MOZAMBIQUE CO HVAC UPGRADE


PROJECT

VENTILATION SYSTEM MEASUREMENTS

TESTING AND INSPECTION BULLETIN BEV N⁰ 01


POST-SERVICE TESTING

LOCATION:

VERIFICATION:

Predicted Measured Temperature


energy energy [ºC]
Ventilation
Location Model consumption consumption Humidity
Unit
at speed 4 at speed 4 Int Ext
[A] [A]
Cafeteria
REC1 LGH-65VX-E 1.65 0.99 24.5 24.5
B1-3
Meeting
LGH-100VX-
REC2 room 2.5 2.00 24.4 23.5
E
B1-2
Meeting
LGH-100VX-
REC3 room 2.5 2.10 24.3 24.8
E
B2-8
Veranda
REC4 LGH-50VX-E 1.15 0.89 24.6 24.4
B3-9
Veranda
REC5 LGH-50VX-E 1.15 0.97 24.5 24.6
B3-10
Veranda
REC6 LGH-50VX-E 1.15 0.89 24.6 23.8
B4-10
Veranda
REC7 LGH-50VX-E 1.15 0.97 23.7 23.6
B4-9
Corridor
REC8 LGH-65VX-E 1.65 1.40 25.8 26.3
B5-10
Corridor
REC9 LGH-65VX-E 1.65 1.21 25.4 25.3
B5-2
Office LGH-100VX-
REC10 2.5 1.98 25.4 25.3
B6-9 E
Kitchen CVAB-
VEX.COZ 1.35 0.88
B1-6 1400/250N
WORLD BANK GROUP
01-09-22
Pag. 1
of 2
WORLD BANK
GROUP

OBSERVATIONS:

AIR FLOW MEASUREMENTS

AIRFLOW
CALCULATION = v x Area of Effect of the grille x 1,33 (insuflaction) = v x 67
= v x Area of Effect of the grille x 1,6 (extraction) = v x 81

REC1 (MAX AIR FLOW 650 m3/h)

Measured
Max air Calculated
Grill air flow Difference
Type flow air flow
# speed [%]
[m3/h] [m3/h]
[m/s]

1 200 2.4 160.8 -20%


Insuflation
2 200 - -
Total 400

3 200 1.7 137.7 -31%


Extraction 4 200 - - -
5 200 1.6 129.6 -35%
Total 600

WORLD BANK GROUP


01-09-22
Pag. 2
of 2
WORLD BANK
GROUP

REC 2 (MAX AIR FLOW 1000 m3/h)

Measured
Max air Calculated
Grill air flow Difference
Type flow air flow
# speed [%]
[m3/h] [m3/h]
[m/s]

1 350 - -
Insuflation 2 350 - -
3 350 - -
Total 1050

4 350 - -
Extraction 5 350 - -
6 350 - -
Total 1050

REC 3 (MAX AIR FLOW 1000 m3/h)

Measured
Max air Calculated
Grill air flow Difference
Type flow air flow
# speed [%]
[m3/h] [m3/h]
[m/s]

1 350 3.6 241.2 -31%


Insuflation 2 350 4.2 281.4 -20%
3 350 5 335 -4%
Total 1050 857.6 -18%

4 350 3.4 275.4 -21%


Extraction 5 350 3.5 283.5 -19%
6 350 4.5 364.5 4%
Total 1050 923.4 -12%

WORLD BANK GROUP


01-09-22
Pag. 3
of 2
WORLD BANK
GROUP

REC 4 (MAX AIR FLOW 500 m3/h)

Measured
Max air Calculated
Grill air flow Difference
Type flow air flow
# speed [%]
[m3/h] [m3/h]
[m/s]

1 100 1.4 93.8 -6%


2 100 1.6 107.2 7%
Insuflation
3 100 1.4 93.8 -6%
4 100 1.6 107.2 7%
Total 400 402 1%

5 100 1.2 97.2 -3%


Extraction 6 100 1.2 97.2 -3%
7 100 1.1 89.1 -11%
Total 300 283.5 -6%

REC 5 (MAX AIR FLOW 500 m3/h)

Measured
Max air Calculated
Grill air flow Difference
Type flow air flow
# speed [%]
[m3/h] [m3/h]
[m/s]

1 200 2.9 194.3 -3%


Insuflation 2 200 2.8 187.6 -6%
3 100 1.4 93.8 -6%
Total 500 475.7 -5%

4 200 2.3 186.3 -7%


Extraction 5 200 1.7 137.7 -31%
6 100 1.2 97.2 -3%
Total 500 421.2 -16%

WORLD BANK GROUP


01-09-22
Pag. 4
of 2
WORLD BANK
GROUP

REC 6 (MAX AIR FLOW 500 m3/h)

Measured
Max air Calculated
Grill air flow Difference
Type flow air flow
# speed [%]
[m3/h] [m3/h]
[m/s]

1 150 2 134 -11%


Insuflation
2 150 - - -
Total

3 150 1.7 137.7 -8%


Extraction 4 150 1.6 129.6 -14%
5 150 - - -
Total 350

REC 7 (MAX AIR FLOW 500 m3/h)


Measured
Max air Calculated
Grill air flow Difference
Type flow air flow
# speed [%]
[m3/h] [m3/h]
[m/s]
1 150 3.3 221.1 47%
Insuflation
2 150 3.1 207.7 38%
Total 300 428.8 43%

3 150 1.8 145.8 -3%


Extraction 4 150 1.7 137.7 -8%
5 150 1.7 137.7 -8%
Total 450 421.2 -6%

WORLD BANK GROUP


01-09-22
Pag. 5
of 2
WORLD BANK
GROUP

REC 8 (MAX AIR FLOW 650 m3/h)

Measured
Max air Calculated
Grill air flow Difference
Type flow air flow
# speed [%]
[m3/h] [m3/h]
[m/s]

1 100 1.4 93.8 -6%


2 100 1.8 120.6 21%
Insuflation 3 100 1.4 93.8 -6%
4 100 1.8 120.6 21%
5 100 1.7 113.9 14%
Total 500 542.7 9%

6 100 1.2 97.2 -3%


7 100 1 81 -19%
Extraction 8 100 1.1 89.1 -11%
9 100 1.5 121.5 22%
10 100 1.1 89.1 -11%
Total 500 477.9 -4%

REC 9 (MAX AIR FLOW 650 m3/h)


Measured
Max air Calculated
Grill air flow Difference
Type flow air flow
# speed [%]
[m3/h] [m3/h]
[m/s]
1 200 2.4 160.8 -20%
2 100 2.2 147.4 47%
Insuflation
3 150 3.3 221.1 47%
4 100 1.3 87.1 -13%
Total 550 616.4 12%

5 200 1.9 153.9 -23%


6 100 1.2 97.2 -3%
Extraction
7 150 1.6 129.6 -14%
8 100 1.7 137.7 38%
Total 550 518.4 -6%

WORLD BANK GROUP


01-09-22
Pag. 6
of 2
WORLD BANK
GROUP

REC 10 (MAX AIR FLOW 1000 m3/h)


Measured
Max air Calculated
Grill air flow Difference
Type flow air flow
# speed [%]
[m3/h] [m3/h]
[m/s]
1 100 1.8 93.8 -6%
2 100 1.8 93.8 -6%
3 100 2 107.2 7%
Insuflation
4 100 2 107.2 7%
5 100 1.8 93.8 -6%
6 100 1.8 93.8 -6%
Total 600 589.6 -2%

7 100 1 81 -19%
8 100 1 81 -19%
9 100 1.3 105.3 5%
Extraction
10 100 1.6 129.6 30%
11 100 1.6 129.6 30%
12 100 1.2 97.2 -3%
Total 600 623.7 4%

VEX.COZ (MAX AIR FLOW 1920 m3/h)

Measured
Max air Calculated
Grill air flow Difference
Type flow air flow
# speed [%]
[m3/h] [m3/h]
[m/s]

1 300 192.6 -36%


Extraction 2 300 154.8 -48%
3 300 158.4 -47%
Total 900 505.8

WORLD BANK GROUP


01-09-22
Pag. 7
of 2
WORLD BANK
GROUP

OBSERVATIONS:

USED EQUIPMENT
IDENTIFICATION BRAND/MODEL CALIBRATION DATE
Anemometer ACDC – MS 6250
Thermometer TST - 880SX

VALIDATION:

ACCEPTED

ACCEPTED CONDITIONALLY

NOT ACCEPTED

OBSERVATIONS:

Name: Signature Date: ___/___/___

Name: Signature Date: ___/___/___

Name: Signature Date: ___/___/___

Name: Signature Date: ___/___/___

Name: Signature Date: ___/___/___

Name: Signature Date: ___/___/___

WORLD BANK GROUP


01-09-22
Pag. 8
of 2
LEGENDA
FRESH AIR DUCTS - ISOLATED

EXHAUST AIR DUCTS - ISOLATED

BATHROOM AIR EXHAUST DUCTS

REC VENTILATION UNIT

VEX EXHAUST FAN

G SUPPLY/EXHAUST GRILLE

GEXT OUTDOOR LOUVRE

G.04
350 m3/h
ø 200
AIR TERMINALS
G.04 G.01 G.01
REF.ª BRAND MODEL DIMENSIONS
350 m3/h 700 m3/h
ø 200 G.05
250 x 200 G.01 TROX AT-AG 225x125
Cafeteira350 m3/h 350 m3/h
G.02 TROX AT-AG 225x125
ø 200 ø 200
GEXT.01 TROX AWK 300x200
1050 m3/h
GEXT.02 TROX AWK 400x300
300 x 200
GEXT.03 TROX AWK 500x300
G.05 Maputo 4 (I-102) GEXT.04 TROX AWK 600x300
G.02 GEXT.05 TROX AWK 800x300

700 m3/h G.02 700 m3/h GEXT.04 GEXT.06 TROX AWK 1000x500
700 m3/h 250 x 200 250 x 200 GEXT.04
GEXT.04 1050 m3/h
250 x 200 G.06
300 x 200

1050 m3/h
REC UVc 1050 m3/h 650 x 100
03 350 m3/h
300 x 200 350 m3/h
ø 200
ø 200
1050 m3/h
300 x 200
REC
G.03 02
G.06 G.03
350 m3/h 350 m3/h
ø 200 ø 200 GEXT.04

400 m3/h
ø 200
400 m3/h
ø 200 REC
01

GEXT.06 G.02 600 m3/h UVc


200 x 200
GEXT.03
G.02 G.02 G.02
200 m3/h 200 m3/h
VEX.COZ ø 160 ø 160
600 m3/h 300 m3/h EMPREITEIRO / CONTRACTOR
900 m3/h ø 250 ø 200 MOZAGO, Lda
ø 300 GEXT.03 Rua de Mbuzine, nº 501
100 m3/h Maputo - Mozambique
ø 125 +258 21 467 962

G.03 G.04
I-203 info@mozago.com

GEXT.01 CLIENTE / CLIENT


G.01 G.05
I-202 200 m3/h WORLD BANK GROUP

ø 160 1224 Kenneth Kaunda Avenue


VEX.IS VEX.IS MAPUTO - MOZAMBIQUE
200 m3/h +258 85 020 8267
VEX.IS ø 160 mhorton@worldbank.org

PROJECTO / PROJECT NAME


HVAC UPGRADE PROJECT WORLD BANK
GROUP

Maputo
MAPUTO - MOZAMBIQUE

DESENHO / DRAWING NAME


BUILDING I GROUND FLOOR - DUCTING

DATA / DATE FASE / PHASE


12-Sep-22 AS-BUILT

ESCALA / SCALE DESENHO Nº / DRAWING NO.


SE | A3 02.1
MZG-F-CM-013-R0

GSPublisherVersion 0.0.100.100
LEGENDA
FRESH AIR DUCTS - ISOLATED

EXHAUST AIR DUCTS - ISOLATED

BATHROOM AIR EXHAUST DUCTS

REC VENTILATION UNIT

VEX EXHAUST FAN

G SUPPLY/EXHAUST GRILLE

GEXT OUTDOOR LOUVRE

REC REC
04 05
500 m3/h AIR TERMINALS
200 x 200
200 m3/h 500 m3/h 650 m3/h 300 m3/h 500 m3/h UVc 200 m3/h
REF.ª BRAND MODEL DIMENSIONS
ø 160 200 x 200 200 x 200 ø 200 200 x 200 ø 160
G.01
G.01 TROX AT-AG 225x125
100 m3/h G.02 TROX AT-AG 225x125
G.03 ø 125 G.05 G.06 G.02 G.01 G.04 G.05 G.02
150 m3/h GEXT.01 TROX AWK 300x200
ø 160 GEXT.02 TROX AWK 400x300
450 m3/h 100 m3/h GEXT.03 TROX AWK 500x300
I-3-307 200 x 200 GEXT.04 TROX AWK 600x300
I-3-303 ø 125
GEXT.05 TROX AWK 800x300
100 m3/h
100 m3/h GEXT.06 TROX AWK 1000x500
ø 125
ø 125 I-3-305
I-3-306
I-3-304
G.04 G.07 G.03

I-3-308 I-3-302
100 m3/h
I-3-309
I-3-301 ø 125

GEXT.01

G.06
GEXT.01

100 m3/h VEX.IS VEX.IS


ø 125 100 m3/h
ø 125

G.03 I-4-404 G.03

I-4-401
I-4-403
I-4-402 EMPREITEIRO / CONTRACTOR
MOZAGO, Lda
I-4-405 150 m3/h Rua de Mbuzine, nº 501
ø 160 Maputo - Mozambique

150 m3/h +258 21 467 962


info@mozago.com
ø 160
150 m3/h
CLIENTE / CLIENT
ø 160 WORLD BANK GROUP
1224 Kenneth Kaunda Avenue
MAPUTO - MOZAMBIQUE
300 m3/h 150 m3/h 150 m3/h 300 m3/h
+258 85 020 8267
ø 200 ø 160 ø 160 ø 200
G.02 G.04 G.01 G.05 G.02 G.01 G.05 G.01 G.04 mhorton@worldbank.org

PROJECTO / PROJECT NAME


600 m3/h 300 m3/h HVAC UPGRADE PROJECT WORLD BANK
UVc 300 m3/h UVc
450 m3/h
ø 200 200 x 200 ø 200 GROUP
200 x 200
REC REC
06 07 Maputo
MAPUTO - MOZAMBIQUE

DESENHO / DRAWING NAME


BUILDING I FIRST FLOOR - DUCTING

DATA / DATE FASE / PHASE


12-Sep-22 AS-BUILT

ESCALA / SCALE DESENHO Nº / DRAWING NO.


SE | A3 02.2
MZG-F-CM-013-R0

GSPublisherVersion 0.0.100.100
LEGENDA
FRESH AIR DUCTS - ISOLATED

EXHAUST AIR DUCTS - ISOLATED

BATHROOM AIR EXHAUST DUCTS

REC VENTILATION UNIT

VEX EXHAUST FAN

G SUPPLY/EXHAUST GRILLE

GEXT OUTDOOR LOUVRE

AIR TERMINALS

REF.ª BRAND MODEL DIMENSIONS

G.05

G.04
G.09

G.10

G.08

G.03
G.03
G.01 TROX AT-AG 225x125
100 m3/h 100 m3/h 100 m3/h
100 m3/h G.02 TROX AT-AG 225x125

G.08
100 m3/h

G.02
ø 125
ø 125 ø 125 ø 125 ø 125 GEXT.01 TROX AWK 300x200
150 m3/h GEXT.02 TROX AWK 400x300
150 m3/h 150 m3/h
ø 160
ø 160 ø 160 GEXT.03 TROX AWK 500x300
GEXT.04 TROX AWK 600x300

G.07
GEXT.05 TROX AWK 800x300
250 m3/h 150 m3/h GEXT.06 TROX AWK 1000x500
ø 200 250 m3/h ø 160
ø 200

300 m3/h 250 m3/h


550 m3/h ø 200 ø 200 300 m3/h
ø 250 ø 200
350 m3/h
ø 200 200 m3/h
ø 160
200 m3/h
100 m3/h 650 m3/h 200 m3/h 100 m3/h 100 m3/h
ø 125
100 m3/h UVc ø 200 ø 160 UVc ø 160
ø 125 ø 125

ø 125 650 m3/h


G.01

ø 250

G.06

G.07

G.05
G.04

G.01
REC REC

G.02

G.06
200 m3/h
08 09
ø 160

GEXT.01 650 m3/h 650 m3/h 550 m3/h 550 m3/h


ø 250 ø 250 ø 250 ø 250

VEX.IS GEXT.01
100 m3/h VEX.IS
ø 125 100 m3/h
ø 125

I-6-601
EMPREITEIRO / CONTRACTOR
MOZAGO, Lda
G.12 G.06 Rua de Mbuzine, nº 501
100 m3/h
Maputo - Mozambique
ø 125
+258 21 467 962
info@mozago.com
200 m3/h 300 m3/h 400 m3/h
G.10 G.09 ø 160 G.08 ø 200 ø 200 G.07 100 m3/h G.11
100 m3/h CLIENTE / CLIENT
ø 125 ø 125
WORLD BANK GROUP
600 m3/h 1224 Kenneth Kaunda Avenue
ø 250
100 m3/h 100 m3/h 100 m3/h
MAPUTO - MOZAMBIQUE
600 m3/h
ø 125 ø 125 ø 125 +258 85 020 8267
ø 250
600 m3/h
REC mhorton@worldbank.org
ø 250
10 600 m3/h
ø 250 PROJECTO / PROJECT NAME
UVc
HVAC UPGRADE PROJECT WORLD BANK
200 m3/h 300 m3/h 400 m3/h GROUP
ø 160 ø 200 ø 200

G.05 G.04 G.03 G.02 G.01 Maputo


MAPUTO - MOZAMBIQUE

DESENHO / DRAWING NAME


BUILDING I SECOND FLOOR - DUCTING

DATA / DATE FASE / PHASE


12-Sep-22 AS-BUILT

ESCALA / SCALE DESENHO Nº / DRAWING NO.


SE | A3 02.3