HRSG - WS Cold Commg.
HRSG - WS Cold Commg.
Days
HRSG/WS -220
Complete/ECCs available
-200
HRSG/WS
Preparation for Chem
Clean
Condensate System B.
Temporary Cleaning Commissioning
Drainage Equipment installed E.
and operational (to support chemical
System Cleaning)
ready
Aux Boiler
operational
Ready (or alternative Aux
Potable for Chem
Water ready Clean
steam supply) -161
Execution of
Chemical cleaning
Demi Water
Treatment
Plant
operational Commissioning E/I&C/
of Aux Steam System M
Pipe Preparation/
Post inspection
HRSG
ready to accept Main/HRH/CRH E/I&C/
Flue gas Aux Steam System M
Commissioning
Feedwater
System E/I&C/
Commissioning M
IA/SA
DCS Pneumatic Medium/
Cabinets System Low Voltage
ready available ready
Boiler
(Eco & Steam)
Commissioning
Main CW
operational E/I&C/
M
HVAC HRSG
ready Ready for steam
Blow
CW
Electro-chlor
Chemical Biocide dosing LEGEND :
Dosing/Sampling operational
operational
MAJOR
MILESTONES Aux Systems