8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 3 of 38
CONTENT
1 INTRODUCTION .............................................................................................. 5
1.1 Purpose ........................................................................................................... 5
1.2 Scope of Work ................................................................................................ 5
1.3 RAM Study Boundary..................................................................................... 6
1.4 Base Case Studies ......................................................................................... 9
1.4.1 Base Case 1 .................................................................................................... 9
1.4.2 Base Case 2 .................................................................................................... 9
1.5 Definitions and Abbreviations ....................................................................... 9
2 REFERENCE DOCUMENTS ......................................................................... 12
3 STUDY METHODOLOGY .............................................................................. 13
3.1 General .......................................................................................................... 13
3.2 Input Data ...................................................................................................... 13
3.3 Modelling Software....................................................................................... 13
3.4 Definitions ..................................................................................................... 14
3.4.1 General Reliability Terms ............................................................................ 14
3.4.2 MAROS Model Output Terminology............................................................ 16
3.5 Critical Equipment Configurations ............................................................. 17
4 System Assumptions and inputs ................................................................ 18
4.1 Capacity and System Life ............................................................................ 18
4.2 System Performance Target ........................................................................ 19
4.3 Maintenance.................................................................................................. 19
4.3.1 Spares ........................................................................................................... 19
4.3.2 Maintenance Team ....................................................................................... 19
4.4 Equipment Failure Rate and Maintenance Data Source............................ 19
4.5 Planned Maintenance and Planned Shutdown .......................................... 20
4.6 Spurious Trips Modelling ............................................................................ 20
4.7 Equipment Redundancy .............................................................................. 20
4.8 Reliability Block Diagram (RBD) ................................................................. 21
4.9 Reliability and Maintainability Data............................................................. 21
4.10 Simulation Cycles......................................................................................... 21
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 4 of 38
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 5 of 38
1 INTRODUCTION
, in partnership with the , is currently
planning to develop its upstream production facilities and infrastructure to meet a target of
1.2MMBOPD of production in the oil field in . The field consists of two
primary reservoirs, and , which will be developed as separate projects. It is envisaged
that the reservoir will produce up to 650MBOPD of the 1.2MMBOPD targeted from the entire
field. Presently the development is in the Concept phase of project execution and design.
Construction of the preliminary production facilities for the reservoir is currently underway.
WorleyParsons has been contracted to execute the Pre-FEED or SELECT phase of the
Development Project. The main focus of this phase will be to frame and assess each of the concept
development cases for the future development of the reservoir. The development cases
shall include evaluation of options for wells, gathering systems, gas and water reinjection, gas and
water treatment, a light oil export pipeline and tank farm upgrades, tie-ins to the natural gas liquids
and gas export systems and further expansion of supporting facilities and infrastructure as necessary.
The Project aims to produce a detailed Decision Support Package identifying the preferred design
options, and comprehensive FEED ITB documents for progression of the design to the FEED phase.
1.1 Purpose
The purpose of this document is to provide a project specific RAM Study describing:
1) Determine whether the upstream production facilities can meet the minimum
System Operational Availability of 95% (Ref [1]) by considering the equipment design and
configurations, current sparing and maintenance philosophy;
2) Identify and rank system and equipment that has the most significant impact on the facility
production availability for a given production profile and propose areas for improvement;
3) Perform a series of sensitivity analyses (if required) to evaluate the design with regards to
system operational availability;
4) Identify items that are major contributions for system and equipment availability losses; and
2) System familiarization;
4) Preparation of input to the model including Reliability and Maintainability Data, assumptions
to the modelling and etc. The figures shall be discussed and agreed with ;
5) Construct Reliability Block Diagram (RBD) for the selected equipment configurations. The
facilities covered as per agreed boundaries in the Process Flow Diagram and Utility Flow
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 6 of 38
7) Evaluate the production profile capability based on MAROS outputs (Excel spread sheet);
8) Recommend high level sparing philosophies and improvement in inspection and
maintenance plans;
9) Report the result and provide recommendations for further improvements in the reliability
and availability of the current design.
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 7 of 38
Stable HCC
Storage & Off Spec Export CO LPI Gas
Shipping Transfer Pipeline Pipeline
System System System System
Trunk Line
Scraper Hot Oil Cooling Water Fuel Gas
Receiver System System System
System
CPF Closed
HP Flare LP Flare LLP Flare
Drainage
System System System
System
Closed
Fuel Gas Flare System Service Water
Drainage
System (GIS) (GIS) System (GIS)
System (GIS)
PS-1 Storage
& Product
Loading
System
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 8 of 38
Gas
Oil GTP Feed Gas
Dehydration
Stabilization Gas Comp Sweetening
Water Dew
System System System
Point System
Trunkline Propane
Scraper Hot Oil Cooling Water Refrigeration
Receiver System System Compression
System System
Plant &
LLP Flare Oil Drainage Service Water
Instrument Air
System System System
System
*from
previous
page Propane Cryogenic Water
Drainage Drainage Injection Injection Well
System System System
PS-1 Storage
& Product
Loading
System
The Potable Water System and Diesel Fuel Storage & Distribution System are identified as a non-
critical to the production, thus any equipment failure related to this unit is considered negligible and
has no direct impact to the production losses and not modelled in this RAM Study. Systems in
Package are also not covered as it shall be advised by Vendor for any RAM related information. Fire
Water Pumping System configuration (including pumps) shall be as per NFPA and is considered
reliable as a separate system at this stage.
All associated PSV’s, control valves and shutdown valves are excluded in this RAM Study.
Base Case 1 shall be modelled as per operational basis for Gas Injection Concept with export
facilities modelled in Figure 1 to assess System Operational Availability which is inclusive of Planned
Shutdown.
Base Case 2 shall be modelled as per operational basis for Water Injection Concept with export
facilities modelled in Figure 2 to assess System Operational Availability which is inclusive of Planned
Shutdown.
CRT Critical
DEG Degraded
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 10 of 38
GI Gas Injection
HC Hydrocarbon
HCC Hydrocarbon
HP High Pressure
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 11 of 38
SG Sales Gas
TV Tank Vent
WI Water Injection
WP Worley Parsons
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 12 of 38
2 REFERENCE DOCUMENTS
[1] Basis of Design for Phase 3 (FEED); (Doc No. 8015-0152- -00-000-PC-BD-00001)
[2] Process Flow Diagram and Utility Flow Diagram for Gas Injection and Water Injection Rev B
[5] Equipment List for Selected Development Case Of Gas Injection Concept; 8015-0152-
-00-000-PC-EL-00015 Rev B
[6] Equipment List for Selected Development Case Of Water Injection Concept; 8015-0152-
-00-000-PC-EL-00014 Rev B
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 13 of 38
3 STUDY METHODOLOGY
The RAM methodology applied in this study is based on the British Standard, BS 5760 Reliability of
Systems, Equipment and Components (1990).
3.1 General
The study was undertaken in the following phases:
1) Define study objectives and boundary (see Section 1.2 and 1.3)
2) Identification of critical equipment and their configuration (see RBD Appendix A1/A2)
3) Preparation of input to the RAM model (see Appendix A1/A2 and B1/B2 for RBD and
Reliability & Maintainability Data Sheet);
6) Analyse the outputs from the RAM model (see Section 5.0); and
7) Report the results; provide conclusion and recommendations for further improvements in the
system availability of the current design (see Section 6.0 and 7.0).
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 14 of 38
Note:
Reliability, Availability and Maintainability (RAM) modelling is not an exact science. It is a mathematical simulation based on
Monte-Carlo techniques using a multiple-run averaging “random-number” generating software algorithm to determine down-
time event occurrence, based on statistical probabilities of failure of equipment items and statistical “average” repair times.
Values of system availability are indicative only and significant attention should be paid to the indicated values of standard
deviation illustrated by the RAM calculation software, which can be as high as 5% in some models (i.e. system availability of
94.67% ± 1.52% means that availability on the various simulation runs ranged from 93.15% to 96.19%), therefore fractional
changes in availability (less than 1.0%) can considered as negligible changes in most cases of RAM studies, depending upon
the stated Standard Deviation.
The RAM algorithm however does provide an effective “like-for-like” comparison when a single element or small group of
elements are changed for different configurations and / or reliability data to provide evaluation of their effects upon overall
system performance – “comparative designs/ sensitivity studies.”
3.4 Definitions
Before proceeding with the analysis, the definitions of several terms used in reliability studies in
general are presented here to aid the understanding of the steps involved and the results produced by
MAROS.
Terms Definition
Availability General: The ability of an item to be in a state to perform a required function, under
stated conditions at a given instant of time or over a given time interval.
NOTE: High availability can be achieved through high reliability (equipment rarely
breaks down) or maintainability (when equipment breaks down it is repaired quickly) or
a combination of both.
In other words, the proportion of total time that an item of equipment is capable of
performing its specified functions. The general observation of availability is:
Uptime
Availabili ty
Total Time
By taking different measures for uptime and downtime, different availability measures
are obtained.
Inherent availability, (Ai): It is the steady state availability when considering only the
corrective downtime of the system. It is defined as the expected level of availability for
the performance of corrective maintenance only. Inherent availability is determined
purely by the design of the equipment. Can be regarded as the Reliability (see below
for definition) of the system. It assumes that spare parts and manpower are 100%
available with no delays. It excludes logistics time, waiting or administrative downtime,
and preventive maintenance downtime. It includes corrective maintenance downtime.
Inherent availability is generally derived from analysis of an engineering design.
Inherent availability fulfills the need to distinguish expected performance between
planned shutdowns. Inherent availability is estimated as follows:
Total Uptime
Ai InherentAvailability
Total Operational Time (excluding planned shutdown)
The target for Inherent Availability for the study is not set.
Operational availability, (Ao): It is a measure of the average availability over a period
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 15 of 38
Failure Mode The effect by which a failure is observed. Within a very detailed model, a valve can
have several modes of failure, such as: fails to operate on demand, external leak etc.
A high level model of a system may include the following general failure modes:
CRT, General critical failure resulting in 100% production loss.
DEG, Degraded equipment performance, resulting in partial production loss
whilst waiting for repair and 100% loss during repair.
INC, Incipient failure. Equipment failure which did not result in immediate
production loss. The failure was found during other repair/scheduled
maintenance activities. 100% loss during repair.
UNK, No impact details recorded in database. Assumed to be no impact on
failure and 100% loss of equipment item on repair.
Failure Mode A procedure that analyses the ways a system can fail (failure modes) and determines
and Effects their impact (effect) at both the local and system levels. The analysis is always carried
Analysis out from the lowest to the highest level within the system under analysis (bottom up).
(FMEA)
Failure Rate The number of failures of an item per unit time. This can be applied to:
Observed failure rate: as computed from a sample.
Assessed failure rate: as inferred from sample information.
Extrapolated failure rate: projected to other stress levels.
Logistic Delay The waiting time associated with the procurement and transportation of: Manpower,
Tools and special equipment, and Spare parts
Maintainability The probability that a given maintenance action, for an item under stated conditions of
use, can be carried out within a given time interval. The maintenance is performed
under stated conditions and using stated procedures and resources.
Mean Time The average time between consecutive failures – calculated by dividing the cumulative
Between Failure observed time by the total number of failures.
(MTBF)
Mean Time To It is a measure of the average time taken to diagnose and restore failed equipment to
Repair (MTTR) an operational state. It does not include logistic delays.
Maintenance Equipment/personnel/spares required performing maintenance and repairing tasks.
Resource
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 16 of 38
Reliability The probability that an item can perform a required function under stated conditions for
a given period of time. The term reliability may also be used to denote the probability of
success or success ratio. It may be represented by Inherent Availability as defined.
Reliability Block A pictorial representation of the logical interdependencies (parallel or series paths)
Diagram (RBD) required for the system under analysis to function correctly.
Terms Definition
Absolute Losses The production deferred or lost due to the specified element or system, as a
percentage of the total potential production.
Production Deferredor Lost
Absolute Losses 100%
Potential Production
Availability of The percentage of time that the system produced at the maximum capacity
Max Capacity (100%).
Critical Equipment whose failure will have an identifiable / significant effect on system
Equipment performance.
Downtime The period of time during which an item is not in a condition to perform its
required function. When evaluating or considering the effects of downtime it
should be appreciated that:
The downtime of an item will include active maintenance time and delays due to
awaiting spares, labor, facilities, movement, etc.
Unless otherwise stated, the downtime due to failure is considered to commence
at the instant the item is deemed to have failed.
Efficiency Potential Efficiency
Potential Production
Potential Efficiency 100%
Design Capacity Production
Potential Production is production over the field life as determined by the
deliverability profile for the system.
Design Capacity Production is the total production over the field life when running
the facilities at their design capacity.
Required Efficiency
Required Production
Required Efficiency 100%
Potential Production
The Required Production is the total production over the field life as determined
by the input demand profile for the system.
Average Efficiency
Predicted Achieved Production
Average Efficiency 100%
Potential Production
The Predicted Achieved Production is the total production over the field life as
predicted by the model taking into account the impact of all production critical
failures.
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 17 of 38
Production Efficiency
Predicted Achieved Production
Production Efficiency 100%
Required Production
The Production Efficiency is one of the main system performance indicators
expressing the achieved production as a percentage of the required production.
Event The basic component of MAROS model. An event may be unscheduled
(equipment failure), scheduled (predefined frequency and duration) or may occur
as the consequence of other events (conditional event).
Maximum The maximum allowable capacity rating of the branch either expressed as an
Capacity absolute value as a percentage of the design capacity or as a boost factor (>1)
expressed as a multiple of the normal capacity.
Normal Capacity The capacity rating of the branch relative to the design capacity of the system
(which is nominally 100%).
Outage Period of time during which there is a complete production stoppage.
Production Production lost or deferred due to equipment outages caused by events within the
Losses model.
The RBD’s set up in MAROS are included in Appendix A1/A2. For all equipment that has redundancy,
it is assumed that there is only sufficient equipment on line to allow 100% throughput. Hence, for
system with 2x100% equipment, it is assumed that one item is running and one is on standby. More
detail on failure modes together with the assumed failure rates and active repair times are identified in
the Reliability & Maintainability (R&M) Datasheet included in Appendix B1/B2.
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 18 of 38
2017 330.4
2018 651.9
2019 654.9
2020 654.7
2021 654.7
2022 654.9
2023 654.9
2024 656.7
2025 654.5
2026 654.8
2027 654.8
2028 656.3
2029 654.4
2030 654.1
2031 654.1
2032 656.1
2033 652.3
2034 654.2
2035 - 2041 650
2017 358
2018-2041 650
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 19 of 38
The design capacity is set as per production flow rate and constant over the specified period (all
producing wells are required to function during normal operation). The model does not taken into
account the flow rate decline over time or when additional wells are brought on line. This assumption
has no bearing in the determination of probability of a system to perform as expected; however it will
help provide indication on the likelihood of the system to meet expected production. If additional wells
are to be brought in some time in future, that will represent excess capacity for the system to meet
demand, which could increase overall system efficiency.
4.3 Maintenance
4.3.1 Spares
It is assumed that all critical equipment and spares required to affect repairs to failed
equipment will normally be stored at the onshore warehouse facility. Thus, the spare parts
on the critical equipment are readily available to maintenance personnel.
Spares replenishment program is in place, i.e. new spare will be acquired whenever the
existing spare has been consumed.
It is assumed that all required planned maintenance (predictive and preventive inclusive
inspection, condition monitoring, overhauls etc) activities are completed as per established
maintenance schedule, and such activities are not deferred by significant periods of time.
Any regulatory required inspections and recertification of equipment shall be carried out
during each facility annual shutdown (if any). In this RAM simulation, the first shutdown is
planned 15 months after the commissioning, and the subsequent inspection frequency is set
at 36 months (maximum allowed; provided that the facility has good Risk Based Inspection
system and Asset Integrity Programme).
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 20 of 38
Only Critical and Degraded failures have been considered in the study. It is assumed that Incipient
and Unknown failure modes will be repaired alongside Critical and Degraded failures and they do not
cause additional downtime or loss of production in the nominated design.
Critical failures (CRT) are failures that cause immediate loss of production capacity (or part thereof).
Degraded Failures (DEG) are failures that result in partial loss of production capacity but do not bring
production to halt. Table 3 below shows failure type and their capacity loss contribution upon event
initiation.
Table 3: Failure Type and Their Contribution to Capacity Loss
Failure Type Capacity Loss at Failure (%) Capacity Loss at Repair (%)
Failure due to PSV’s, control valves and shutdown valves are excluded in this RAM Study. Sub-
Systems under package are also excluded in this modelling.
Capacity Loss at Failure and Repair for equipments in Flash Gas Compression Sub-System in Gas
Compression System for both Gas Injection Concept and Water Injection Concept is set at 0% as the
handling gas capacity is very low. Hence, it is identified as non-critical to the production, thus any
equipment failure related to this unit is considered negligible and has no direct impact to the
production losses.
Failure rates for production wells are also being considered in this RAM Study, but however since the
MTBF are very low (OREDA 2009, anatomy 5.8 p/g 138) it is considered negligible.
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 21 of 38
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 22 of 38
5.1 Summary
This section describes the results of the RAM study of the upstream production facilities for
Gas Injection Development Concept and Water Injection Development Concept. The system
performance summary is shown in Table 4 below:
Base Case 1:
System Operational
95 97.57 ± 0.04 Yes
Availability for Gas
Injection Station
Base Case 2:
System Operational
Availability for Water 95 97.75 ± 0.05 Yes
Injection Station
Both Base Cases for Gas Injection Station and Water Injection Station have met minimum system
operational availability target of 95%. Planned Shutdown activity is incorporated in both cases, and
each shutdown is modelled at 14 days outage.
8015-0152- -00-000-PC-RP-00008_IFU_Rev0.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 23 of 38
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 24 of 38
Figure 4 shows the Production Efficiency for the performance signature of Gas Injection Concept
during system life for Base Case 1. The graph is showing fluctuating pattern production efficiency in 3
years interval due to Planned Shutdown as per mentioned in earlier section.
5.2.1 System Criticality
This section describes the most significant system contributors to production losses for Base Case 1.
Figure 5 summarizes the sections or components for each category of relative losses. From the bar
chart, the top 5 most contributor of the production reliability loss is the Planned Shutdown (58.02%),
GTP Feed Gas Compression System (27.60%), Gas Dehydration Water Dew Point System (6.26%),
Plant & Instrument Air System (1.07%) and Stable HCC Storage & Shipping System (1.05%).
Detailed percentage of relative loss and absolute loss mean of the systems is being shown in Table 5.
Planned Shutdown is contributing 1.41% Absolute Loss Percentage.
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 25 of 38
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 26 of 38
This section describes the most significant equipments/elements contributors to production losses for
Base Case 1. Elements that have been identified in this RAM Study for Base Case 1, is attached in
Appendix B1 (Reliability & Maintainability Data Sheet). Table 6 summarizes the top 10 contributing
equipments towards production absolute loss for Base Case 1.
Equipments contributing most for production loss are the GTP Feed Compressor Stage 1 and 2 as
per listed above, with each contributing estimated at 0.06% Absolute Loss Mean. This is due to the
GTP Feed Gas Compression System is designed with 4x25% without redundancy, low MTBF and
high MTTR of the compressors. Most critical failures for the compressors (but not limited to) are
abnormal instrument reading, breakdown, erratic output, external leakage, fail to start/stop on
demand, high/low output, parameter deviation, overheating, spurious stop and vibration. For vessel
type, Instrument Air Receiver at Plant & Instrument Air System (GIS) contributes estimated at 0.02%
Absolute Loss Mean and Instrument Air Receiver at Plant & Instrument Air System contributes
estimated at 0.01% Absolute Loss Mean. Possible failure modes for vessels are (but not limited to)
abnormal instrument reading, external leakage, plugged/choked, structural deficiency and parameter
deviation. Details MTBF and MTTR of each equipments identified is being shown in Appendix B1.
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 27 of 38
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 28 of 38
Figure 7 shows the Production Efficiency for the performance signature of Water Injection Concept
during system life for Base Case 2. The graph is showing fluctuating pattern production efficiency in 3
years interval due to Planned Shutdown as per mentioned in earlier section.
5.3.1 System Criticality
This section describes the most significant system contributors to production losses for Base Case 2.
Figure 8 summarizes the sections or components for each category of relative losses. From the bar
chart, the top 5 most contributor of the production reliability loss is the Planned Shutdown (62.52%),
Gas Dehydration Water Dew Point System (12.06%), Butane Extraction System (4.74%), Gas
Sweetening System (3.97%) and propane Extraction System (3.36%). Detailed percentage of relative
loss and absolute loss mean of the systems is being shown in Table 7. The critical system with
compressors and gas turbine drivers or electrical motor drivers in Gas Compression System (GTP
Feed Compressor, Export Gas Compressor System and Propane Compressor System) is showing
low loss percentage as the design redundancy is adequate with 6x25% providing 2 standby trains.
Planned Shutdown is contributing 1.41% Absolute Loss Percentage.
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 29 of 38
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 30 of 38
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 31 of 38
This section describes the most significant equipments/elements contributors to production losses for
Base Case 2. Elements that have been identified in this RAM Study for Base Case 2, is attached in
Appendix B2 (Reliability & Maintainability Data Sheet). Table 8 summarizes the top 10 contributing
equipments towards production absolute loss for Base Case 2.
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 32 of 38
Equipments contributing most for production loss are the mostly vessels per listed in Table 8, with
Dehydration Contactor estimated at 0.05% and the rest 0.02% Absolute Loss Mean. GTP Feed Gas
Compression System for Water Injection Concept is designed with 6x25% with redundancy of 2
standby trains and therefore did not arise as top contributors towards production loss. For vessel type,
possible failure modes are (but not limited to) abnormal instrument reading, external leakage,
plugged/choked, structural deficiency and parameter deviation. Details MTBF and MTTR of each
equipments identified is being shown in Appendix B2.
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 33 of 38
6 CONCLUSION
Based on 2 base cases simulated by MAROS, both of Gas Injection Concept and Water Injection
Concept System Operational Availability meets the minimum target of 95%.
System Operational Availability resulted in 97.57% and 97.75% for Gas Injection Concept and Water
Injection Concept respectively. Both cases Planned Shutdown is modelled for 14 days is showing
same unavailability result of 1.41%. Base Case 1 for Gas Injection Concept System Operational
Availability is lower than Base Case 2 for Water Injection Concept due to GTP Feed Gas Compressor
System is designed as 4x25% compared to 6x25% for Water Injection Concept.
In subsystems level, top 3 most contributing towards production lost that can be concluded for Gas
Injection Concept are GTP Feed Gas Compression System, Gas Dehydration Water Dew Point
System and Plant & Instrument Air System. Top 3 most contributing subsystems towards production
loss for Water Injection Concept are Gas Dehydration Water Dew Point System, Butane Extraction
System and Gas Sweetening System.
In equipment level, items contributing impact towards production loss are Compressors for Gas
Injection Concept and vessels for Water Injection Concept identified as Dehydration Contactors &
Overhead Separator at Gas Dehydration Water Dew Point System, Low Temperature Separators at
Gas HC Dew Point System and Deethaniser/Depropaniser/Debutaniser Reflux Drums. Equipment
level Absolute Loss Mean percentage is not more than 0.07% for both cases.
Equipments with low MTBF and high MTTR such as compressors gas turbines drivers and electric
drivers in Water Injection Concept are well designed with redundancies and not surfaced as major
contributors of production loss.
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 34 of 38
7 RECOMMENDATION
Based from this RAM study, here are some of the recommendations to consider:
1. To keep within strong provisions of the Preventive and Predictive Maintenance of the
Compressors and motor driver either electric driven or Gas Turbine, especially in GTP
Feed Gas, which operating without redundancy for Gas Injection Concept. Those
activities will help to avoid compressor failures from affecting production efficiency.
Potential failure modes such as (but not limited to) abnormal instrument reading,
breakdown, erratic output, external leakage, fail to start/stop on demand, high/low output,
parameter deviation, overheating, spurious stop, vibration and others.
2. To provide redundancy in GTP Feed Gas Compressor for Gas Injection Concept
whereby currently running 4x25% without redundancy.
4. To keep within strong provisions of the Preventive and Predictive Maintenance of level,
pressure or temperature instruments for vessels in the system especially Contactors,
Separators and Reflux Drum. Common potential failure mode from OREDA for vessel
equipment is abnormalities in instrument reading. Such activities could improve the
overall production efficiency of the upstream production facility.
6. Since this is Pre FEED RAM study, it is highly recommended to perform RAM Study
during subsequent phases.
8015-0152- -00-000-PC-RP-00008_IFU.docx
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 35 of 38
APPENDIX A1
BASE CASE 1 RELIABILITY BLOCK DIAGRAM FOR GI CONCEPT CASE
(TOTAL: 35 PAGES)
8015-0152- -00-000-PC-RP-00008_IFU.docx
GAS INJECTION BC_IFU
Network Diagram
Rev 14.03.13
By: CHK:
Production Well Pad
Production Well Drain Drum
7.14 %
7.14 %
7.14 %
7.14 %
7.14 %
7.14 %
7.14 %
7.14 %
7.14 %
7.14 %
7.14 %
7.14 %
7.18 %
Rev 14.03.13
By: CHK:
Inlet Manifold & Slug Catcher
Tag: 20-201-01-Z-00...
Tag: 20-201-01-Z-00...
Rev 14.03.13
By: CHK:
Gas / Oil / Water Separation System
Desalter Crude Feed Desalter Crude Feed
Pump Pump Motor
100 %
Rev 14.03.13
By: CHK:
Oil Desalting System
Desalter Service Desalter Service Desalter Effluent Desalter Effluent
W ater Feed Pump W ater Feed Pump Pump Pump Motor
100 % Motor 100 %
Tag: 22-215-01-P-0...
Motor
Tag: 22-215-01-PM-...
100 %
Rev 14.03.13
By: CHK:
Oil Stabilization System
Stabilizer Bottom Stabilizer Bottom Degassed Crude Degassed Crude
Pump Pump Motor Pump Pump Motor
100 % 100 %
Rev 14.03.13
By: CHK:
GTP Feed Gas Compression System
GTP Feed GTP Feed Comp
Compressor Condensate Pump
100 % Condensate Pump Motor
Tag: 22-280-01-P-... Tag: 22-280-01-P...
1st Stage Comp 1st Stage GTP Feed GTP Feed GTP Feed 1stStage GTP Feed 1-GTP Feed Comp 2nd Stage Comp 2nd Stage GTP GTP Feed GTP Feed 2ndStage GTP Feed 2-GTP Feed Comp 2-GTP Feed Comp 2nd Stage GTP
Sour Liquid GTP Feed Compressor Condensate Pump Comp Suction KO Compressor Stage-1 Compressor Motor Comp Discharge Discharge Cooler Sour Liquid Feed Comp Suction Compressor Stage-2 Compressor Motor Comp Discharge Discharge Cooler Discharge Trim Feed Comp
25 % Separator Drum (LP) Stage-1 (LP) Cooler Motor Separator KOD (HP) Stage-2 (HP) Cooler Motor Cooler Discharge KOD
Tag: 22-280-01-V-... GTP Feed GTP Feed Comp Tag: 22-280-01-V-... Tag: 22-280-01-K-... Tag: 22-280-01-K... Tag: 22-280-01-E-... Tag: 22-280-01-E... Tag: 22-280-01-V-... Tag: 22-280-01-V-... Tag: 22-280-01-K-... Tag: 22-280-01-K... Tag: 22-280-01-E-... Tag: 22-280-01-E... Tag: 22-280-01-E-... Tag: 22-280-01-V-...
Compressor Condensate Pump
100 % Condensate Pump Motor
Tag: 22-280-01-P-... Tag: 22-280-01-P...
Rev 14.03.13
By: CHK:
Gas Dehydration Water Dew Point System TEG Circulation Pump TEG Circulation Pump
Motor
Glycol Cartridge Filter Glycol Charcoal Filter TEG Regeneration
Bottom Pump
TEG Regeneration
Bottom Pump Motor
Hot Oil Circulating
Pump
Hot Oil Circulating
Pump Motor
100 % 100 % 100 % 100 % 100 %
Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-FL-. .. Tag: 21-244-01-FL-. .. Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-P-0... Tag: 21-244-01-PM...
Dehydration Contactor Lean TEG Cooler Lean Glycol Surge Cold Lean / Rich TEG Rich Glycol Flash Drum Hot Lean / Rich TEG Overhead Separator Dehydration Glycol Reboiler Reflux Condenser TEG Drain Drum TEG Drain Drum Pump TEG Drain Drum Pump
Drum TEG Circulation Pump Exchanger Glycol Cartr idge Filter Glycol Charcoal Filter Exchanger Regener ator Dehydrated Gas TEG Regeneration Bottom Pump Hot Oil Circulating Pump Motor
25 %
Tag: 21-244-01-T-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-T-0... Tag: 21-244-01-E-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-P-0... Tag: 21-244-01-PM...
TEG Circulation Pump TEG Circulation Pump Glycol Cartridge Filter Glycol Charcoal Filter TEG Regeneration TEG Regeneration Hot Oil Circulating Hot Oil Circulating
Motor Bottom Pump Bottom Pump Motor Pump Pump Motor
100 % 100 % 100 % 100 % 100 %
Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-FL-. .. Tag: 21-244-01-FL-. .. Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-P-0... Tag: 21-244-01-PM...
TEG Circulation Pump TEG Circulation Pump Glycol Cartridge Filter Glycol Charcoal Filter TEG Regeneration TEG Regeneration Hot Oil Circulating Hot Oil Circulating
Motor Bottom Pump Bottom Pump Motor Pump Pump Motor
100 % 100 % 100 % 100 % 100 %
Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-FL-. .. Tag: 21-244-01-FL-. .. Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-P-0... Tag: 21-244-01-PM...
Dehydration Contactor Lean TEG Cooler Lean Glycol Surge Cold Lean / Rich TEG Rich Glycol Flash Drum Hot Lean / Rich TEG Overhead Separator Dehydration Glycol Reboiler Reflux Condenser TEG Drain Drum TEG Drain Drum Pump TEG Drain Drum Pump
Drum TEG Circulation Pump Exchanger Glycol Cartr idge Filter Glycol Charcoal Filter Exchanger Regener ator Dehydrated Gas TEG Regeneration Bottom Pump Hot Oil Circulating Pump Motor
25 %
Tag: 21-244-01-T-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-T-0... Tag: 21-244-01-E-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-P-0... Tag: 21-244-01-PM...
TEG Circulation Pump TEG Circulation Pump Glycol Cartridge Filter Glycol Charcoal Filter TEG Regeneration TEG Regeneration Hot Oil Circulating Hot Oil Circulating
Motor Bottom Pump Bottom Pump Motor Pump Pump Motor
100 % 100 % 100 % 100 % 100 %
Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-FL-. .. Tag: 21-244-01-FL-. .. Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-P-0... Tag: 21-244-01-PM...
TEG Circulation Pump TEG Circulation Pump Glycol Cartridge Filter Glycol Charcoal Filter TEG Regeneration TEG Regeneration Hot Oil Circulating Hot Oil Circulating
Motor Bottom Pump Bottom Pump Motor Pump Pump Motor
100 % 100 % 100 % 100 % 100 %
Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-FL-. .. Tag: 21-244-01-FL-. .. Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-P-0... Tag: 21-244-01-PM...
Dehydration Contactor Lean TEG Cooler Lean Glycol Surge Cold Lean / Rich TEG Rich Glycol Flash Drum Hot Lean / Rich TEG Overhead Separator Dehydration Glycol Reboiler Reflux Condenser TEG Drain Drum TEG Drain Drum Pump TEG Drain Drum Pump
Drum TEG Circulation Pump Exchanger Glycol Cartr idge Filter Glycol Charcoal Filter Exchanger Regener ator Dehydrated Gas TEG Regeneration Bottom Pump Hot Oil Circulating Pump Motor
25 %
Tag: 21-244-01-T-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-T-0... Tag: 21-244-01-E-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-P-0... Tag: 21-244-01-PM...
TEG Circulation Pump TEG Circulation Pump Glycol Cartridge Filter Glycol Charcoal Filter TEG Regeneration TEG Regeneration Hot Oil Circulating Hot Oil Circulating
Motor Bottom Pump Bottom Pump Motor Pump Pump Motor
100 % 100 % 100 % 100 % 100 %
Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-FL-. .. Tag: 21-244-01-FL-. .. Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-P-0... Tag: 21-244-01-PM...
TEG Circulation Pump TEG Circulation Pump Glycol Cartridge Filter Glycol Charcoal Filter TEG Regeneration TEG Regeneration Hot Oil Circulating Hot Oil Circulating
Motor Bottom Pump Bottom Pump Motor Pump Pump Motor
100 % 100 % 100 % 100 % 100 %
Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-FL-. .. Tag: 21-244-01-FL-. .. Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-P-0... Tag: 21-244-01-PM...
Dehydration Contactor Lean TEG Cooler Lean Glycol Surge Cold Lean / Rich TEG Rich Glycol Flash Drum Hot Lean / Rich TEG Overhead Separator Dehydration Glycol Reboiler Reflux Condenser TEG Drain Drum TEG Drain Drum Pump TEG Drain Drum Pump
Drum TEG Circulation Pump Exchanger Glycol Cartr idge Filter Glycol Charcoal Filter Exchanger Regener ator Dehydrated Gas TEG Regeneration Bottom Pump Hot Oil Circulating Pump Motor
25 %
Tag: 21-244-01-T-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-T-0... Tag: 21-244-01-E-0... Tag: 21-244-01-E-0... Tag: 21-244-01-V-0... Tag: 21-244-01-P-0... Tag: 21-244-01-PM...
TEG Circulation Pump TEG Circulation Pump Glycol Cartridge Filter Glycol Charcoal Filter TEG Regeneration TEG Regeneration Hot Oil Circulating Hot Oil Circulating
Motor Bottom Pump Bottom Pump Motor Pump Pump Motor
100 % 100 % 100 % 100 % 100 %
Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-FL-. .. Tag: 21-244-01-FL-. .. Tag: 21-244-01-P-0... Tag: 21-244-01-PM... Tag: 21-244-01-P-0... Tag: 21-244-01-PM...
Rev 14.03.13
By: CHK:
Flash Gas Compression System
Flash Gas Flash Gas
Condensate Pump Condensate Pump
100 % Motor
Tag: 21-280-01-V-0... Tag: 21-280-01-K-0... Tag: 21-280-01-KM-... Tag: 21-280-01-E-0... Tag: 21-280-01-V-0... Tag: 21-280-01-K-0... Tag: 21-280-01-E-0... Tag: 21-280-01-V-0...
Flash Gas Flash Gas
Condensate Pump Condensate Pump
100 % Motor
Rev 14.03.13
By: CHK:
Export Crude Export Crude Export Crude Main Export Crude Main
Booster Pump Booster Pump Motor Pump Pump Motor
25 % 25 %
Stabilized Crude Oil Stabilized Crude Oil Export Crude Export Crude Export Crude Main Export Crude Main
Tank Tank Motor Booster Pump Booster Pump Motor Pump Pump Motor
33.3 % 25 % 25 %
Tag: 22-411-00-TK-0... Tag: 22-411-00-TKM... Tag: 22-414-00-P-00... Tag: 22-414-00-PM-0... Tag: 22-414-00-P-00... Tag: 22-414-00-PM-0...
Stabilized Crude Oil Tank Export Crude Booster Pump Export Crude Main Pump
Stabilized Crude Oil Stabilized Crude Oil Export Crude Export Crude Export Crude Main Export Crude Main
Tank Tank Motor Booster Pump Booster Pump Motor Pump Pump Motor
33.3 % 25 % 25 %
Tag: 22-411-00-TK-0... Tag: 22-411-00-TKM... Tag: 22-414-00-P-00... Tag: 22-414-00-PM-0... Tag: 22-414-00-P-00... Tag: 22-414-00-PM-0...
Stabilized Crude Oil Stabilized Crude Oil Export Crude Export Crude Export Crude Main Export Crude Main
Tank Tank Motor Booster Pump Booster Pump Motor Pump Pump Motor
33.4 % 25 % 25 %
Tag: 22-411-00-TK-0... Tag: 22-411-00-TKM... Tag: 22-414-00-P-00... Tag: 22-414-00-PM-0... Tag: 22-414-00-P-00... Tag: 22-414-00-PM-0...
Export Crude Export Crude Export Crude Main Export Crude Main
Booster Pump Booster Pump Motor Pump Pump Motor
25 % 25 %
Rev 14.03.13
By: CHK:
Off Spec/Inter Tank Off Spec/Inter Tank
Off Spec Transfer System Transfer Pump Transfer Pump Motor
50 %
Tag: 22-411-00-TK-0...
Off Spec/Inter Tank Off Spec/Inter Tank
Transfer Pump Transfer Pump Motor
50 %
Rev 14.03.13
By: CHK:
Export CO Pipeline System
Rev 14.03.13
By: CHK:
LPI Gas Pipeline System
Tag: 60-600-01-Z-005
LPI Gas Pipeline System
Rev 14.03.13
By: CHK:
Trunk Line Scraper Receiver System
Tag: 20-201-01-Z-00...
Tag: 20-201-01-Z-00...
Trunk Line Scraper Receiver
Tag: 20-201-01-Z-00...
Tag: 20-201-01-Z-00...
Rev 14.03.13
By: CHK:
Hot Oil Feed
Hot Oil System (Make-Up) Filters
100 %
Tag: 30-316-00-FL-0...
Hot Oil Unloading Hot Oil Unloading Hot Oil Storage Tank Hot Oil Feed Hot Oil Feed Hot Oil Expansion
Pump Pump Motor (Make-Up) Pump (Make-Up) Pump Hot Oil Feed (Make-Up) Filters Drum
Motor
Tag: 30-316-00-P-004 Tag: 30-316-00-PM-0... Tag: 30-316-00-TK-0... Tag: 30-316-00-P-001 Tag: 30-316-00-PM-0... Tag: 30-316-00-V-001
Hot Oil Feed
(Make-Up) Filters
100 %
Tag: 30-316-00-FL-0...
Hot Oil Side Stream Hot Oil Circulation Hot Oil Circulation
Filter Pump Pump Motor
50 % 25 %
Hot Oil Side Stream Hot Oil Circulation Hot Oil Circulation Hot Oil Bypass Hot Oil Bypass
Filter Pump Pump Motor Cooler Cooler Motor
50 % 25 %
Tag: 30-316-00-FL-0... Tag: 30-316-00-P-00... Tag: 30-316-00-PM-0... Tag: 30-316-00-E-001 Tag: 30-316-00-EM-0...
Hot Oil Side Stream Hot Oil Circulation Hot Oil Circulation
Filter Pump Pump Motor
50 % 25 %
Rev 14.03.13
By: CHK:
Hot Oil Fired Heater
25 %
Tag: 30-316-00-H-00...
25 %
Tag: 30-316-00-H-00...
Hot Oil Drain Drum Hot Oil Drain Drum Hot Oil Drain Drum
Hot Oil Fired Heater Pump Pump Motor
Tag: 30-316-00-H-00...
25 %
Tag: 30-316-00-H-00...
Rev 14.03.13
By: CHK:
Cooling Water Cooling Water
Circulation Pump Circulation Pump
25 % Motor
Tag: 30-335-00-P-00... Tag: 30-335-00-PM-0...
50 %
Rev 14.03.13
By: CHK:
Fuel Gas System
Rev 14.03.13
By: CHK:
HP Flare Pump HP Flare Pump
Motor
50 %
HP Flare System
HP Flare System
Rev 14.03.13
By: CHK:
LP Flare Pump LP Flare Pump Motor
50 %
50 %
LP Flare System
LP Flare System
Rev 14.03.13
By: CHK:
LLP Flare Pump LLP Flare Pump
LLP Flare System Motor
100 %
Tag: 30-420-00-V-004
LLP Flare Pump LLP Flare Pump
Motor
100 %
Rev 14.03.13
By: CHK:
CPF Closed Drainage System
CPF Closed Drain CPF Closed Drain CPF Closed Drain CPF Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
16.66
%
Tag: 22-451-01-V-00... Tag: 22-451-01-P-00... Tag: 22-451-01-PM-0... Tag: 22-451-01-E-00...
CPF Closed Drain CPF Closed Drain CPF Closed Drain CPF Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
16.66
%
Tag: 22-451-01-V-00... Tag: 22-451-01-P-00... Tag: 22-451-01-PM-0... Tag: 22-451-01-E-00...
CPF Closed Drain CPF Closed Drain CPF Closed Drain CPF Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
16.66
%
Tag: 22-451-01-V-00... Tag: 22-451-01-P-00... Tag: 22-451-01-PM-0... Tag: 22-451-01-E-00...
CPF Closed Drain
CPF Closed Drain CPF Closed Drain CPF Closed Drain CPF Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
16.66
%
Tag: 22-451-01-V-00... Tag: 22-451-01-P-00... Tag: 22-451-01-PM-0... Tag: 22-451-01-E-00...
CPF Closed Drain CPF Closed Drain CPF Closed Drain CPF Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
16.66
%
Tag: 22-451-01-V-00... Tag: 22-451-01-P-00... Tag: 22-451-01-PM-0... Tag: 22-451-01-E-00...
CPF Closed Drain CPF Closed Drain CPF Closed Drain CPF Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
16.7 %
Rev 14.03.13
By: CHK:
Oil Drainage System
Rev 14.03.13
By: CHK:
Plant & Instrument Air System
Instrument Air
Emergency Hold Up
50 % Vessel
Tag: 30-322-00-V-00...
Instrument Air Plant Air Receiver
Instrument Air Emergency Hold Up Vessel Receiver
Rev 14.03.13
By: CHK:
Desalter Service Water System
Rev 14.03.13
By: CHK:
Service Water Circulation System
Rev 14.03.13
By: CHK:
Injection Gas Compression System
1st Stage GI Comp GI Compressor Stage GI Gas Turbine Stage 1st Stage GI Comp 1stStage GI Comp 2nd Stage GI Comp GI Compressor Stage GI Gas Turbine Stage 2nd Stage GI Comp 2ndStage GI Comp
Suction KO Drum 1 1 Discharge Cooler Discharge Cooler Suction KO Drum 2 2 Discharge Cooler Discharge Cooler
16.66 % Motor Motor
Tag: 10-280-01-V-00... Tag: 10-280-01-K-00... Tag: 10-280-01-GT-... Tag: 10-280-01-E-00... Tag: 10-280-01-EM-... Tag: 10-280-01-V-00... Tag: 10-280-01-K-00... Tag: 10-280-01-GT-... Tag: 10-280-01-E-00... Tag: 10-280-01-EM-...
1st Stage GI Comp GI Compressor Stage GI Gas Turbine Stage 1st Stage GI Comp 1stStage GI Comp 2nd Stage GI Comp GI Compressor Stage GI Gas Turbine Stage 2nd Stage GI Comp 2ndStage GI Comp
Suction KO Drum 1 1 Discharge Cooler Discharge Cooler Suction KO Drum 2 2 Discharge Cooler Discharge Cooler
16.66 % Motor Motor
Tag: 10-280-01-V-00... Tag: 10-280-01-K-00... Tag: 10-280-01-GT-... Tag: 10-280-01-E-00... Tag: 10-280-01-EM-... Tag: 10-280-01-V-00... Tag: 10-280-01-K-00... Tag: 10-280-01-GT-... Tag: 10-280-01-E-00... Tag: 10-280-01-EM-...
1st Stage GI Comp GI Compressor Stage GI Gas Turbine Stage 1st Stage GI Comp 1stStage GI Comp 2nd Stage GI Comp GI Compressor Stage GI Gas Turbine Stage 2nd Stage GI Comp 2ndStage GI Comp
Suction KO Drum 1 1 Discharge Cooler Discharge Cooler Suction KO Drum 2 2 Discharge Cooler Discharge Cooler
16.66 % Motor Motor
Tag: 10-280-01-V-00... Tag: 10-280-01-K-00... Tag: 10-280-01-GT-... Tag: 10-280-01-E-00... Tag: 10-280-01-EM-... Tag: 10-280-01-V-00... Tag: 10-280-01-K-00... Tag: 10-280-01-GT-... Tag: 10-280-01-E-00... Tag: 10-280-01-EM-...
Gas Injection Compressor
1st Stage GI Comp GI Compressor Stage GI Gas Turbine Stage 1st Stage GI Comp 1stStage GI Comp 2nd Stage GI Comp GI Compressor Stage GI Gas Turbine Stage 2nd Stage GI Comp 2ndStage GI Comp
Suction KO Drum 1 1 Discharge Cooler Discharge Cooler Suction KO Drum 2 2 Discharge Cooler Discharge Cooler
16.66 % Motor Motor
Tag: 10-280-01-V-00... Tag: 10-280-01-K-00... Tag: 10-280-01-GT-... Tag: 10-280-01-E-00... Tag: 10-280-01-EM-... Tag: 10-280-01-V-00... Tag: 10-280-01-K-00... Tag: 10-280-01-GT-... Tag: 10-280-01-E-00... Tag: 10-280-01-EM-...
1st Stage GI Comp GI Compressor Stage GI Gas Turbine Stage 1st Stage GI Comp 1stStage GI Comp 2nd Stage GI Comp GI Compressor Stage GI Gas Turbine Stage 2nd Stage GI Comp 2ndStage GI Comp
Suction KO Drum 1 1 Discharge Cooler Discharge Cooler Suction KO Drum 2 2 Discharge Cooler Discharge Cooler
16.66 % Motor Motor
Tag: 10-280-01-V-00... Tag: 10-280-01-K-00... Tag: 10-280-01-GT-... Tag: 10-280-01-E-00... Tag: 10-280-01-EM-... Tag: 10-280-01-V-00... Tag: 10-280-01-K-00... Tag: 10-280-01-GT-... Tag: 10-280-01-E-00... Tag: 10-280-01-EM-...
1st Stage GI Comp GI Compressor Stage GI Gas Turbine Stage 1st Stage GI Comp 1stStage GI Comp 2nd Stage GI Comp GI Compressor Stage GI Gas Turbine Stage 2nd Stage GI Comp 2ndStage GI Comp
Suction KO Drum 1 1 Discharge Cooler Discharge Cooler Suction KO Drum 2 2 Discharge Cooler Discharge Cooler
16.7 % Motor Motor
Tag: 10-280-01-V-00... Tag: 10-280-01-K-00... Tag: 10-280-01-GT-... Tag: 10-280-01-E-00... Tag: 10-280-01-EM-... Tag: 10-280-01-V-00... Tag: 10-280-01-K-00... Tag: 10-280-01-GT-... Tag: 10-280-01-E-00... Tag: 10-280-01-EM-...
Rev 14.03.13
By: CHK:
HPI Gas Pipeline System
Rev 14.03.13
By: CHK:
Injection Well
Injection Well
7.69 %
Tag: 11-XXX-00-PK-...
Injection Well
7.69 %
Tag: 11-XXX-00-PK-...
Injection Well
7.69 %
Tag: 11-XXX-00-PK-...
Injection Well
7.69 %
Tag: 11-XXX-00-PK-...
Injection Well
7.69 %
Tag: 11-XXX-00-PK-...
Injection Well
7.69 %
Tag: 11-XXX-00-PK-...
Injection Well
Injection Well
7.69 %
Tag: 11-XXX-00-PK-...
Injection Well
7.69 %
Tag: 11-XXX-00-PK-...
Injection Well
7.69 %
Tag: 11-XXX-00-PK-...
Injection Well
7.69 %
Tag: 11-XXX-00-PK-...
Injection Well
7.69 %
Tag: 11-XXX-00-PK-...
Injection Well
Injection Well
Rev 14.03.13
By: CHK:
Plant & Instrument Air System (GIS)
Rev 14.03.13
By: CHK:
Fuel Gas System (GIS)
Tag: 10-322-00-V-001
Fuel Gas System (GIS)
Rev 14.03.13
By: CHK:
Flare System (GIS)
GIS HP Flare KO GIS HP Flare KO GIS HP Flare Pump GIS HP Flare Pump
Drum Drum Electric Heater Motor
50 %
GIS HP Flare KO GIS HP Flare KO GIS HP Flare Pump GIS HP Flare Pump
Drum Drum Electric Heater Motor
50 %
Rev 14.03.13
By: CHK:
Service Water System (GIS)
Service/Fire Water
Storage Tank
50 %
Tag: 30-337-00-TK-0...
Service/Fire Water Storage Tank
Service/Fire Water
Storage Tank
50 %
Tag: 30-337-00-TK-0...
Rev 14.03.13
By: CHK:
Closed Drainage System (GIS)
Rev 14.03.13
By: CHK:
PS-1 Storage and Product Loading System
Rev 14.03.13
By: CHK:
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 36 of 38
APPENDIX A2
BASE CASE 2 RELIABILITY BLOCK DIAGRAM FOR WI CONCEPT CASE
(TOTAL: 43 PAGES)
8015-0152- -00-000-PC-RP-00008_IFU.docx
WATER INJECTION BC_IFU
Network Diagram
Rev 14.03.13
By: CHK:
Production Well Pad
Production Well Drain Drum
5.88 %
5.88 %
5.88 %
5.88 %
5.88 %
5.88 %
5.88 %
5.88 %
5.88 %
5.88 %
5.88 %
5.88 %
5.88 %
5.88 %
Rev 14.03.13
By: CHK:
Inlet Manifold & Slug Catcher
Tag: 20-201-01-Z-002A
Tag: 20-201-01-Z-002D
Rev 14.03.13
By: CHK:
Gas / Oil / Water Separation System
Desalter Service
Water Break Drum
Tag: 22-215-01-P-00... Tag: 22-215-01-PM-...
Desalter Effluent
Cooler
Desalter Effluent
Degassing Drum
Tag: 22-215-01-P-00... Tag: 22-215-01-PM-...
Reliability Block Diagram 5 of 4
Desalter Service W ater Feed Pump Desalter Effluent Pump
16.7 %
Tag: 22-215-01-V-00...
Desalter Service
Water Feed Pump
Desalter Service
Water Feed Pump
Tag: 22-215-01-E-00... Tag: 22-215-01-V-00...
Desalter Effluent
Pump
Desalter Effluent
Pump Motor
Oil Desalting System
100 % Motor 100 %
Rev 14.03.13
By: CHK:
GTP Feed Gas Compression System
GTP Feed GTP Feed Comp
Compressor Condensate Pump
100 % Condensate Pump Motor
Tag: 22-280-01-P-... Tag: 22-280-01-P...
1st Stage Comp Sour 1st Stage GTP Feed GTP Feed GTP Feed 1stStage GTP Feed 1-GTP Feed Comp 2nd Stage Comp 2nd Stage GTP Feed GTP Feed Sour Gas 2ndStage GTP Feed 2-GTP Feed Comp 2-GTP Feed Comp 2nd Stage GTP Feed
Liquid Separator GTP Feed Compressor Condensate Pump Comp Suction KO Compressor Stage-1 Compressor Motor Comp Discharge Discharge Cooler Sour Liquid Comp Suction KOD Compressor Stage-2 Superheater Comp Discharge Discharge Cooler Discharge Trim Comp Discharge
25 % Drum (LP) Stage-1 (LP) Cooler Motor Separator (HP) Cooler Motor Cooler KOD
Tag: 22-280-01-V-... GTP Feed GTP Feed Comp Tag: 22-280-01-V-... Tag: 22-280-01-K-... Tag: 22-280-01-K... Tag: 22-280-01-E-... Tag: 22-280-01-E... Tag: 22-280-01-V-... Tag: 22-280-01-V-... Tag: 22-280-01-K-... Tag: 22-280-01-E-... Tag: 22-280-01-E-... Tag: 22-280-01-E... Tag: 22-280-01-E-... Tag: 22-280-01-V-...
Compressor Condensate Pump
100 % Condensate Pump Motor
Tag: 22-280-01-P-... Tag: 22-280-01-P...
Feed Gas Filter Gas Amine Amine Regenerator Amine Regenerator Amine Regenerator Lean Amine Regen Lean Amine Regen Regenerator Regenerator Reflux Hot Oil C irculation Hot Oil C irc ulation Lean Amine Lean Amine Carbon Lean Amine Lean Amine
Separator Absorber OH Condenser OH Condenser Ref lux Pump Ref lux Pump Motor Reboiler Drum Pump Pump Motor Prefilter Filter Circ ulation Pump Circ ulation Pump
100 % 50 % 50 % 50 % 50 % 50 % 50 % 50 % 100 % 100 % 100 %
Motor Motor
Tag: 21-241-0... Tag: 21- 241- 0... Tag: 21-241- 0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241- 0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241- 0...
Lean Amine Cooler Lean Amine Cooler Amine Flash Drum Lean/Rich Amine Amine Drain Drum Amine Drain Drum Amine Drain Drum
Feed Gas Filter Separator Gas Amine Abs orber Motor Exchanger Amine Regenerator Amine Regenerator OH Condenser Lean Amine Regen Ref lux Pump Motor Regenerator Reboiler Regenerator Reflux Drum Hot Oil C irculation Pump Lean Amine Prefilter Lean Amine Carbon Filter Lean Amine Circulation Pump Pump Pump Motor
50 %
Feed Gas Filter Gas Amine Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Amine Regenerator Amine Regenerator Amine Regenerator Lean Amine Regen Lean Amine Regen Regenerator Regenerator Reflux Hot Oil C irculation Hot Oil C irc ulation Lean Amine Lean Amine Carbon Lean Amine Lean Amine Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0...
Separator Absorber OH Condenser OH Condenser Ref lux Pump Ref lux Pump Motor Reboiler Drum Pump Pump Motor Prefilter Filter Circ ulation Pump Circ ulation Pump
100 % 50 % 50 % 50 % 50 % 50 % 50 % 50 % 100 % 100 % 100 %
Motor Motor
Tag: 21-241-0... Tag: 21- 241- 0... Tag: 21-241- 0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241- 0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241- 0...
Lean Amine Regen Lean Amine Regen Hot Oil C irculation Hot Oil C irc ulation
Ref lux Pump Ref lux Pump Motor Pump Pump Motor
50 % 50 %
Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0...
Lean Amine Regen Lean Amine Regen Hot Oil C irculation Hot Oil C irc ulation
Ref lux Pump Ref lux Pump Motor Pump Pump Motor
50 % 50 %
Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0...
Feed Gas Filter Gas Amine Amine Regenerator Amine Regenerator Amine Regenerator Lean Amine Regen Lean Amine Regen Regenerator Regenerator Reflux Hot Oil C irculation Hot Oil C irc ulation Lean Amine Lean Amine Carbon Lean Amine Lean Amine
Separator Absorber OH Condenser OH Condenser Ref lux Pump Ref lux Pump Motor Reboiler Drum Pump Pump Motor Prefilter Filter Circ ulation Pump Circ ulation Pump
100 % 50 % 50 % 50 % 50 % 50 % 50 % 50 % 100 % 100 % 100 %
Motor Motor
Tag: 21-241-0... Tag: 21- 241- 0... Tag: 21-241- 0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241- 0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241- 0...
Lean Amine Cooler Lean Amine Cooler Amine Flash Drum Lean/Rich Amine Amine Drain Drum Amine Drain Drum Amine Drain Drum
Feed Gas Filter Separator Gas Amine Abs orber Motor Exchanger Amine Regenerator Amine Regenerator OH Condenser Lean Amine Regen Ref lux Pump Motor Regenerator Reboiler Regenerator Reflux Drum Hot Oil C irculation Pump Lean Amine Prefilter Lean Amine Carbon Filter Lean Amine Circulation Pump Pump Pump Motor
50 %
Feed Gas Filter Gas Amine Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Amine Regenerator Amine Regenerator Amine Regenerator Lean Amine Regen Lean Amine Regen Regenerator Regenerator Reflux Hot Oil C irculation Hot Oil C irc ulation Lean Amine Lean Amine Carbon Lean Amine Lean Amine Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0...
Separator Absorber OH Condenser OH Condenser Ref lux Pump Ref lux Pump Motor Reboiler Drum Pump Pump Motor Prefilter Filter Circ ulation Pump Circ ulation Pump
100 % 50 % 50 % 50 % 50 % 50 % 50 % 50 % 100 % 100 % 100 %
Motor Motor
Tag: 21-241-0... Tag: 21- 241- 0... Tag: 21-241- 0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241- 0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241- 0...
Lean Amine Regen Lean Amine Regen Hot Oil C irculation Hot Oil C irc ulation
Ref lux Pump Ref lux Pump Motor Pump Pump Motor
50 % 50 %
Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0... Tag: 21-241-0...
Amine Storage Tank Amine Make Up Amine Make Up Amine Wash Tank Amine Wash Tank Amine Wash Tank
Pump Pump Motor Pump Pump Motor
Tag: 21-241-01-TK-001 Tag: 21-241-01-P-005 Tag: 21-241-01-PM-0... Tag: 21-241-01-TK-002 Tag: 21-241-01-P-006 Tag: 21-241-01-PM-0...
Rev 14.03.13
By: CHK:
Gas Dehydration Water Dew Point System Dehydration Inlet Dehydration Inlet TEG Circ ulation TEG Circ ulation Gly col Cartridge Glyc ol Charcoal TEG Regener ation TEG Regeneration Hot Oil C irc ulating Hot Oil C irc ulating
KO Drum Pump KO Drum Pump Pump Pump Motor Filter Filter Bottom Pump Bottom Pump Motor Pump Pump Motor
100 % Motor 100 % 100 % 100 % 100 % 100 %
Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244- 0... Tag: 21-244- 0... Tag: 21- 244- 0... Tag: 21-244-0... Tag: 21-244-0...
Sweet Gas Cooler Dehy dration Unit Dehydration Lean TEG Cooler Lean Glycol Surge Cold Lean / Rich Ric h Glyc ol Flash Hot Lean / Rich Overhead Separator Dehy dration Glyc ol Reboiler Ref lux Condenser TEG Drain Drum TEG Drain Drum TEG Drain Drum
Inlet KO Drum Dehydration Inlet KO D rum Pump Contactor Drum TEG Circulation Pump TEG Exchanger Drum Gly col Cartr idge Filter Glyc ol Charcoal Filter TEG Exc hanger Regenerator TEG Regeneration Bottom Pump Hot Oil C irculating Pump Pump Pump Motor
50 %
Tag: 21-244- 0... Tag: 21- 244-0... Dehydration Inlet Dehydration Inlet Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244- 0... TEG Circ ulation TEG Circ ulation Tag: 21-244-0... Tag: 21-244-0... Gly col Cartridge Glyc ol Charcoal Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... TEG Regener ation TEG Regeneration Hot Oil C irc ulating Hot Oil C irc ulating Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0...
KO Drum Pump KO Drum Pump Pump Pump Motor Filter Filter Bottom Pump Bottom Pump Motor Pump Pump Motor
100 % Motor 100 % 100 % 100 % 100 % 100 %
Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244- 0... Tag: 21-244- 0... Tag: 21- 244- 0... Tag: 21-244-0... Tag: 21-244-0...
Gas Dehy dration Water Dew Point System
Dehydration Inlet Dehydration Inlet TEG Circ ulation TEG Circ ulation Gly col Cartridge Glyc ol Charcoal TEG Regener ation TEG Regeneration Hot Oil C irc ulating Hot Oil C irc ulating
KO Drum Pump KO Drum Pump Pump Pump Motor Filter Filter Bottom Pump Bottom Pump Motor Pump Pump Motor
100 % Motor 100 % 100 % 100 % 100 % 100 %
Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244- 0... Tag: 21-244- 0... Tag: 21- 244- 0... Tag: 21-244-0... Tag: 21-244-0...
Sweet Gas Cooler Dehy dration Unit Dehydration Lean TEG Cooler Lean Glycol Surge Cold Lean / Rich Ric h Glyc ol Flash Hot Lean / Rich Overhead Separator Dehy dration Glyc ol Reboiler Ref lux Condenser TEG Drain Drum TEG Drain Drum TEG Drain Drum
Inlet KO Drum Dehydration Inlet KO D rum Pump Contactor Drum TEG Circulation Pump TEG Exchanger Drum Gly col Cartr idge Filter Glyc ol Charcoal Filter TEG Exc hanger Regenerator TEG Regeneration Bottom Pump Hot Oil C irculating Pump Pump Pump Motor
50 %
Tag: 21-244- 0... Tag: 21- 244-0... Dehydration Inlet Dehydration Inlet Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244- 0... TEG Circ ulation TEG Circ ulation Tag: 21-244-0... Tag: 21-244-0... Gly col Cartridge Glyc ol Charcoal Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... TEG Regener ation TEG Regeneration Hot Oil C irc ulating Hot Oil C irc ulating Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0...
KO Drum Pump KO Drum Pump Pump Pump Motor Filter Filter Bottom Pump Bottom Pump Motor Pump Pump Motor
100 % Motor 100 % 100 % 100 % 100 % 100 %
Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244-0... Tag: 21-244- 0... Tag: 21-244- 0... Tag: 21- 244- 0... Tag: 21-244-0... Tag: 21-244-0...
Tag: 21-280-01-V-001A Tag: 21-280-01-K-001A Tag: 21-280-01-KM-0... Tag: 21-280-01-E-001A Tag: 21-280-01-V-002A Tag: 21-280-01-K-002A Tag: 21-280-01-E-002A Tag: 21-280-01-V-003A
Flash Gas Flash Gas
Condensate Pump Condensate Pump
100 % Motor
Tag: 21-280-01-V-001B Tag: 21-280-01-K-001B Tag: 21-280-01-KM-0... Tag: 21-280-01-E-001B Tag: 21-280-01-V-002B Tag: 21-280-01-K-002B Tag: 21-280-01-E-002B Tag: 21-280-01-V-003B
Flash Gas Flash Gas
Condensate Pump Condensate Pump
100 % Motor
Rev 14.03.13
By: CHK:
Ethane Extraction System
Rev 14.03.13
By: CHK:
Propane Extraction System
Tag: 21-262-01-T-001 Tag: 21-262-01-E-001 Tag: 21-262-01-EM-0... Tag: 21-262-01-E-002 Tag: 21-262-01-V-001
Depropaniser Reflux Depropaniser Reflux
Pump Pump Motor
100 %
Tag: 21-262-01-T-001B Tag: 21-262-01-E-00... Tag: 21-262-01-EM-0... Tag: 21-262-01-E-00... Tag: 21-262-01-V-00...
Depropaniser Reflux Depropaniser Reflux
Pump Pump Motor
100 %
Rev 14.03.13
By: CHK:
Butane Extraction System
Rev 14.03.13
By: CHK:
Export Gas Compression System
Export Gas Export Gas Export Gas Export Gas Export Gas Comp
Compressor Suction Compressor Compressor Motor Compressor Discharge Cooler
25 % KO Drum Discharge Cooler Motor
Tag: 24-283-01-V-001 Tag: 24-283-01-K-001 Tag: 24-283-01-KM-0... Tag: 24-283-01-E-002 Tag: 24-283-01-EM-0...
Export Gas Export Gas Export Gas Export Gas Export Gas Comp
Compressor Suction Compressor Compressor Motor Compressor Discharge Cooler
25 % KO Drum Discharge Cooler Motor
Tag: 24-283-01-V-00... Tag: 24-283-01-K-00... Tag: 24-283-01-KM-0... Tag: 24-283-01-E-00... Tag: 24-283-01-EM-0...
Export Gas Export Gas Export Gas Export Gas Export Gas Comp
Compressor Suction Compressor Compressor Motor Compressor Discharge Cooler
25 % KO Drum Discharge Cooler Motor
Tag: 24-283-01-V-00... Tag: 24-283-01-K-00... Tag: 24-283-01-KM-0... Tag: 24-283-01-E-00... Tag: 24-283-01-EM-0...
Export Gas Compression System
Export Gas Export Gas Export Gas Export Gas Export Gas Comp
Compressor Suction Compressor Compressor Motor Compressor Discharge Cooler
25 % KO Drum Discharge Cooler Motor
Tag: 24-283-01-V-00... Tag: 24-283-01-K-00... Tag: 24-283-01-KM-0... Tag: 24-283-01-E-00... Tag: 24-283-01-EM-0...
Export Gas Export Gas Export Gas Export Gas Export Gas Comp
Compressor Suction Compressor Compressor Motor Compressor Discharge Cooler
25 % KO Drum Discharge Cooler Motor
Tag: 24-283-01-V-00... Tag: 24-283-01-K-00... Tag: 24-283-01-KM-0... Tag: 24-283-01-E-00... Tag: 24-283-01-EM-0...
Export Gas Export Gas Export Gas Export Gas Export Gas Comp
Compressor Suction Compressor Compressor Motor Compressor Discharge Cooler
25 % KO Drum Discharge Cooler Motor
Tag: 24-283-01-V-001F Tag: 24-283-01-K-001F Tag: 24-283-01-KM-0... Tag: 24-283-01-E-002F Tag: 24-283-01-EM-0...
Export Crude Booster Export Crude Booster Export Crude Main Export Crude Main
Stable HCC Storage & Shipping System Pump Pump Motor Pump Pump Motor
25 % 25 %
Export Crude Booster Export Crude Booster Export Crude Main Export Crude Main
Pump Pump Motor Pump Pump Motor
25 % 25 %
Tag: 22-411-00-TK-002
Off Spec/Inter Tank Off Spec/Inter Tank
Transfer Pump Transfer Pump Motor
50 %
Rev 14.03.13
By: CHK:
LPG Storage System
LPG Storage Bullet
4.16 %
4.16 %
4.16 %
4.16 %
4.16 %
4.16 %
4.16 %
4.16 %
4.16 %
4.16 %
4.16 %
4.16 %
LPG Storage Bullet
LPG Export Pump LPG Export Pump
Tag: 21-353-00-V -... Motor
50 %
LPG Storage Bullet
4.16 %
Tag: 21-413-01-P-00... Tag: 21-413-01-PM-0...
Tag: 21-353-00-V -...
4.16 %
4.16 %
4.16 %
4.16 %
4.16 %
4.16 %
4.16 %
4.32 %
Rev 14.03.13
By: CHK:
Export CO Pipeline System
Rev 14.03.13
By: CHK:
Export SG Pipeline System
Rev 14.03.13
By: CHK:
Export LPG Pipeline System
Rev 14.03.13
By: CHK:
Trunkline Scraper Receiver System
Tag: 20-201-01-Z-001A
Tag: 20-201-01-Z-001B
Trunk Line Scraper Receiver
Tag: 20-201-01-Z-001C
Tag: 20-201-01-Z-001D
Tag: 30-316-00-FL-0...
Tag: 30-316-00-P-004 Tag: 30-316-00-PM-0... Tag: 30-316-00-TK-001 Tag: 30-316-00-P-001 Tag: 30-316-00-PM-0... Tag: 30-316-00-V-002 Hot Oil Side Stream
Hot Oil Feed
(Make-Up) Filters Filter
100 % 33.3 %
Tag: 30-316-00-FL-0...
Rev 14.03.13
By: CHK:
Hot Oil Circulation Hot Oil Circulation
Pump Pump Motor
12.5 %
12.5 %
Tag: 30-316-00-H-00...
Hot Oil Circulation Hot Oil Circulation
Pump Pump Motor
12.5 %
12.5 %
Tag: 30-316-00-H-00...
Hot Oil Circulation Hot Oil Circulation
Pump Pump Motor
12.5 %
12.5 %
Tag: 30-316-00-H-00...
Hot Oil Circulation Hot Oil Circulation
Pump Pump Motor
12.5 %
Tag: 30-316-00-H-00...
Hot Oil Circulation Hot Oil Circulation Hot Oil Bypass Cooler Hot Oil Bypass Cooler Hot Oil Drain Drum Hot Oil Drain Drum Hot Oil Drain Drum
Hot Oil Fired Heater Pump Pump Motor Motor Pump Pump Motor
12.5 %
Tag: 30-316-00-P-00... Tag: 30-316-00-PM-0... Tag: 30-316-00-E-001 Tag: 30-316-00-EM-0... Tag: 30-316-00-V-001 Tag: 30-316-00-P-003 Tag: 30-316-00-PM-0...
Hot Oil Fired Heater
Tag: 30-316-00-H-00...
Hot Oil Circulation Hot Oil Circulation
Pump Pump Motor
12.5 %
12.5 %
Tag: 30-316-00-H-001F
Hot Oil Circulation Hot Oil Circulation
Pump Pump Motor
12.5 %
12.5 %
Tag: 30-316-00-H-00...
Hot Oil Circulation Hot Oil Circulation
Pump Pump Motor
12.5 %
12.5 %
Tag: 30-316-00-H-00...
Hot Oil Circulation Hot Oil Circulation
Pump Pump Motor
12.5 %
Rev 14.03.13
By: CHK:
Cooling Water Cooling Water
Circulation Pump Circulation Pump
16.7 % Motor
Tag: 30-335-00-CT-0... Tag: 30-355-00-CTM... Cooling Water Cooling Water Cooling Water Side Cooling Tower Drain Cooling Tower Drain CT Drain Water Basin
Cooling Tower Circulation Pump Circulation Pump Stream Filter Water Basin Water Basin Pump Pump Motor
16.66 % Motor 50 %
Tag: 30-335-00-P-00... Tag: 30-335-00-PM-0... Tag: 30-335-00-FL-0... Tag: 30-335-00-BA-0... Tag: 30-335-00-P-002 Tag: 30-335-00-PM-0...
Cooling Tower Cooling Tower Motor
Cooling Water System
50 %
Tag: 30-335-00-CT-0... Tag: 30-355-00-CTM... Cooling Water Cooling Water Cooling Water Side
Circulation Pump Circulation Pump Stream Filter
16.66 % Motor 50 %
Rev 14.03.13
By: CHK:
Propane Refrigeration Comp System
Tag: 21-353-00-V-00...
Propane Emptying Propane Emptying
Pum p Pump Motor
100 %
Propane Storage
Bullet
Propane Emptying Propane Emptying 25 %
Pum p Pump Motor
100 %
LP Fuel Gas KO
Drum
Tag: 30-351-00-V-001
Rev 14.03.13
By: CHK:
HP Flare Pump HP Flare Pump Motor
50 %
HP Flare System
50 %
HP Flare System
HP Flare System
Rev 14.03.13
By: CHK:
LP Flare Pump LP Flare Pump Motor
50 %
LP Flare System
50 %
LP Flare System
LP Flare System
Rev 14.03.13
By: CHK:
Cold Flare Pump Cold Flare Pump
Motor
50 %
Cold Flare KO Drum Cold Flare KO Drum Cold Flare Pump Cold Flare Pump
Electric Heater Motor
50 % 50 %
Cold Flare KO Drum Cold Flare KO Drum Cold Flare Pump Cold Flare Pump
Electric Heater Motor
50 % 50 %
Rev 14.03.13
By: CHK:
LLP Flare Pump LLP Flare Pump
LLP Flare System Motor
100 %
Tag: 30-420-00-V-004
LLP Flare Pump LLP Flare Pump
Motor
100 %
Rev 14.03.13
By: CHK:
Plant & Instrument Air System
Instrument Air
Emergency Hold Up
50 % Vessel
Tag: 30-322-00-V-00...
Instrument Air Plant Air Receiver
Instrument Air Emergency Hold Up Vessel Receiver
Tag: 30-322-00-V-00...
Rev 14.03.13
By: CHK:
Oil Drainage System
Rev 14.03.13
By: CHK:
Service Water System
Service/Fire Water
Storage Tank
50 %
Tag: 30-337-00-TK-0...
Service/Fire Water Storage
Service/Fire Water
Storage Tank
50 %
Tag: 30-337-00-TK-0...
Rev 14.03.13
By: CHK:
Desalter Service Water System
GTP Closed Drain GTP Closed Drain GTP Closed Drain GTP Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
50 %
GTP Closed Drain GTP Closed Drain GTP Closed Drain GTP Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
50 %
Rev 14.03.13
By: CHK:
CPF Closed Drainage System
CPF Closed Drain CPF Closed Drain CPF Closed Drain CPF Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
16.7 %
CPF Closed Drain CPF Closed Drain CPF Closed Drain CPF Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
16.66 %
CPF Closed Drain CPF Closed Drain CPF Closed Drain CPF Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
16.66 %
CPF Closed Drain CPF Closed Drain CPF Closed Drain CPF Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
16.66 %
CPF Closed Drain CPF Closed Drain CPF Closed Drain CPF Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
16.66 %
CPF Closed Drain CPF Closed Drain CPF Closed Drain CPF Closed Drain
Drum Drum Pump Drum Pump Motor Drum Heater
16.66 %
Rev 14.03.13
By: CHK:
Propane Drainage System
Propane Drain Drum Propane Drain Drum Propane Drain Drum Propane Drain Drum
Cooler Pump Pump Motor
Rev 14.03.13
By: CHK:
Cryogenic Drainage System
Rev 14.03.13
By: CHK:
Water Injection System
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection Water Injection Water Injection Main Water Injection Main
Booster Pump Booster Pump Motor Pump Pump Motor
5.88 % 5.88 %
Water Injection
Booster Pump
Water Injection
Booster Pump Motor
5.88 %
Water Injection Main
Pump
Water Injection Main
Pump Motor WATER INJECTION BC_IFU
5.88 %
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
Injection Well
5.88 %
Tag: 11-XXX-00-P...
WATER INJECTION BC_IFU
Injection Well
Injection Well
Injection Well
Rev 14.03.13
By: CHK:
PS-1 Storage and Product Loading System
50 %
50 %
APPENDIX B1
RELIABILITY & MAINTAINABILITY DATASHEET FOR GI CONCEPT CASE
(TOTAL: 10 PAGES)
8015-0152- -00-000-PC-RP-00008_IFU.docx
RELIABILITY & MAINTAINABILITY DATASHEET FOR GAS INJECTION CONCEPT
Page 1 of 10
RELIABILITY & MAINTAINABILITY DATASHEET FOR GAS INJECTION CONCEPT
Page 2 of 10
RELIABILITY & MAINTAINABILITY DATASHEET FOR GAS INJECTION CONCEPT
Page 3 of 10
RELIABILITY & MAINTAINABILITY DATASHEET FOR GAS INJECTION CONCEPT
Page 4 of 10
RELIABILITY & MAINTAINABILITY DATASHEET FOR GAS INJECTION CONCEPT
Page 5 of 10
RELIABILITY & MAINTAINABILITY DATASHEET FOR GAS INJECTION CONCEPT
Page 6 of 10
RELIABILITY & MAINTAINABILITY DATASHEET FOR GAS INJECTION CONCEPT
Page 7 of 10
RELIABILITY & MAINTAINABILITY DATASHEET FOR GAS INJECTION CONCEPT
Page 8 of 10
RELIABILITY & MAINTAINABILITY DATASHEET FOR GAS INJECTION CONCEPT
Page 9 of 10
RELIABILITY & MAINTAINABILITY DATASHEET FOR GAS INJECTION CONCEPT
Page 10 of 10
PRE-FEED SERVICES CONTRACT WORLEY PARSONS
LIMITED FORMATION DEVELOPMENT
PROJECT,
Doc. title Reliability, Availability and Maintainability Study
Rev.: 0 Status: IFU
COMPANY No.:
8015-0152- -00-000-PC-RP-00008
Contractor No.: Page: 38 of 38
APPENDIX B2
RELIABILITY & MAINTAINABILITY DATASHEET FOR WI CONCEPT CASE
(TOTAL: 14 PAGES)
8015-0152- -00-000-PC-RP-00008_IFU.docx
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 1 of 14
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 2 of 14
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 3 of 14
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 4 of 14
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 5 of 14
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 6 of 14
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 7 of 14
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 8 of 14
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 9 of 14
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 10 of 14
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 11 of 14
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 12 of 14
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 13 of 14
RELIABILITY & MAINTAINABILITY DATASHEET FOR WATER INJECTION CONCEPT
Page 14 of 14