱48.48 ₱7,999.20
4" Common Nails 4 KG ₱95.00 ₱380.00
2" Common Nails 9 KG ₱95.00 ₱855.00
Total ₱38,418.68
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
COST ESTIMATE
MATERIALS QUANTITY UNIT UNIT COST TOTAL COST
PLYWOOD (1/2"X4'X8') 350 pcs ₱750.00 ₱262,500.00
2"X3" LUMBER 1525 bdft ₱48.48 ₱73,932.00
5" NAILS 89 kg ₱95.00 ₱8,455.00
TOTAL ₱344,887.00
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
VI. MASONRY
MASONRY
1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor
Wall Area Wall Area Wall Area Wall Area Wall Area
(m²) (m²) (m²) (m²) (m²)
Front 34.15 42.09 42.09 42.09 34.61
Rear 43.91 43.91 43.91 43.91 43.66
Right 34.055 24.23 24.23 24.23 24.23
Left 34.055 24.23 24.23 24.23 24.23 676.28
Interior 226.90346 129.0588 205.63999 218.11155 175.78433 955.49813
Total Area (m²) 373.07346 263.5188 340.09999 352.57155 302.51433 1631.77813
VII. PLASTERING
BNPL 2 -TEAM 2
SERENITY DORMITORY (COST ESTIMATES FOR PLASTERING)
PRICE COMPUTATION
ITEM QUANTITY PRICE PER UNIT SUB TOTAL
CEMENT 1720 277/BAG 476,440.00 PHP
SAND 96 1200/CU.M 115,200.00 PHP
GROUND FLOOR
DESCRIPTION QUANTITY UNIT
Thickness of Flooring 50 mm
Wet Volume of Mortar 12.0005 cu.m
Dry Volume of Mortar 15.000625 cu.m
Cement 3.000125 cu.m
Cement Bags 86 bags
Sand 12.0005 cu.m
Tile Grout 31 2kg bags
Tile Adhesive 33 25 kg bags
Rough Stone Floor Tile (60cm x 60cm) 2625 pcs
ROOF DECK
DESCRIPTION QUANTITY UNIT
Thickness of Flooring 50 mm
Wet Volume of Mortar 9.0785 cu.m
Dry Volume of Mortar 11.348125 cu.m
Cement 2.269625 cu.m
Cement Bags 65 bags
Sand 9.0785 cu.m
Tile Grout 23 2kg bags
Tile Adhesive 25 25 kg bags
Matte Floor Tile (60cm x 60cm) 1986 pcs
Doors Fixtures
FIXTURES QUANTITY UNIT Sq.m Cost per Sq.m/pcs TOTAL COST
Aluminum Glass Door 1 Sq.m 6.30 ₱5,614.11 ₱35,368.89
Flush Type Solid Core Door 31 Sq.m 1.52 ₱1,877.94 ₱88,488.53
PVC Door with Louver White 20 pcs - ₱2,700.00 ₱54,000.00
₱177,857.43
Windows Fixtures
FIXTURES QUANTITY UNIT Sq.m Cost per Sq.m/pcs TOTAL COST
Sliding Aluminum Window 2 Sq.m 2.38 ₱3,508.28 ₱16,699.41
Sliding Aluminum Window 39 Sq.m 1.82 ₱3,508.28 ₱249,017.71
Fixed Glass Window on Metal Frame 8 Sq.m 1.2 ₱461.25 ₱4,428.00
Fixed Glass Window on Metal Frame 6 Sq.m .25 ₱461.25 ₱691.88
₱270,837.00
BATHROOM FIXTURES
FIXTURES QUANTITY UNIT UNIT COST TOTAL COST
Lavatory 18 pcs ₱1,612.00 ₱29,016.00
Lavatory Faucet 18 pcs ₱1,020.00 ₱18,360.00
Shower 15 pcs ₱7,632.00 ₱114,480.00
Floor Drain 18 pcs ₱380.00 ₱6,840.00
Bath Tub 3 pcs ₱71,130.00 ₱213,390.00
Flush Toilet 18 pcs ₱4,050.00 ₱72,900.00
₱454,986.00
LAUNDRY FIXTURES
FIXTURES QUANTITY UNIT UNIT COST TOTAL COST
Fully Auto Washing Machine 11 pcs ₱10,998.00 ₱120,978.00
Drainboard sink 2 pcs ₱3,328.00 ₱6,656.00
Lavatory Faucet 2 pcs ₱1,050.00 ₱2,100.00
Wall Faucet 10 pcs ₱1,320.00 ₱13,200.00
Clothes Drying Rack 3 pcs ₱1,169.00 ₱3,507.00
Floor Drain 10 pcs ₱380.00 ₱3,800.00
Trash Bin 10 pcs ₱1,329.00 ₱13,290.00
₱163,531.00
KITCHEN FIXTURES
FIXTURES QUANTITY UNIT UNIT COST TOTAL COST
Kitchen Sink 16 pcs ₱1,152.00 ₱18,432.00
Kitchen Stove 16 pcs ₱16,799.00 ₱268,784.00
Range Hood 16 pcs ₱10,000.00 ₱160,000.00
Refrigerator 1 pcs ₱49,998.00 ₱49,998.00
Garbage Disposal 16 pcs ₱10,099.00 ₱161,584.00
₱658,798.00
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
GYM EQUIPMENTS
FIXTURES QUANTITY UNIT UNIT COST TOTAL COST
Training Bench 1 pcs ₱6,399.00 ₱6,399.00
Dumb Bell Set 1 pcs ₱23,999.00 ₱23,999.00
Barbell Set 1 pcs ₱8,900.00 ₱8,900.00
Treadmill 2 pcs ₱23,600.00 ₱47,200.00
Stationary Bicycle 2 pcs ₱8,999.00 ₱17,998.00
Fitness Ball 3 pcs ₱1,155.00 ₱3,465.00
₱107,961.00
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
CEILING FIXTURES
GROUND TYPICAL UNIT TOTAL
FIXTURES QUANTITY
FLOOR FLOOR COST COST
60X60 CM LED LIGHT 45 pcs 53 pcs 98 ₱1,999.75 ₱195,975.50
ROUND LED LIGHT 18 pcs 82 pcs 100 ₱2,147.00 ₱214,700.00
FLOURESCENT LAMP 32 pcs 123 pcs 155 ₱1,320.86 ₱204,733.30
MECHANICAL
10 pcs 26 pcs 36 ₱5,463.96 ₱196,702.56
VENTILATION
MULTI LIGHT BAR 0 pcs 6 pcs 6 ₱400.00 ₱2,400.00
₱814,511.36
CEILING WORKS
Ground
Materials Typical Floor Quantity Unit Unit Cost Total Cost
Floor
Metal furring 80 248 328 m ₱129.00 ₱42,312.00
Carrying
16 49 65 m ₱93.00 ₱6,045.00
channel
W-clip 756 2376 3132 pcs ₱6.00 ₱18,792.00
Rivet 56 222 278 pcs ₱250.00 ₱69,500.00
Wall angle 27 95 122 m ₱25.00 ₱3,050.00
Threaded rod 38 470 508 m ₱260.00 ₱132,080.00
Expansion
112 352 464 mm ₱18.00 ₱8,352.00
bolt
J-clip (100pcs) 1 4 5 box ₱550.00 ₱2,750.00
Screw 3096 9648 12744 pcs ₱0.75 ₱9,558.00
Concrete nail 6 18 23 kg ₱100.00 ₱2,300.00
Gypsum
86 268 354 sheet ₱413.00 ₱146,202.00
board
₱440,941.00
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
XII. PAINTWORKS
PAINTING WORKS
EXTERIOR WALL
TOTAL WALL AREA 676.28 m² Cost
Skimcoat 271 bags ₱151,285.75
Concrete Primer and Sealer 109 L ₱24,080.00
Base coat 109 L ₱19,572.00
Topcoat 178 L ₱27,945.00
Total Cost ₱222,882.75
INTERIOR WALL
TOTAL WALL AREA 955.49813 m² Cost
Skimcoat 383 bags ₱213,809.75
Concrete Primer and Sealer 153 L ₱33,540.00
Base coat 153 L ₱27,261.00
Topcoat 252 L ₱39,123.00
Total Cost ₱313,733.75
SCOPE OF WORKS
ITEM PARTICULARS QTY. UNIT UNIT COST SUB TOTAL
A EARTHWORKS
Exacation 3.825 CU.M. ₱ 340.39 ₱ 1,301.992
Gravel Fill 3.825 CU.M. ₱ 893.69 ₱ 3,418.364
B CONCRETE WORKS
Cement 40-kg 3367 BAGS ₱ 277.00 ₱ 932,659.000
Gravel 374.075 CU.M. ₱ 1,250.00 ₱ 467,593.750
Sand 187.038 CU.M. ₱ 1,200.00 ₱ 224,445.600
C MASONRY WORKS
No. 4" CHB (Concrete Hollow Blocks) 11,944 PCS. ₱ 14.00 ₱ 167,216.000
No. 6" CHB (Concrete Hollow Blocks) 8,454 PCS. ₱ 18.00 ₱ 152,172.000
Cement 40-kg 1,790 BAGS ₱ 215.00 ₱ 384,850.000
Sand 98.65 CU.M. ₱ 1,200.00 ₱ 118,380.000
D PLASTERING
Cement Plaster 40-kg 1,720 BAGS ₱ 277.00 ₱118,380.00
Sand 96 CU.M. ₱ 1,200.00 ₱ 115,200.000
G CEILING WORKS
Metal furring 328 L.M. ₱ 129.00 ₱ 42,312.000
Carrying channel 65 L.M. ₱ 93.00 ₱ 6,045.000
W-clip 3,132 PCS. ₱ 6.00 ₱ 18,792.000
Rivet 278 PCS. ₱ 250.00 ₱ 69,500.000
Wall angle 122 L.M. ₱ 25.00 ₱ 3,050.000
Threaded rod 508 L.M. ₱ 260.00 ₱ 132,080.000
Expansion bolt 464 MM. ₱ 18.00 ₱ 8,352.000
J-clip (100pcs) 5 BOX ₱ 550.00 ₱ 2,750.000
Screw 12,744 PCS. ₱ 0.75 ₱ 9,558.000
Concrete nail 23 KG. ₱ 100.00 ₱ 2,300.000
Gypsum board 354 SHEET ₱ 413.00 ₱ 146,202.000
H PAINT WORKS
Skimcoat 654 BAGS ₱ 558.25 ₱ 365,095.500
Concrete Primer and Sealer 262 4L ₱ 860.00 ₱ 57,620.000
Base Coat 262 4L ₱ 699.00 ₱ 46,833.000
Top Coat 430 4L ₱ 621.00 ₱ 67,068.000
K CEILING FIXTURES
LED Light (60cm x 60cm) 98 PCS. ₱ 1,999.75 ₱ 195,975.500
Round LED Light 100 PCS. ₱ 2,147.00 ₱ 214,700.000
Flourescent Lamp 155 PCS. ₱ 1,320.86 ₱ 204,733.300
Mechanical Ventilation 36 PCS. ₱ 5,463.96 ₱ 196,702.560
Multi Light Bar 6 PCS. ₱ 400.00 ₱ 2,400.000
M BATHROOM FIXTURES
Lavatory 18 PCS. ₱ 1,612.00 ₱ 29,016.000
Lavatory Faucet 18 PCS. ₱ 1,020.00 ₱ 18,360.000
Shower 15 PCS. ₱ 7,632.00 ₱ 114,480.000
Floor Drain 18 PCS. ₱ 380.00 ₱ 6,840.000
Bath Tub 3 PCS. ₱ 71,130.00 ₱ 213,390.000
Flush Toilet 18 PCS. ₱ 4,050.00 ₱ 72,900.000
N GYM EQUIPMENT
Training Bench 1 PCS. ₱ 6,399.00 ₱ 6,399.000
Dumb Bell Set 1 PCS. ₱ 23,999.00 ₱ 23,999.000
Barbell Set 1 PCS. ₱ 8,900.00 ₱ 8,900.000
Treadmill 2 PCS. ₱ 23,600.00 ₱ 47,200.000
Stationary Bicycle 2 PCS. ₱ 8,999.00 ₱ 17,998.000
Fitness Ball 3 PCS. ₱ 1,155.00 ₱ 3,465.000
TOTAL ₱ 79,316,835.270
SUMMARY OF COST
CONCRETING (per m³)
TOTAL ₱ 1,624,698.35
MATERIAL COST ₱ 1,624,698.35
LABOR COST ₱ 487,409.51
DIRECT COST ₱ 2,112,107.86
MARK UP ₱ 739,237.75
VAT ₱ 342,161.47
TOTAL COST ₱ 3,193,507.08
UNIT COST ₱ 8,537.08
SUMMARY OF COST
MASONRY (per m²)
TOTAL ₱ 822,618.00
MATERIAL COST ₱ 822,618.00
LABOR COST ₱ 246,785.40
DIRECT COST ₱ 1,069,403.40
MARK UP ₱ 374,291.19
VAT ₱ 173,243.35
TOTAL COST ₱ 1,616,937.94
UNIT COST ₱ 990.91
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
SUMMARY OF COST
REINFORCEMENTS (per m²)
TOTAL ₱ 2,496,510.63
MATERIAL COST ₱ 2,496,510.63
LABOR COST ₱ 748,953.19
DIRECT COST ₱ 3,245,463.82
MARK UP ₱ 1,135,912.34
VAT ₱ 525,765.14
TOTAL COST ₱ 4,907,141.30
UNIT COST ₱ 1,418.35
SUMMARY OF COST
PLASTERING (per m²)
TOTAL ₱ 591,640.00
MATERIAL COST ₱ 591,640.00
LABOR COST ₱ 177,492.00
DIRECT COST ₱ 769,132.00
MARK UP ₱ 269,196.20
VAT ₱ 124,599.38
TOTAL COST ₱ 1,162,927.58
UNIT COST ₱ 712.68
SUMMARY OF COST
FORMWORKS (per m²)
TOTAL ₱ 885,775.84
MATERIAL COST ₱ 885,775.84
LABOR COST ₱ 265,732.75
DIRECT COST ₱ 1,151,508.59
MARK UP ₱ 403,028.01
VAT ₱ 186,544.39
TOTAL COST ₱ 1,741,080.99
UNIT COST ₱ 1,064.18
MELHAM CONSTRUCTION CORPORATION
CIVIL ENGINEERING DEPARTMENT
SERENITY
SUMMARY OF COST
PAINT WORKS (per m²)
TOTAL ₱ 536,616.50
MATERIAL COST ₱ 536,616.50
LABOR COST ₱ 160,984.95
DIRECT COST ₱ 697,601.45
MARK UP ₱ 244,160.51
VAT ₱ 113,011.43
TOTAL COST ₱ 1,054,773.39
UNIT COST ₱ 1,669.53
SUMMARY OF COST
FLOOR FINISH AND TILE WORKS (per m²)
TOTAL ₱ 69,881,640.00
MATERIAL COST ₱ 69,881,640.00
LABOR COST ₱ 20,964,492.00
DIRECT COST ₱ 90,846,132.00
MARK UP ₱ 31,796,146.20
VAT ₱ 14,717,073.38
TOTAL COST ₱ 137,359,351.58
UNIT COST ₱ 122,060.31
SUMMARY OF COST
TOTAL ₱ 79,793,275.27
MATERIAL COST ₱ 79,793,275.27
LABOR COST ₱ 23,937,982.58
DIRECT COST ₱ 103,731,257.85
MARK UP ₱ 36,305,940.25
VAT ₱ 16,804,463.77
TOTAL COST ₱ 156,841,661.87
SE
RE
NI
TY
DO
RMI
TO
RY
EQUIPMENT, INC.
ELIXIR INDUSTRIAL
V E
H A
YOKOHAMA L T
COMMONWEALTH E A
N W
M O
O M
C
17200
1
T&B YSIZE
XSIZE
T&B
YSIZE
XSIZE
BEDROOM
5000
BEDROOM
KITCHEN
LIVING AREA UP UP
KITCHEN
DINING AREA
LIVING AREA
DINING AREA
1200
DINING AREA
T&B
YSIZE
XSIZE
3
14925
KITCHEN
LIVING AREA
5000
BEDROOM
YSIZE
XSIZE
KITCHEN
T&B
4
LAUNDRY
AREA LIVING AREA
3725
5
693
2500
15000
21000
25000
DORMITORY
ENRIQUEZ, E. ENRIQUEZ, V.E. EQUIAS, R.M. FLOOR PLAN
BNPL - 2
Unauthorized reproduction and use of this document is
punishable by law.
INGCO, M. RAMOS, M.J.L.
SANTILLAN, R.A.
REDUCTO, J.
3
A B C D A B C D
17200
17200 5000 7200 5000
5000 7200 5000
1 KITCHEN BEDROOM
1
KITCHEN
T&B
DINING AREA
5000
5000
BEDROOM
BEDROOM DINING AREA
UP UP UP UP
T&B
T&B
T&B
BEDROOM
2 2
11200
11200
1200
1200
3 3
T&B joinmeeting,
To join thetovideo
Otherwise, dialthis
by phone,click and enter this PIN: 275 927 507#
link: https://meet.google.com/ehh-jqzq-uxm
+1 631-619-8080
LIVING AREA
FITNESS GYM
BEDROOM LAUNDRY
5000
5000
DINING AREA
AREA
BEDROOM
LIVING AREA KITCHEN DINING AREA
KITCHEN 1:48 SCALE
4 4
17200
17200
5000 7200 5000
5000 7200 5000
LAUNDRY LAUNDRY 1 1
1750
AREA AREA
T&B DINING AREA
T&B
LAUNDRY
AREA
BEDROOM
BEDROOM
5000
5000
LAUNDRY
BEDROOM AREA
LIVING AREA
KITCHEN
3250
DINING AREA
UP UP UP UP
YSIZE
XSIZE
2 2
11200
1200
1200
T&B T&B
YSIZE
XSIZE
3 3
1632
LAUNDRY LAUNDRY
AREA AREA T&B LAUNDRY LAUNDRY T&B
AREA AREA
DINING AREA
DINING AREA
DINING AREA
DINING AREA
5000
BEDROOM BEDROOM
5000
KITCHEN KITCHEN
BEDROOM
3368
YSIZE
XSIZE
4 4
DORMITORY
ENRIQUEZ, E. ENRIQUEZ, V.E. EQUIAS, R.M.
FLOOR PLAN
BNPL - 2
Unauthorized reproduction and use of this document is
punishable by law.
INGCO, M. RAMOS, M.J.L.
SANTILLAN, R.A.
REDUCTO, J.
5
A B C D
17200
1750
T&B
5000
2
1200
3
1632
5000
3368
DORMITORY
ENRIQUEZ, E. ENRIQUEZ, V.E. EQUIAS, R.M.
ROOF DECK
BNPL - 2
Unauthorized reproduction and use of this document is
punishable by law.
INGCO, M. RAMOS, M.J.L.
SANTILLAN, R.A.
REDUCTO, J.
6
A B C D D C B A
2500
2300
1400
1400
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
300
300
1500
1500
A FRONT ELEVATION A REAR ELEVATION
Scale Scale
7 1:100MTS
7 1:100MTS
DORMITORY
ENRIQUEZ, E. ENRIQUEZ, V.E. EQUIAS, R.M.
ELEVATION
BNPL - 2
Unauthorized reproduction and use of this document is
punishable by law.
INGCO, M. RAMOS, M.J.L.
SANTILLAN, R.A.
REDUCTO, J.
7
2 2
5 4 3 1 1 3 4 5
1400
1400
3300
3300
3300
3300
3300
3300
3300
3300
3300
3300
300
1500
1500
A RIGHT SIDE ELEVATION A LEFT SIDE ELEVATION
8 Scale 1:100MTS
8 Scale 1:100MTS
1 3 4 5
A B C D
X A TRANSVERSE SECTION
Scale 1:100MTS
9
5 4 3 1
A B C D
Y A LONGITUDINAL SECTION
10 Scale 1:100MTS
17200
1
s
s
BEDROOM s
5000
s BEDROOM
s
UP UP
s s
s
s s2
1200
s s s2
3
14925
s
5000
s
s
BEDROOM
s2
s 4
3725
5
s s s
693
2500
15000
21000
1
1
5000
s
BEDROOM s
s
5000
BEDROOM s s
UP UP T&B
s s
T&B
s
s
UP UP
s s2
s2 s2
2 s
11200
s
1200
3
s s2
11200
1200
s2
s s
5000
s2
4
1:48 SCALE
A SECOND FLOOR REFLECTED CEILING PLAN A THIRD FLOOR REFLECTED CEILING PLAN
Scale Scale
12 1:100MTS
12 1:100MTS
17200
17200
5000 7200 5000
5000 7200 5000
1 1
1750
T&Bs DINING AREA s
T&B
LAUNDRY
s s AREA
BEDROOM
BEDROOM
s2
5000
5000
LAUNDRY
s s
BEDROOM AREA
s2
LIVING AREA
3250
1400
s2 s2
UP UP UP UP
s s
s s
BEDROOM
2 2
s2 s2 s2
s2
11200
s s
1200
1200
s2 s s2
3 s3 s s3
3
1632
s s s
s
T&B LAUNDRY LAUNDRY T&B
AREA AREA
DINING AREA
5000
BEDROOM
5000
s2 s2
BEDROOM s2
3368
s2
4 4
A FOURTH FLOOR REFLECTED CEILING PLAN A FIFTH FLOOR REFLECTED CEILING PLAN
13 Scale 1:100MTS
13 Scale 1:100MTS
2000
2100
Incandescent lamp
500
1700
500
Surface light mounted
1300
1852,61
1638,59
Suspended Light
Suspended Spotlight
Schedule of Doors
S1 Switch one gang
Door No.
Location Entrance Room Entrance TnB Entrance
S2 Switch two gang Description 3000x2880 1853x800 1640x700
Quantity 1 31 20
S3 Switch three gang
Schedule of Windows
Window No.
Location First floor Window 2nd-5th floor Window Right and Left side Window TnB Window
Description 1700x1400 1300x1400 2000x600 500x500
Quantity 2 39 8 6
UP UP
A3 STAIR SECTION A
15 Scale 1:100MTS
SLAB THICKNESS
SLAB THICKNESS
3000 3000
275
200
17200 17200
1 1
C1F1 C1F1 C1F1 C1F1
5000
5000
S1 S1
2 2
1200
1200
C1F2 C1F2 C1F2 C1F2 S2 S3 S2
3 3
14925
14925
S1 S4 S1
5000
5000
C1F1 C1F1 C1F1 C1F1
4 4
3725
3725
S5 S6 S5
C1F1 C1F1 C1F1 C1F1
5 5
17200
5000
2
1200
3
14925
5000
4
3725
5000
17200
7200 5000
A B C D
4.094 kN 4.094 kN 4.094 kN 1
4.094 kN
17200
4.094 kN
4.094 kN
4.094 kN
5000
4.094 kN
4.094 kN
4.094 kN
4.094 kN
3
5000
4.094 kN 4.094 kN 4.094 kN 4.67kPa 4.67kPa
14925
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.67kPa 4.67kPa
2
5000
11200
1200
4.67kPa 4.67kPa 4.67kPa
4.094 kN 4.094 kN 4.094 kN
3
4.094 kN 4.094 kN 4.094 kN 4
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.67kPa 4.67kPa 4.67kPa
5000
3725
S GROUND FLOOR DEAD LOAD SUMMARY PLAN S SECOND FLOOR DEAD LOAD SUMMARY PLAN
Scale 1:100MTS Scale 1:100MTS
4 4
17200 17200
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.094 kN
5000
5000
5.26kPa 5.26kPa 5.26kPa 5.26kPa
11200
1200
1200
5.26kPa 5.26kPa 5.26kPa 5.26kPa 5.26kPa 5.26kPa 5.26kPa 5.26kPa
4.094 kN 4.094 kN 4.094 kN 3 3
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.094 kN
4.094 kN
5000
4.094 kN 4.094 kN 4.094 kN 4 4.094 kN 4.094 kN 4.094 kN
4
S THIRD FLOOR DEAD LOAD SUMMARY PLAN S FOURTH FLOOR DEAD LOAD SUMMARY PLAN
Scale Scale
5 1:100MTS
5 1:100MTS
17200 17200
2.40 kN
2.40 kN
2.40 kN
2.40 kN
5000
5000
11200
1200
11200
1200
2.40 kN
2.40 kN
2.40 kN
2.40 kN
4.47kPa
5000
4.67kPa 4.47kPa 4.47kPa
5000
4.67kPa 4.67kPa
S FIFTH FLOOR DEAD LOAD SUMMARY PLAN S ROOF DECK LIVE DEAD SUMMARY PLAN
Scale Scale
6 1:100MTS
6 1:100MTS
5000
17200
7200 5000
A B C D
1
17200
5000
1
2
1200
5000
47.60 kN 47.60 kN
14925
60.4 kN 60.4 kN
172.8 kN
2
5000
11200
1200
22.8 kN 32.8 kN 22.8 kN
3
4
47.60 kN 172.8 kN 120 kN
5000
3725
5 4
S GROUND FLOOR LIVE LOAD SUMMARY PLAN S SECOND FLOOR LIVE LOAD SUMMARY PLAN
Scale Scale
7 1:100MTS
7 1:100MTS
17200 17200
1 1
5000
5000
63.72 kN 79.64 kN
63.72 kN 79.64 kN
2 2
11200
11200
1200
1200
22.8 kN 32.8 kN 22.8 kN 4.49 kN 10.60 kN 32.8 kN 10.60 kN 4.49 kN
3 3
26.76 kN
26.76 kN
47.50 kN 94.32 kN 90 kN 61.56 kN 104.4 kN 61.56 kN
5000
5000
4 4
S THIRD FLOOR LIVE LOAD SUMMARY PLAN S FOURTH FLOOR LIVE LOAD SUMMARY PLAN
Scale Scale
8 1:100MTS
8 1:100MTS
17200 17200
1 1
5000
5000
75.11 kN 90 kN
75.11 kN 78.05 kN
2 2
11200
1200
11200
1200
59.51 kN 90 kN 129.6 kN 90 kN
5000
77.57 kN 59.51 kN
5000
4 4
S FIFTH FLOOR LIVE LOAD SUMMARY PLAN S ROOF DECK LIVE LOAD SUMMARY PLAN
Scale Scale
9 1:100MTS
9 1:100MTS
3500
3500
3500
4-20 mm Ø BOTTOM BAR 6-20 mm Ø BOTTOM BAR 4-20 mm Ø BOTTOM BAR
4-20mm Ø 4-20mm Ø
BOTTOM BARS BOTTOM BARS
BOTTOM BARS 6-20mm Ø
BOTTOM BARS AT MIDSPAN BOTTOM BARS BOTTOM BARS
AT SUPPORT
AT SUPPORT
L/4 L/2 L/4
3500
3500
3500
3-16 mm Ø BOTTOM BAR 3-16 mm Ø BOTTOM BAR 3-16 mm Ø BOTTOM BAR
3500
3500
3500
2-20 mm Ø BOTTOM BAR 5-20 mm Ø BOTTOM BAR 2-20 mm Ø BOTTOM BAR
2-20mm Ø 2-20mm Ø
BOTTOM BARS BOTTOM BARS
BOTTOM BARS 5-20mm Ø
BOTTOM BARS AT MIDSPAN BOTTOM BARS BOTTOM BARS
AT SUPPORT
AT SUPPORT
L/4 L/2 L/4
3500
3500
3500
2-16 mm Ø BOTTOM BAR 2-16 mm Ø BOTTOM BAR 2-16 mm Ø BOTTOM BAR
3500
3500
3500
2-16 mm Ø BOTTOM BAR 2-16 mm Ø BOTTOM BAR 2-16 mm Ø BOTTOM BAR
50MM SPACING
40MM CLEAR COVER
24-20MM REINFORCEMENT STEEL BAR
450MM
250 MM C/C SPACING
3000MM
10MM TIES
2900MM
450MM
50MM SPACING
S COLUMN DETAILS A
Scale 1:100MTS
15
50MM SPACING
40MM CLEAR COVER
12-16MM REINFORCEMENT STEEL BAR
450MM
250 MM C/C SPACING
3000MM
10MM TIES
2900MM
450MM
50MM SPACING
S COLUMN DETAILS B
Scale 1:100MTS
16
50MM SPACING
40MM CLEAR COVER
12-16MM REINFORCEMENT STEEL BAR
450MM
250 MM C/C SPACING
3000MM
S COLUMN DETAILS C
Scale 1:100MTS
17
50MM SPACING
40MM CLEAR COVER
12-16MM REINFORCEMENT STEEL BAR
450MM
250 MM C/C SPACING
3000MM
10MM TIES
2900MM
450MM
50MM SPACING
S COLUMN DETAILS D
Scale 1:100MTS
18
50MM SPACING
40MM CLEAR COVER
16-16MM REINFORCEMENT STEEL BAR
450MM
250 MM C/C SPACING
10MM TIES
3000MM
2900MM
450MM
50MM SPACING
S COLUMN DETAILS E
Scale 1:100MTS
19
N.G.L. N.G.L.
1200
200
300
300
200
16-Ø25 @ 100mm 32-Ø25 @ 100mm
16-Ø25 @ 100mm 16-Ø25 @ 100mm
ELEVATION ELEVATION
1300 2600
32-Ø25
16-Ø25
1300
1300
50mm,COVER 50mm,COVER
SPACING SPACING
16-Ø25 16-Ø25
PLAN PLAN
1.800 1.800
1.25
5.000
10 mm-Ø BOTTOM BARS @ 227mm O.C.
1.25
10 mm-Ø BOTTOM BARS @ 231mm O.C.
SHORT SPAN
125
10mm-Ø BARS 10mm Ø TEMPERATURE
SPACED @ 178 mm BARS SPACED @ 178 mm
5000
17200
7200 5000
A B C D
1
LONG SPAN SPACING: LONG SPAN SPACING:
TOP BARS = 132 mm TOP BARS = 132 mm 17200
MID BARS = 227 mm MID BARS = 227 mm
BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm
5000
LONG SPAN SPACING LONG SPAN SPACING LONG SPAN SPACING MID BARS = 227 mm MID BARS = 227 mm
= 350 mm = 350 mm = 350 mm BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm
5000
3 SHORT SPAN SPACING:
TOP BARS = 139 mm
SHORT SPAN SPACING:
TOP BARS = 139 mm
14925
1200
LONG SPAN SPACING LONG SPAN SPACING LONG SPAN SPACING
TOP BARS = 139 mm TOP BARS = 139 mm TOP BARS = 139 mm = 350 mm = 350 mm = 350 mm
MID BARS = 231 mm
BOTTOM BARS = 231 mm
MID BARS = 231 mm
BOTTOM BARS = 231 mm
MID BARS = 231 mm
BOTTOM BARS = 231 mm 3
11200
LONG SPAN SPACING: LONG SPAN SPACING: LONG SPAN SPACING:
LONG SPAN SPACING:
TOP BARS = 132 mm
LONG SPAN SPACING:
TOP BARS = 132 mm
LONG SPAN SPACING:
TOP BARS = 132 mm
4 TOP BARS = 132 mm
MID BARS = 227 mm
TOP BARS = 132 mm
MID BARS = 227 mm
TOP BARS = 132 mm
MID BARS = 227 mm
BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm
MID BARS = 227 mm MID BARS = 227 mm MID BARS = 227 mm
5000
SHORT SPAN SPACING: SHORT SPAN SPACING: SHORT SPAN SPACING:
3725
S GROUND FLOOR SLAB SUMMARY PLAN S SECOND FLOOR SLAB SUMMARY PLAN
Scale 1:100MTS
22 22 Scale 1:100MTS
17200 17200
5000 7200 5000 5000 7200 5000
1 1
LONG SPAN SPACING: LONG SPAN SPACING: LONG SPAN SPACING: LONG SPAN SPACING:
TOP BARS = 132 mm TOP BARS = 132 mm TOP BARS = 132 mm TOP BARS = 132 mm
MID BARS = 227 mm MID BARS = 227 mm MID BARS = 227 mm MID BARS = 227 mm
BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm
5000
5000
SHORT SPAN SPACING: SHORT SPAN SPACING: SHORT SPAN SPACING: SHORT SPAN SPACING:
TOP BARS = 139 mm TOP BARS = 139 mm TOP BARS = 139 mm TOP BARS = 139 mm
MID BARS = 231 mm MID BARS = 231 mm MID BARS = 231 mm MID BARS = 231 mm
BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm
2 2
1200
1200
LONG SPAN SPACING LONG SPAN SPACING LONG SPAN SPACING
= 350 mm = 350 mm = 350 mm
3 = 350 mm = 350 mm = 350 mm
3
11200
11200
LONG SPAN SPACING: LONG SPAN SPACING: LONG SPAN SPACING:
TOP BARS = 132 mm TOP BARS = 132 mm TOP BARS = 132 mm TOP BARS = 132 mm TOP BARS = 132 mm TOP BARS = 132 mm
MID BARS = 227 mm MID BARS = 227 mm MID BARS = 227 mm MID BARS = 227 mm MID BARS = 227 mm MID BARS = 227 mm
BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm
5000
5000
SHORT SPAN SPACING: SHORT SPAN SPACING: SHORT SPAN SPACING: SHORT SPAN SPACING: SHORT SPAN SPACING: SHORT SPAN SPACING:
TOP BARS = 139 mm TOP BARS = 139 mm TOP BARS = 139 mm TOP BARS = 139 mm TOP BARS = 139 mm TOP BARS = 139 mm
MID BARS = 231 mm MID BARS = 231 mm MID BARS = 231 mm MID BARS = 231 mm MID BARS = 231 mm MID BARS = 231 mm
BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm
4 4
S THIRD FLOOR SLAB SUMMARY PLAN S FOURTH FLOOR SLAB SUMMARY PLAN
Scale 1:100MTS 23 Scale 1:100MTS
23
17200 17200
5000 7200 5000 5000 7200 5000
1 1
LONG SPAN SPACING: LONG SPAN SPACING: LONG SPAN SPACING: LONG SPAN SPACING:
TOP BARS = 132 mm TOP BARS = 132 mm TOP BARS = 132 mm TOP BARS = 132 mm
MID BARS = 227 mm MID BARS = 227 mm MID BARS = 227 mm MID BARS = 227 mm
BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm
5000
5000
SHORT SPAN SPACING: SHORT SPAN SPACING: SHORT SPAN SPACING: SHORT SPAN SPACING:
TOP BARS = 139 mm TOP BARS = 139 mm TOP BARS = 139 mm TOP BARS = 139 mm
MID BARS = 231 mm MID BARS = 231 mm MID BARS = 231 mm MID BARS = 231 mm
BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm
2 2
1200
1200
LONG SPAN SPACING LONG SPAN SPACING LONG SPAN SPACING
= 350 mm = 350 mm = 350 mm
3 = 350 mm = 350 mm = 350 mm
3
11200
11200
LONG SPAN SPACING: LONG SPAN SPACING: LONG SPAN SPACING:
TOP BARS = 132 mm TOP BARS = 132 mm TOP BARS = 132 mm TOP BARS = 132 mm TOP BARS = 132 mm TOP BARS = 132 mm
MID BARS = 227 mm MID BARS = 227 mm MID BARS = 227 mm MID BARS = 227 mm MID BARS = 227 mm MID BARS = 227 mm
BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm BOTTOM BARS = 227 mm
5000
5000
SHORT SPAN SPACING: SHORT SPAN SPACING: SHORT SPAN SPACING: SHORT SPAN SPACING: SHORT SPAN SPACING: SHORT SPAN SPACING:
TOP BARS = 139 mm TOP BARS = 139 mm TOP BARS = 139 mm TOP BARS = 139 mm TOP BARS = 139 mm TOP BARS = 139 mm
MID BARS = 231 mm MID BARS = 231 mm MID BARS = 231 mm MID BARS = 231 mm MID BARS = 231 mm MID BARS = 231 mm
BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm BOTTOM BARS = 231 mm
4 4
S FIFTH FLOOR SLAB SUMMARY PLAN S ROOF DECK SLAB SUMMARY PLAN
Scale 1:100MTS Scale 1:100MTS
24 24